0% found this document useful (0 votes)
113 views10 pages

TENDER Structure (Residential)

This document is a drawing register for a building project titled "Taman Wahyu (ECOSKY)". It lists 102 drawings related to the building works, including general notes, column schedules, liftcore details, staircase details, shear wall details, ramp details, basement plans and details, and lower ground plans and details. The drawings were issued between December 2013 and August 2014 and many have undergone revisions. The drawing register provides the drawing number, title, issue date and revision number for each listed drawing.

Uploaded by

Alex Ferrari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
113 views10 pages

TENDER Structure (Residential)

This document is a drawing register for a building project titled "Taman Wahyu (ECOSKY)". It lists 102 drawings related to the building works, including general notes, column schedules, liftcore details, staircase details, shear wall details, ramp details, basement plans and details, and lower ground plans and details. The drawings were issued between December 2013 and August 2014 and many have undergone revisions. The drawing register provides the drawing number, title, issue date and revision number for each listed drawing.

Uploaded by

Alex Ferrari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 10

JURUTERA PERUNDING TEKAD MAJU SDN BHD

DRAWING REGISTER

BUILDING WORKS
Project No.

JP039 - (Tender)

Project Title

Taman Wahyu (ECOSKY)

Date

12/18/2014
Drawing No.

No

1
2
3
4
5

6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

Date Issued
Date

General Notes
T/JPT/JP039/S/OR/MC/GN/001
T/JPT/JP039/S/OR/MC/GN/002
T/JPT/JP039/S/OR/MC/GN/003
T/JPT/JP039/S/OR/MC/GN/004
T/JPT/JP039/S/OR/MC/GN/005

RESIDENTIAL
T/JPT/JP039/S//R/COL/SC/001
T/JPT/JP039/S/R/COL/SC/002
T/JPT/JP039/S/R/COL/SC/003
T/JPT/JP039/S/R/COL/SC/004
T/JPT/JP039/S/R/COL/SC/005
T/JPT/JP039/S/R/COL/SC/006
T/JPT/JP039/S/R/COL/SC/007
T/JPT/JP039/S/R/COL/SC/008
T/JPT/JP039/S/R/COL/SC/009
T/JPT/JP039/S/R/COL/SC/010
T/JPT/JP039/S/RA/LC/DT/001
T/JPT/JP039/S/RA/LC/DT/002
T/JPT/JP039/S/RA/LC/DT/003
T/JPT/JP039/S/RA/LC/DT/004
T/JPT/JP039/S/RA/LC/DT/005
T/JPT/JP039/S/RB/LC/DT/001
T/JPT/JP039/S/RB/LC/DT/002
T/JPT/JP039/S/RB/LC/DT/003
T/JPT/JP039/S/RB/LC/DT/004
T/JPT/JP039/S/RB/LC/DT/005
T/JPT/JP039/S/RB/LC/DT/006
T/JPT/JP039/S/RC/LC/DT/001
T/JPT/JP039/S/RC/LC/DT/002
T/JPT/JP039/S/RC/LC/DT/003
T/JPT/JP039/S/RC/LC/DT/004
T/JPT/JP039/S/RC/LC/DT/005
T/JPT/JP039/S/RA/WL/DT/001
T/JPT/JP039/S/RB/WL/DT/001
T/JPT/JP039/S/RC/WL/DT/001
T/JPT/JP039/S/R/SC/AS1/DT/001
T/JPT/JP039/S/R/SC/AS1/DT/002
T/JPT/JP039/S/R/SC/AS2/DT/001
T/JPT/JP039/S/R/SC/AS2/DT/002
T/JPT/JP039/S/R/SC/AS3/DT/001
T/JPT/JP039/S/R/SC/AS3/DT/002
T/JPT/JP039/S/R/SC/BS1/DT/001
T/JPT/JP039/S/R/SC/BS1/DT/002
T/JPT/JP039/S/R/SC/BS2/DT/001
T/JPT/JP039/S/R/SC/BS2DT/002
T/JPT/JP039/S/R/SC/BS3/DT/001
T/JPT/JP039/S/R/SC/CP/DT/001
T/JPT/JP039/S/R/SC/CS1/DT/001
T/JPT/JP039/S/R/SC/CS2/DT/001
T/JPT/JP039/S/R/SC/CS3/DT/001
T/JPT/JP039/S/R/SC/DP&LF/DT/001
T/JPT/JP039/S/R/SC/ES1/DT/001

Doc.Ref : JPT/DRC/DR

27

11

18

24

15

18

19

23

30

11

13

Month

DEC

JAN

FEB

MAR

MAR

MAR

APR

APR

APR

APR

MAY

JUNE

JUNE

JULY

AUG

Year

2013

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

Drawing Title

Revision No.

