Goldhill
Goldhill
Nature of
Problem
Some slabs needed to be cored for installation of
M & E services. Localised strengthening was required to restore the slab capacity.
The Solution
Strengthening to slab was carried out using Carbon Fibre Reinfoced Polymer
(CFRP) Laminate.
Year 2007