Space Program Final
Space Program Final
Space Requirements
Activities
Number
Area/Person
of Users
Sub
Total
Area
(A)
Furniture
Number
Area/Furniture
of
Furniture
Sub
Total
Area
(B)
Total
(A+B)
Circulation
Space 30% (C)
Total (D)
19.795
5.94
25.735
10.56
3.17
13.728
10.56
3.17
13.728
20.88
6.27
27.144
10.74
3.22
13.962
5.62
1.69
7.306
16.36
4.91
21.268
10.74
3.22
13.962
10.74
3.22
13.962
47.52
14.26
61.776
ADMINISTRATIVE DEPARTMENT
10
1.5
15
COUNTER
TABLE
CHAIR
SOFA
.45x1.5
0.32
0.12
1.5
1
2
4
2
0.675
0.64
0.48
3
TABLE
0.32
0.32
CHAIR
TABLE
CHAIR
TABLE
0.12
0.32
0.12
0.32
2
1
2
2
0.24
0.32
0.24
0.64
CHAIR
CHAIR
TABLE
0.12
0.12
0.5
2
2
1
0.24
0.24
0.5
1
1
3
2
2
1
2
1
20
1
0.12
0.5
0.36
1
0.24
0.5
0.24
0.5
3.2
4.32
Rail Administration
Office of the General
Manager
Work, Monitor
10
Work, Monitor
10
Corporate Planning
Division
Work, Monitor
20
Legal Office
Work, Monitor
10
Officer-in-Charge
Work, Monitor
Administrative General
Service Division
Work, Monitor
15
Controllership Division
Work, Monitor
10
Work
10
Conference Room
Work, Meeting
20
40
CHAIR
TABLE
CHAIR
TABLE
CHAIR
TABLE
CHAIR
TABLE
CHAIR
LONG TABLE
0.12
0.5
0.12
0.5
0.12
0.5
0.12
0.5
.4x.4
1.2x3.6
SPACE PROGRAM
Space Requirements
Activities
Number
of Users
Area/Person
Sub
Total
Area
(A)
Furniture
Area/Furniture
Number
of
Furniture
Sub
Total
Area
(B)
1
1
5
5
5
5
2
2
5
5
2
2
2
2
2
2
12
6
20
1
0.12
0.5
0.6
2.5
0.6
2.5
0.6
1
0.6
2.5
0.24
1
0.24
1
0.24
1
1.44
3
3.2
7.92
Total
(A+B)
Circulation
Space 30% (C)
Total (D)
5.62
1.69
7.306
28.1
8.43
30.23
28.1
8.43
30.23
11.6
3.48
15.08
28.1
8.43
30.23
11.24
3.37
14.612
11.24
3.37
14.612
11.24
3.37
14.612
64.44
19.33
83.772
51.12
15.33
66.456
2030.825
609.25
2640.072
Officer-in-Charge
Train Personnel
Division
Train Control and
Terminal Division
Telecom, Signal and
Electric Division
Stations Operations
Division
Evaluation and Design
Division
Engineering workshop
Division
Bridge and Building
Division
Safety and
Maintenance Division
Conference Room
Work, Monitor
Work, Monitor
25
Work, Monitor
25
Work, Monitor
10
Work, Monitor
25
Work, Monitor
10
Work, Monitor
10
Work, Monitor
10
Work, Monitor
12
60
Work, Meeting
20
40
CHAIR
TABLE
CHAIR
TABLE
CHAIR
TABLE
CHAIR
TABLE
CHAIR
TABLE
CHAIR
TABLE
CHAIR
TABLE
CHAIR
TABLE
CHAIR
TABLE
CHAIR
TABLE
0.12
0.5
0.12
0.5
0.12
0.5
0.12
0.5
0.12
0.5
0.12
0.5
0.12
0.5
0.12
0.5
0.12
0.5
.4x.4
1.2x3.6
Pathways or Roads
Space where
inquirers can ask
details
Space where
inquirers can ask
details
1000
BENCH
.6x1.8
10
10.8
COUNTER
.45x1.5
2.025
BOOTH
3x2
18
2000
SPACE PROGRAM
Space Requirements
Activities
Number
of Users
Area/Person
Sub
Total
Area
(A)
Ticket Buying,
Getting of Baggage
500
1000
Sub
Total
Area
(B)
Furniture
Area/Furniture
Number
of
Furniture
BENCH
.6x1.8
6.48
BOOTH
3x2
48
COUNTER
.45x1.5
2.7
SLOT
MACHINE
.6x.6
20
0.12
0.5
1.8
0.2
0.12
3
1
3
5
5
0.36
0.5
5.4
1
0.6
0.3
2.4
0.2
Total
(A+B)
Circulation
Space 30% (C)
Total (D)
1064.18
319.25
1383.434
41.26
12.38
53.638
19
5.7
24.7
18.4
5.52
23.92
Hygienic Purposes
10
1.5
15
For Departure
600
1200
CHAIR
TABLE
BED
SINK
URINAL
WATER
CLOSET
SINK
WATER
CLOSET
BENCH
Waiting Area
200
400
BENCH
.6x1.8
10
10.8
410.8
123.24
534.04
100
1000
2
2
200
2000
1.5
15
34.2
6.48
1
0.6
304.46
2608.424
10
6
6
5
5
70.26
601.94
Hygienic Purposes
1.9x3
.6x1.8
0.2
0.12
234.2
2006.48
KIOSK
BENCH
SINK
URINAL
WATER
CLOSET
SINK
WATER
CLOSET
19
5.7
24.7
0.3
2.4
0.2
0.3
2.4
18.4
5.52
23.92
Clinic
35
Hygienic Purposes
10
1.5
15
Hygienic Purposes
10
1.5
15
0.3
2.4
.6x1.8
14
15.12
1215.12
364.54
1579.656
SPACE PROGRAM
Space Requirements
Activities
Number
of Users
Area/Person
Sub
Total
Area
(A)
Furniture
Area/Furniture
Number
of
Furniture
Sub
Total
Area
(B)
Total
(A+B)
Circulation
Space 30% (C)
Total (D)
16.86
5.06
21.918
16.86
5.06
21.918
16.6
4.98
21.58
16.6
4.98
21.58
0.12
0.36
TABLE
CHAIR
TABLE
LOCKER
CHAIR
TABLE
LOCKER
CHAIR
TABLE
0.5
0.12
0.5
1.5
0.12
0.5
1.5
0.12
0.5
3
3
3
5
5
2
5
5
2
1.5
0.36
1.5
7.5
0.6
1
7.5
0.6
1
2.6
EQUIPMENT
.2x.25
0.45
3.05
0.915
3.965
1.3
2.6
GENERATOR
.6x1.2
2.16
4.76
1.43
6.188
1.3
2.6
TRANSFORMER
1.5x3
13.5
16.1
4.83
20.93
1.3
2.6
PUMP
1.2
3.6
6.2
1.86
8.06
1.3
2.6
GARBAGE BIN
0.63
3.15
5.75
1.73
7.475
Work, Monitor
15
Surveillance Room
Work, Monitor
15
Personnel Quarters
with Lockers
Relax, Lounging,
Rest
1.5
7.5
Relax, Lounging,
Rest
1.5
7.5
1.3
Genset Room
Transformer Room
Pump Room
Waste Sorting and
Collection Area
Room Requirements
Room Requirements
ADMINISTRATIVE DEPARTMENT
Entrance Lobby with Visitors Lounge`
Zoning
Public
SemiPublic
SemiPrivate
Rail Administration
Office of the General Manager
Office of the Assistant General Manager
Corporate Planning Division
Legal Office
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
Acoustics
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*