GENERAL NOTES (1)


GENERAL NOTES (2)
GENERAL NOTES (3)
GENERAL NOTES (4)
GENERAL NOTES (5)

A
A
A
A
A

B
-

B
A
A
A
A

COLUMN SCHEDULE (1)


COLUMN SCHEDULE (2)
COLUMN SCHEDULE (3)
COLUMN SCHEDULE (4)
COLUMN SCHEDULE (5)
COLUMN SCHEDULE (6)
COLUMN SCHEDULE (7)
COLUMN SCHEDULE (8)
COLUMN SCHEDULE (9)
COLUMN SCHEDULE (10)
TOWER A LIFTCORE DETAILS - 1
TOWER A LIFTCORE DETAILS - 2
TOWER A LIFTCORE DETAILS - 3
TOWER A LIFTCORE DETAILS - 4
TOWER A LIFTCORE DETAILS - 5
TOWER B LIFTCORE DETAILS - 1
TOWER B LIFTCORE DETAILS - 2
TOWER B LIFTCORE DETAILS - 3
TOWER B LIFTCORE DETAILS - 4
TOWER B LIFTCORE DETAILS - 5
TOWER B LIFTCORE DETAILS - 6
TOWER C LIFTCORE DETAILS - 1
TOWER C LIFTCORE DETAILS - 2
TOWER C LIFTCORE DETAILS - 3
TOWER C LIFTCORE DETAILS - 4
TOWER C LIFTCORE DETAILS - 5
TOWER A STAIRCASE WALL DETAILS (1)
TOWER B STAIRCASE WALL DETAILS (1)
TOWER C STAIRCASE WALL DETAILS (1)
STAIRCASE DETAILS - AS1 - 1
STAIRCASE DETAILS - AS1 - 2
STAIRCASE DETAILS - AS2 - 1
STAIRCASE DETAILS - AS2 - 2
STAIRCASE DETAILS - AS3 - 1
STAIRCASE DETAILS - AS3 - 2
STAIRCASE DETAILS - BS1 - 1
STAIRCASE DETAILS - BS1 - 2
STAIRCASE DETAILS - BS2 - 1
STAIRCASE DETAILS - BS2 - 2
STAIRCASE DETAILS - BS3 - 1
STAIRCASE DETAILS - CP1, CP2, CP3 - 1
STAIRCASE DETAILS - CS1 - 1
STAIRCASE DETAILS - CS2 - 1
STAIRCASE DETAILS - CS3 - 1
STAIRCASE DETAILS - DP&LF - 1
STAIRCASE DETAILS - ES1 - 1

A
A
A
-

A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
-

A
A
A
A
A
A
-

A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

B
B
B
B
B
B
B
B
A
B
B
B
B
B
B
B
B
B
A
B
B
B
B
B

C
B
C
B
B
C
B
C
B
A
B
B
B
A
A
C
B
B
B
A
A
B
B
B
A
A
A
A
A
B
A
B
A
B
B
B
A
B
A
B
A
C
C
C
B
B

C
C
D
-

Rev.No:0

Issue Date : 14 DECEMBER 2009

JURUTERA PERUNDING TEKAD MAJU SDN BHD


DRAWING REGISTER

BUILDING WORKS
Project No.

JP039 - (Tender)

Project Title

Taman Wahyu (ECOSKY)

Date

12/18/2014
Drawing No.

No

Date Issued
Date

27

11

18

24

15

18

19

23

30

11

13

Month

DEC

JAN

FEB

MAR

MAR

MAR

APR

APR

APR

APR

MAY

JUNE

JUNE

JULY

AUG

Year

2013

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

Drawing Title

Revision No.

52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76

T/JPT/JP039/S/R/SC/ES2/DT/001
T/JPT/JP039/S/R/SC/PS1&PS2/DT/001
T/JPT/JP039/S/R/SC/DP(ST)/DT/001
T/JPT/JP039/S/R/SC/FF(ST)/DT/001
T/JPT/JP039/S/R/SC/FF3(ST)/DT/001
T/JPT/JP039/S/R/SC/FF3(ST)/DT/002
T/JPT/JP039/S/RA/SW/DT/001
T/JPT/JP039/S/RA/SW/DT/002
T/JPT/JP039/S/RA/SW/DT/003
T/JPT/JP039/S/RB/SW/DT/001
T/JPT/JP039/S/RB/SW/DT/002
T/JPT/JP039/S/RB/SW/DT/003
T/JPT/JP039/S/RC/SW/DT/001
T/JPT/JP039/S/RC/SW/DT/002
T/JPT/JP039/S/RC/SW/DT/003
T/JPT/JP039/S/R/MR/LP&DT/001
T/JPT/JP039/S/R/RP1/LP&DT/001
T/JPT/JP039/S/R/RP2/LP&DT/001
T/JPT/JP039/S/R/RP3/LP&DT/001
T/JPT/JP039/S/R/RP3/LP&DT/002
T/JPT/JP039/S/R/RP4/LP&DT/001
T/JPT/JP039/S/R/RP4/LP&DT/002
T/JPT/JP039/S/R/RP4A/LP&DT/001
T/JPT/JP039/S/R/RP5/LP&DT/001
T/JPT/JP039/S/R/RP5/LP&DT/002

