Calculating Oee Worksheet
Calculating Oee Worksheet
Give it a try! Using the table below, fill in the highlighted areas with your production data for a
single shift. Use the key letters to help guide you. In some cases, you may have to convert units to
simplify the calculation. For example, 3600 PPH (Pieces per Hour) is 60 PPM (Pieces per Minute).
First lets get the data:
Production Data
Calculated Data
Shift Length
Hours
Short Breaks
Breaks
Minutes Each
Meal Break
Breaks
Minutes Each
Down Time
E
F
Reject Pieces
Minutes
B
C
Minutes Total
Minutes Total
Minutes
PPM (Pieces Per Minute)
Pieces
Pieces
Now lets calculate the support variables using the above information:
Support Variable
Calculation
Calculated Data
Planned
Production Time
Shift Length-Breaks
Operating Time
Good Pieces
A
H
F
(B+C)
Minutes
Minutes
Pieces
Calculation
Calculated Data
Availability
Operating Time /
Planned Production Time
Performance
Quality
Overall OEE
Availability x Performance x
Quality
J
K
/
/
/
x
H
I
F
L
=
/
K
E
=
x
OEE %
L
M
=
=
=
=
K x 100
L x 100
M x 100
N x 100
2002-2003 Vorne Industries Inc., Itasca, IL USA +1 (630) 875-3600 www.vorne.com www.oee.com
%
%
%
%
OEE Example
Heres how it looks. The following example is an 8-hour shift with two scheduled 15 minute breaks
and a 30 minute meal period running hypothetical production:
Production Data
Shift Length
Short Breaks
2 @ 15 min. = 30 minutes
Meal Break
1 @ 30 min. = 30 minutes
Down Time
47 minutes
Total Pieces
19,271 pieces
Reject Pieces
423 pieces
Calculation
Calculated Data
Result
Planned
Production Time
Shift Length-Breaks
480-60 minutes
420 minutes
Operating Time
420-47 minutes
373 minutes
Good Pieces
19,271-423 pieces
18,848 pieces
The next table shows how the OEE percentage is calculated using the collected production data and
calculated support variables:
OEE Factor
Calculation
Calculated Data
OEE %
Availability
Operating Time /
Planned Production Time
Performance
Quality
Overall OEE
Availability x Performance x
0.8881 x 0.8611 x 0.9780
Quality
0.8881 (88.81%)
0.9780 (97.80%)
0.7479 (74.79%)
The final calculated OEE percentage is a respectable 74.8%, however, World Class OEE is
considered to be 85% or better! Clearly this process could use some improvement, how about
yours?
OEE Factor
World Class
Availability
90.0%
Performance
95.0%
Quality
99.9%
Overall OEE
85.0%
2002-2003 Vorne Industries Inc., Itasca, IL USA +1 (630) 875-3600 www.vorne.com www.oee.com