STAIRCASE DETAILS - ES2 - 1


STAIRCASE DETAILS - PS1&PS2 - 1
STEEL STAIRCASE DETAILS (TYPE DP)
STEEL STAIRCASE DETAILS (FF1, FF2 & FF4)
STEEL STAIRCASE DETAILS (FF3) - 1
STEEL STAIRCASE DETAILS (FF3) - 2
SHEAR WALL DETAILS - BLOCK A (1)
SHEAR WALL DETAILS - BLOCK A (2)
SHEAR WALL DETAILS - BLOCK A (3)
SHEAR WALL DETAILS - BLOCK B (1)
SHEAR WALL DETAILS - BLOCK B (2)
SHEAR WALL DETAILS - BLOCK B (3)
SHEAR WALL DETAILS - BLOCK C (1)
SHEAR WALL DETAILS - BLOCK C (2)
SHEAR WALL DETAILS - BLOCK C (3)
MOTORCYCLE RAMP LAYOUT PLAN & BEAM DETAILS
RAMP 1 LAYOUT PLAN & BEAM DETAILS
RAMP 2 LAYOUT PLAN & BEAM DETAILS
RAMP 3 LAYOUT PLAN & BEAM DETAILS
RAMP 3 LAYOUT PLAN & BEAM DETAILS - 2
RAMP 4 LAYOUT PLAN & BEAM DETAILS - 1
RAMP 4 LAYOUT PLAN & BEAM DETAILS - 2
RAMP 4A LAYOUT PLAN & BEAM DETAILS
RAMP 5 LAYOUT PLAN & BEAM DETAILS
RAMP 5 LAYOUT PLAN & BEAM DETAILS

A
A
A
A
A
-

A
A
A
-

A
A
A
A
-

B
B
-

A
A
-

B
B
B
B
B
C
C
B
B
B
B
A
B
A
B
B
A

A
A
A
A
-

C
A
A
C
C
A
D
D
A
-

B
B
A
A
A
A
C
A
A
C
C
A
D
D
A
A
B
B
B
A
B
A
B
B
A

D
D
D
E
-

77
78
79
80
81
82
83
84
85
86
87

Basement
T/JPT/JP039/S/R/BS/LP/001
T/JPT/JP039/S/R/BS/SP/001
T/JPT/JP039/S/R/BS/SP/002
T/JPT/JP039/S/R/BS/BM/001
T/JPT/JP039/S/R/BS/BM/002
T/JPT/JP039/S/R/BS/BM/003
T/JPT/JP039/S/R/BS/BM/004
T/JPT/JP039/S/R/BS/BM/005
T/JPT/JP039/S/R/BS/BM/006
T/JPT/JP039/S/R/BS/WT/001
T/JPT/JP039/S/R/BS/WT/002

BASEMENT LAYOUT PLAN


BASEMENT SLAB LAYOUT TOP REINFORCEMENT
BASEMENT SLAB LAYOUT BOTTOM REINFORCEMENT
BASEMENT BEAM DETAILS - 1
BASEMENT BEAM DETAILS - 2
BASEMENT BEAM DETAILS - 3
BASEMENT BEAM DETAILS - 4
BASEMENT BEAM DETAILS - 5
BASEMENT BEAM DETAILS - 6
BASEMENT WATER TANK DETAILS - 1
BASEMENT WATER TANK DETAILS - 2

A
A
A
A
A
A
A
A
A
A

B
B
B
B
B
B
B
B
B
B

C
C
C
C
C
C
C
C
A
-

D
D
C
D
C
D
D
C
A
C
B

88
89
90
91
92
93
94
95
96
97
98
99
100
101
102

Lower Ground
T/JPT/JP039/S/R/LG/LP/001
T/JPT/JP039/S/R/LG/SP/001
T/JPT/JP039/S/R/LG/SP/002
T/JPT/JP039/S/R/LG/BM/001
T/JPT/JP039/S/R/LG/BM/002
T/JPT/JP039/S/R/LG/BM/003
T/JPT/JP039/S/R/LG/BM/004
T/JPT/JP039/S/R/LG/BM/005
T/JPT/JP039/S/R/LG/BM/006
T/JPT/JP039/S/R/LG/BM/007
T/JPT/JP039/S/R/LG/BM/008
T/JPT/JP039/S/R/LG/BM/009
T/JPT/JP039/S/R/LG/BM/010
T/JPT/JP039/S/R/LG/BM/011
T/JPT/JP039/S/R/LG/BM/012

LG LAYOUT PLAN
LG SLAB LAYOUT TOP REINFORCEMENT
LG SLAB LAYOUT BOTTOM REINFORCEMENT
LG BEAM DETAILS - 1
LG BEAM DETAILS - 2
LG BEAM DETAILS - 3
LG BEAM DETAILS - 4
LG BEAM DETAILS - 5
LG BEAM DETAILS - 6
LG BEAM DETAILS - 7
LG BEAM DETAILS - 8
LG BEAM DETAILS - 9
LG BEAM DETAILS - 10
LG BEAM DETAILS - 11
LG BEAM DETAILS - 12

A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

B
B
B
B
B
B
B
B
B
B
B
B
B
B
B

C
-

D
C
B
B
B
C
C
D
C
D
C
C
C
C
C

E
D
C
D
-

Doc.Ref : JPT/DRC/DR

Rev.No:0

Issue Date : 14 DECEMBER 2009

JURUTERA PERUNDING TEKAD MAJU SDN BHD


DRAWING REGISTER

BUILDING WORKS
Project No.

JP039 - (Tender)

Project Title

Taman Wahyu (ECOSKY)

Date

12/18/2014
Drawing No.

No

Date Issued
Date

27

11

18

24

15

18

19

23

30

11

13

Month

DEC

JAN

FEB

MAR

MAR

MAR

APR

APR

APR

APR

MAY

JUNE

JUNE

JULY

AUG

Year

2013

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

Drawing Title

Revision No.

103
104
105
106

T/JPT/JP039/S/R/LG/BM/013
T/JPT/JP039/S/R/LG/BM/014
T/JPT/JP039/S/R/LG/BM/015
T/JPT/JP039/S/R/LG/BM/016

LG BEAM DETAILS - 13
LG BEAM DETAILS - 14
LG BEAM DETAILS - 15
LG BEAM DETAILS - 16

A
A
A
-

B
B
B
-

C
-

C
C
C
B

D
C

107
108
109
110
111
112
113
114
115
116

Lower Ground Floor TNB


T/JPT/JP039/S/R/LG(TNB)/LP/001
T/JPT/JP039/S/R/LG(TNB)/SP/001
T/JPT/JP039/S/R/LG(TNB)/SP/002
T/JPT/JP039/S/R/LG(TNB)/BM/001
T/JPT/JP039/S/R/LG(TNB)/BM/002
T/JPT/JP039/S/R/LG(TNB)/BM/003
T/JPT/JP039/S/R/LG(TNB)/BM/004
T/JPT/JP039/S/R/LG(TNB)/BM/005
T/JPT/JP039/S/R/LG(TNB)/BM/006
T/JPT/JP039/S/R/LG(TNB)/BM/007

LG TNB LAYOUT PLAN


LG TNB SLAB TOP REINFORCEMENT PLAN
LG TNB SLAB BOTTOM REINFORCEMENT PLAN
LG TNB BEAM DETAILS - 1
LG TNB BEAM DETAILS - 2
LG TNB BEAM DETAILS - 3
LG TNB BEAM DETAILS - 4
LG TNB BEAM DETAILS - 5
LG TNB BEAM DETAILS - 6
LG TNB BEAM DETAILS - 7

A
A
A
A
A
A
A
A
A
A

B
B
B
B
B
B
B
B
B
B

B
B
B
B
B
B
B
B
B
B

C
-

117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134

Ground Floor
T/JPT/JP039/S/R/GF/LP/001
T/JPT/JP039/S/R/GF/SP/001
T/JPT/JP039/S/R/GF/SP/002
T/JPT/JP039/S/R/GF/BM/001
T/JPT/JP039/S/R/GF/BM/002
T/JPT/JP039/S/R/GF/BM/003
T/JPT/JP039/S/R/GF/BM/004
T/JPT/JP039/S/R/GF/BM/005
T/JPT/JP039/S/R/GF/BM/006
T/JPT/JP039/S/R/GF/BM/007
T/JPT/JP039/S/R/GF/BM/008
T/JPT/JP039/S/R/GF/BM/009
T/JPT/JP039/S/R/GF/BM/010
T/JPT/JP039/S/R/GF/BM/011
T/JPT/JP039/S/R/GF/BM/012
T/JPT/JP039/S/R/GF/BM/013
T/JPT/JP039/S/R/GF/BM/014
T/JPT/JP039/S/R/GF/BM/015

GF LAYOUT PLAN
GF SLAB LAYOUT TOP REINFORCEMENT
GF SLAB LAYOUT BOTTOM REINFORCEMENT
GF BEAM DETAILS - 1
GF BEAM DETAILS - 2
GF BEAM DETAILS - 3
GF BEAM DETAILS - 4
GF BEAM DETAILS - 5
GF BEAM DETAILS - 6
GF BEAM DETAILS - 7
GF BEAM DETAILS - 8
GF BEAM DETAILS - 9
GF BEAM DETAILS - 10
GF BEAM DETAILS - 11
GF BEAM DETAILS - 12
GF BEAM DETAILS - 13
GF BEAM DETAILS - 14
GF BEAM DETAILS - 15

A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B

C
D
C
A
B
C
C
C
C
C
C
C
C
C
C
C
C
C

135
136
137
138

Ground Floor TNB


T/JPT/JP039/S/R/GF(TNB)/LP/001
T/JPT/JP039/S/R/GF(TNB)/BM/001
T/JPT/JP039/S/R/GF(TNB)/BM/002
T/JPT/JP039/S/R/GF(TNB)/BM/003

GF LAYOUT PLAN
GF TNB BEAM DETAILS - 1
GF TNB BEAM DETAILS - 2
GF TNB BEAM DETAILS - 3

A
A
A
A

B
B
B
-

C
-

B
C
B
B

139
140
141
142
143
144
145
146

1st Floor
T/JPT/JP039/S/R/1F/LP/001
T/JPT/JP039/S/R/1F/SP/001
T/JPT/JP039/S/R/1F/SP/002
T/JPT/JP039/S/R/1F/BM/001
T/JPT/JP039/S/R/1F/BM/002
T/JPT/JP039/S/R/1F/BM/003
T/JPT/JP039/S/R/1F/BM/004
T/JPT/JP039/S/R/1F/BM/005

1F FLOOR LAYOUT PLAN


1F SLAB LAYOUT TOP REINFORCEMENT
1F SLAB LAYOUT BOTTOM REINFORCEMENT
1F BEAM DETAILS - 1
1F BEAM DETAILS - 2
1F BEAM DETAILS - 3
1F BEAM DETAILS - 4
1F BEAM DETAILS - 5

A
A
A
A
A
A

A
A
-

B
B
B
B
B
B
B
B

C
C
C
C
-

D
D
C
C
C
C
C
C

Doc.Ref : JPT/DRC/DR

Rev.No:0

Issue Date : 14 DECEMBER 2009

JURUTERA PERUNDING TEKAD MAJU SDN BHD


DRAWING REGISTER

BUILDING WORKS
Project No.

JP039 - (Tender)

Project Title

Taman Wahyu (ECOSKY)

Date

12/18/2014

Date Issued
Date

Drawing No.

No

27

11

18

24

15

18

19

23

30

11

13

Month

DEC

JAN

FEB

MAR

MAR

MAR

APR

APR

APR

APR

MAY

JUNE

JUNE

JULY

AUG

Year

2013

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

Drawing Title

Revision No.

147
148
149
150

T/JPT/JP039/S/R/1F/BM/006
T/JPT/JP039/S/R/1F/BM/007
T/JPT/JP039/S/R/1F/BM/008
T/JPT/JP039/S/R/1F/BM/009

1F BEAM DETAILS - 6
1F BEAM DETAILS - 7
1F BEAM DETAILS - 8
1F BEAM DETAILS - 9

A
A
A
A

B
B
B
-

C
C
C
C

151
152
153
154
155
156
157

2nd Floor
T/JPT/JP039/S/R/2F/LP/001
T/JPT/JP039/S/R/2F/SP/001
T/JPT/JP039/S/R/2F/SP/002
T/JPT/JP039/S/R/2F/BM/001
T/JPT/JP039/S/R/2F/BM/002
T/JPT/JP039/S/R/2F/BM/003
T/JPT/JP039/S/R/2F/BM/004

2ND FLOOR LAYOUT PLAN


2F SLAB LAYOUT TOP REINFORCEMENT
2F SLAB LAYOUT BOTTOM REINFORCEMENT
2F BEAM DETAILS - 1
2F BEAM DETAILS - 2
2F BEAM DETAILS - 3
2F BEAM DETAILS - 4

A
A
A
A
A
A
A

B
B
B
B
B
B
B

C
C
C
-

D
D
C
B
B
B
B

158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187

3F -5F Floor
T/JPT/JP039/S/R/TYP/LP/001
T/JPT/JP039/S/R/TYP/SP/001
T/JPT/JP039/S/R/TYP/SP/002
T/JPT/JP039/S/R/TYP/BM/001
T/JPT/JP039/S/R/TYP/BM/002
T/JPT/JP039/S/R/TYP/BM/003
T/JPT/JP039/S/R/TYP/BM/004
T/JPT/JP039/S/R/TYP/BM/005
T/JPT/JP039/S/R/TYP/BM/006
T/JPT/JP039/S/R/TYP/BM/007
T/JPT/JP039/S/R/TYP/BM/008
T/JPT/JP039/S/R/TYP/BM/009
T/JPT/JP039/S/R/TYP/BM/010
T/JPT/JP039/S/R/TYP/BM/011
T/JPT/JP039/S/R/TYP/BM/012
T/JPT/JP039/S/R/TYP/BM/013
T/JPT/JP039/S/R/TYP/BM/014
T/JPT/JP039/S/R/TYP/BM/015
T/JPT/JP039/S/R/TYP/BM/016
T/JPT/JP039/S/R/TYP/BM/017
T/JPT/JP039/S/R/TYP/BM/018
T/JPT/JP039/S/R/TYP/BM/019
T/JPT/JP039/S/R/TYP/BM/020
T/JPT/JP039/S/R/TYP/BM/021
T/JPT/JP039/S/R/TYP/BM/022
T/JPT/JP039/S/R/TYP/BM/023
T/JPT/JP039/S/R/TYP/BM/024
T/JPT/JP039/S/R/TYP/BM/025
T/JPT/JP039/S/R/TYP/BM/026
T/JPT/JP039/S/R/TYP/BM/027

TYPICAL FLOOR LAYOUT PLAN


TYPICAL FLOOR SLAB LAYOUT TOP REINFORCEMENT
TYPICAL FLOOR SLAB LAYOUT BOTTOM REINFORCEMENT
TYPICAL FLOOR BEAM DETAILS - 1
TYPICAL FLOOR BEAM DETAILS - 2
TYPICAL FLOOR BEAM DETAILS - 3
TYPICAL FLOOR BEAM DETAILS - 4
TYPICAL FLOOR BEAM DETAILS - 5
TYPICAL FLOOR BEAM DETAILS - 6
TYPICAL FLOOR BEAM DETAILS - 7
TYPICAL FLOOR BEAM DETAILS - 8
TYPICAL FLOOR BEAM DETAILS - 9
TYPICAL FLOOR BEAM DETAILS - 10
TYPICAL FLOOR BEAM DETAILS - 11
TYPICAL FLOOR BEAM DETAILS - 12
TYPICAL FLOOR BEAM DETAILS - 13
TYPICAL FLOOR BEAM DETAILS - 14
TYPICAL FLOOR BEAM DETAILS - 15
TYPICAL FLOOR BEAM DETAILS - 16
TYPICAL FLOOR BEAM DETAILS - 17
TYPICAL FLOOR BEAM DETAILS - 18
TYPICAL FLOOR BEAM DETAILS - 19
TYPICAL FLOOR BEAM DETAILS - 20
TYPICAL FLOOR BEAM DETAILS - 21
TYPICAL FLOOR BEAM DETAILS - 22
TYPICAL FLOOR BEAM DETAILS - 23
TYPICAL FLOOR BEAM DETAILS - 24
TYPICAL FLOOR BEAM DETAILS - 25
TYPICAL FLOOR BEAM DETAILS - 26
TYPICAL FLOOR BEAM DETAILS - 27

A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B

C
C
C
-

D
D
C
C
C
C
C
C
C
C
C
C
B
B
B
B
B
B
C
B
C
B
C
C
C
B
C
B
B
B

188
189
190
189

6th Floor
T/JPT/JP039/S/R/6F/LP/001
T/JPT/JP039/S/R/6F/SP/001
T/JPT/JP039/S/R/6F/SP/002
T/JPT/JP039/S/R/6F/BM/001

6TH FLOOR LAYOUT PLAN


6F SLAB LAYOUT TOP REINFORCEMENT
6F SLAB LAYOUT BOTTOM REINFORCEMENT
6F BEAM DETAILS - 1

A
A
A
A

B
B
B
B

C
C
C
-

D
D
C
B

190

6th Floor Mezzanine


T/JPT/JP039/S/R/6F/MZ/LP/001

6F MEZZ FLOOR LAYOUT PLAN

Doc.Ref : JPT/DRC/DR

Rev.No:0

Issue Date : 14 DECEMBER 2009

JURUTERA PERUNDING TEKAD MAJU SDN BHD


DRAWING REGISTER

BUILDING WORKS
Project No.

JP039 - (Tender)

Project Title

Taman Wahyu (ECOSKY)

Date

12/18/2014
Drawing No.

No

Date Issued
Date

27

11

18

24

15

18

19

23

30

11

13

Month

DEC

JAN

FEB

MAR

MAR

MAR

APR

APR

APR

APR

MAY

JUNE

JUNE

JULY

AUG

Year

2013

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

Drawing Title

Revision No.

191
192
193
194
195
196
197

T/JPT/JP039/S/R/6F/MZ/SP/001
T/JPT/JP039/S/R/6F/MZ/SP/002
T/JPT/JP039/S/R/6F/MZ/BM/001
T/JPT/JP039/S/R/6F/MZ/BM/002
T/JPT/JP039/S/R/6F/MZ/BM/003
T/JPT/JP039/S/R/6F/MZ/BM/004
T/JPT/JP039/S/R/6F/MZ/BM/005

6F MEZZ SLAB LAYOUT TOP REINFORCEMENT


6F MEZZ SLAB LAYOUT BOTTOM REINFORCEMENT
6F MEZZ BEAM DETAILS - 1
6F MEZZ BEAM DETAILS - 2
6F MEZZ BEAM DETAILS - 3
6F MEZZ BEAM DETAILS - 4
6F MEZZ BEAM DETAILS - 5

A
A
A
A
A
A
A

B
B
B
B
B
B
B

C
C
-

D
D
C
C
C
C
C

198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235

7th Floor
T/JPT/JP039/S/R/7F/LP/001
T/JPT/JP039/S/R/7F/SP/001
T/JPT/JP039/S/R/7F/SP/002
T/JPT/JP039/S/R/7F/BM/001
T/JPT/JP039/S/R/7F/BM/002
T/JPT/JP039/S/R/7F/BM/003
T/JPT/JP039/S/R/7F/BM/004
T/JPT/JP039/S/R/7F/BM/005
T/JPT/JP039/S/R/7F/BM/006
T/JPT/JP039/S/R/7F/BM/007
T/JPT/JP039/S/R/7F/BM/008
T/JPT/JP039/S/R/7F/BM/009
T/JPT/JP039/S/R/7F/BM/010
T/JPT/JP039/S/R/7F/BM/011
T/JPT/JP039/S/R/7F/BM/012
T/JPT/JP039/S/R/7F/BM/013
T/JPT/JP039/S/R/7F/BM/014
T/JPT/JP039/S/R/7F/BM/015
T/JPT/JP039/S/R/7F/BM/016
T/JPT/JP039/S/R/7F/BM/017
T/JPT/JP039/S/R/7F/BM/018
T/JPT/JP039/S/R/7F/BM/019
T/JPT/JP039/S/R/7F/BM/020
T/JPT/JP039/S/R/7F/BM/021
T/JPT/JP039/S/R/7F/BM/022
T/JPT/JP039/S/R/7F/BM/023
T/JPT/JP039/S/R/7F/BM/024
T/JPT/JP039/S/R/7F/BM/025
T/JPT/JP039/S/R/7F/BM/026
T/JPT/JP039/S/R/7F/BM/027
T/JPT/JP039/S/R/7F/BM/028
T/JPT/JP039/S/R/7F/BM/029
T/JPT/JP039/S/R/7F/BM/030
T/JPT/JP039/S/R/7F/BM/031
T/JPT/JP039/S/R/7F/BM/032
T/JPT/JP039/S/R/7F/BM/033
T/JPT/JP039/S/R/7F/BM/034
T/JPT/JP039/S/R/7F/SS/001

7TH FLOOR LAYOUT PLAN


7F SLAB LAYOUT TOP REINFORCEMENT
7F SLAB LAYOUT BOTTOM REINFORCEMENT
7F BEAM DETAILS - 1
7F BEAM DETAILS - 2
7F BEAM DETAILS - 3
7F BEAM DETAILS - 4
7F BEAM DETAILS - 5
7F BEAM DETAILS - 6
7F BEAM DETAILS - 7
7F BEAM DETAILS - 8
7F BEAM DETAILS - 9
7F BEAM DETAILS - 10
7F BEAM DETAILS - 11
7F BEAM DETAILS - 12
7F BEAM DETAILS - 13
7F BEAM DETAILS - 14
7F BEAM DETAILS - 15
7F BEAM DETAILS - 16
7F BEAM DETAILS - 17
7F BEAM DETAILS - 18
7F BEAM DETAILS - 19
7F BEAM DETAILS - 20
7F BEAM DETAILS - 21
7F BEAM DETAILS - 22
7F BEAM DETAILS - 23
7F BEAM DETAILS - 24
7F BEAM DETAILS - 25
7F BEAM DETAILS - 26
7F BEAM DETAILS - 27
7F BEAM DETAILS - 28
7F BEAM DETAILS - 29
7F BEAM DETAILS - 30
7F BEAM DETAILS - 31
7F BEAM DETAILS - 32
7F BEAM DETAILS - 33
7F BEAM DETAILS - 34
7F SLAB CUT SECTION

A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
-

B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
-

C
C
C
C
C
C
C
C
C
C
C
-

D
D
C
B
C
C
C
C
C
D
C
C
C
B
B
D
A
C
A
C
C
B
B
B
D
D
C
B
C
C
B
C
B
C
D
C
C
A

E
D
D
D
E
D
D
D
E
D
C
C
D
-

236
237
238
239
240
241

7th Floor Mezzanine


T/JPT/JP039/S/R/7FMZ/LP/001
T/JPT/JP039/S/R/7FMZ/SP/001
T/JPT/JP039/S/R/7FMZ/SP/002
T/JPT/JP039/S/R/7FMZ/BM/001
T/JPT/JP039/S/R/7FMZ/BM/002
T/JPT/JP039/S/R/7FMZ/BM/003

7TH MEZZ FLOOR LAYOUT PLAN


7F MEZZ SLAB LAYOUT TOP REINFORCEMENT
7F MEZZ SLAB LAYOUT BOTTOM REINFORCEMENT
7F MEZZ BEAM DETAILS - 1
7F MEZZ BEAM DETAILS - 2
7F MEZZ BEAM DETAILS - 3

A
A
A
A
A
A

B
B
B
B
B
B

C
C
C
C

D
C
C
D
D

E
C
C
D
E
E

F
E
D
E
-

Doc.Ref : JPT/DRC/DR

Rev.No:0

Issue Date : 14 DECEMBER 2009

JURUTERA PERUNDING TEKAD MAJU SDN BHD


DRAWING REGISTER

BUILDING WORKS
Project No.

JP039 - (Tender)

Project Title

Taman Wahyu (ECOSKY)

Date

12/18/2014

No

Drawing No.

242
243
244
245
246

T/JPT/JP039/S/R/7FMZ/BM/004
T/JPT/JP039/S/R/7FMZ/BM/005
T/JPT/JP039/S/R/7FMZ/BM/006
T/JPT/JP039/S/R/7FMZ/BM/007
T/JPT/JP039/S/R/CPY(ST)LP&DT/001

Date Issued
Date

27

11

18

24

15

18

19

23

30

11

13

Month

DEC

JAN

FEB

MAR

MAR

MAR

APR

APR

APR

APR

MAY

JUNE

JUNE

JULY

AUG

Year

2013

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

7F MEZZ BEAM DETAILS - 4


7F MEZZ BEAM DETAILS - 5
7F MEZZ BEAM DETAILS - 6
7F MEZZ BEAM DETAILS - 7
TOILET CANOPY SECTION & DETAIL

A
A
A
A
-

B
B
B
B
-

C
C
C
C
-

D
D
-

D
D
E
E
-

E
E
A

TRANSFER FLOOR LAYOUT PLAN


TRANSFER FLOOR SLAB REINFORCEMENT PLAN
TRF BEAM DETAILS - 1
TRF BEAM DETAILS - 2
TRF BEAM DETAILS - 3
TRF BEAM DETAILS - 4
TRF BEAM DETAILS - 5
TRF BEAM DETAILS - 6
TRF BEAM DETAILS - 7
TRF BEAM DETAILS - 8

A
A
A
A
A
A
A
A
A

B
A
-

C
B
A
A
A
A
A
A
A
A

D
C
-

Drawing Title

Revision No.

TOWER A

247
248
249
250
251
252
253
254
255
256

TRANSFER FLOOR
T/JPT/JP039/S/RA/TRF/LP/001
T/JPT/JP039/S/RA/TRF/SP/001
T/JPT/JP039/S/RA/TRF/BM/001
T/JPT/JP039/S/RA/TRF/BM/002
T/JPT/JP039/S/RA/TRF/BM/003
T/JPT/JP039/S/RA/TRF/BM/004
T/JPT/JP039/S/RA/TRF/BM/005
T/JPT/JP039/S/RA/TRF/BM/006
T/JPT/JP039/S/RA/TRF/BM/007
T/JPT/JP039/S/RA/TRF/BM/008

257
258
259
260
261

8th~22th & 26th~38th Floor


T/JPT/JP039/S/RA/TYP/LP/001
T/JPT/JP039/S/RA/TYP/SP/001
T/JPT/JP039/S/RA/TYP/SP/002
T/JPT/JP039/S/RA/TYP/BM/001
T/JPT/JP039/S/RA/TYP/BM/002

TYPICAL FLOOR LAYOUT PLAN


TYPICAL FLOOR LAYOUT BOTTOM REINFORCEMENT
TYPICAL FLOOR LAYOUT TOP REINFORCEMENT
TYPICAL CONDO BEAM DETAILS - 1
TYPICAL CONDO BEAM DETAILS - 2

A
A
A
A
A

C
B
B
C
C

D
C
C
-

E
D
D
D
D

F
E
E
E
E

262
263
264
265
266

23rd Floor
T/JPT/JP039/S/RA/23F/LP/001
T/JPT/JP039/S/RA/23F/SP/001
T/JPT/JP039/S/RA/23F/SP/002
T/JPT/JP039/S/RA/23F/BM/001
T/JPT/JP039/S/RA/23F/BM/002

23F FLOOR LAYOUT PLAN


23F FLOOR LAYOUT TOP REINFORCEMENT
23F FLOOR LAYOUT BOTTOM REINFORCEMENT
23F FLOOR CONDO BEAM DETAILS - 1
23F FLOOR CONDO BEAM DETAILS - 2

A
A
A
A
A

B
B
B
B
-

C
C
C
-

D
D
D
-

E
E
E
C
B

F
F
F
D
C

267
268
269
270

24th Floor
T/JPT/JP039/S/RA/24F/LP/001
T/JPT/JP039/S/RA/24F/SP/001
T/JPT/JP039/S/RA/24F/SP/002
T/JPT/JP039/S/RA/24F/BM/001

24F FLOOR LAYOUT PLAN


24F FLOOR LAYOUT BOTTOM REINFORCEMENT
24F FLOOR LAYOUT TOP REINFORCEMENT
24F FLOOR CONDO BEAM DETAILS - 1

A
A
A
-

B
B
B
A

C
C
C

D
D
D
A

E
E
E
-

271
272
273

25th Floor
T/JPT/JP039/S/RA/25F/LP/001
T/JPT/JP039/S/RA/25F/SP/001
T/JPT/JP039/S/RA/25F/SP/002

25TH FLOOR LAYOUT PLAN


25F FLOOR LAYOUT BOTTOM REINFORCEMENT
25F FLOOR LAYOUT TOP REINFORCEMENT

A
A
A

B
B
B

C
C
C

D
D
D

E
E
E

274

26th Floor
T/JPT/JP039/S/RA/26F/LP/001

26TH FLOOR LAYOUT PLAN

275
276
277
278
279

39th Floor
T/JPT/JP039/S/RA/39F/LP/001
T/JPT/JP039/S/RA/39F/SP/001
T/JPT/JP039/S/RA/39F/SP/002
T/JPT/JP039/S/RA/39F/BM/001
T/JPT/JP039/S/RA/39F/BM/002

39F FLOOR LAYOUT PLAN


39F FLOOR LAYOUT BOTTOM REINFORCEMENT
39F FLOOR LAYOUT TOP REINFORCEMENT
39F FLOOR CONDO BEAM DETAILS - 1
39F FLOOR CONDO BEAM DETAILS - 2

A
A
A
A
A

B
B
-

C
B
B
C
B

D
C
C
C

Doc.Ref : JPT/DRC/DR

Rev.No:0

Issue Date : 14 DECEMBER 2009

JURUTERA PERUNDING TEKAD MAJU SDN BHD


DRAWING REGISTER

BUILDING WORKS
Project No.

JP039 - (Tender)

Project Title

Taman Wahyu (ECOSKY)

Date

12/18/2014
Drawing No.

No

Date Issued
Date

27

11

18

24

15

18

19

23

30

11

13

Month

DEC

JAN

FEB

MAR

MAR

MAR

APR

APR

APR

APR

MAY

JUNE

JUNE

JULY

AUG

Year

2013

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

Drawing Title

Revision No.

280

T/JPT/JP039/S/RA/39F/BM/003

39F FLOOR CONDO BEAM DETAILS - 3

281
282
283
284
285

Tower Lower Roof


T/JPT/JP039/S/RA/RF/LP/001
T/JPT/JP039/S/RA/RF/SP/001
T/JPT/JP039/S/RA/RF/SP/002
T/JPT/JP039/S/RA/RF/BM/001
T/JPT/JP039/S/RA/RF/BM/002

LOWER ROOF LAYOUT PLAN


LOWER ROOF TOP REINFORCEMENT PLAN
LOWER ROOF BOTTOM REINFORCEMENT PLAN
LOWER ROOF BEAM DETAILS - 1
LOWER ROOF BEAM DETAILS - 2

A
A
A
A
A

B
B
B
B
B

C
C
-

D
D
C
-

E
E
D
-

286
287

Tower Upper Roof


T/JPT/JP039/S/RA/RF/LP/001
T/JPT/JP039/S/RA/URF/BM/001

UPPER ROOF LAYOUT


UPPER ROOF BEAM DETAILS - 1

A
A

B
B

C
C

D
D

288
289
290
291

Tower A Roof Crown


T/JPT/JP039/S/RA/RFC/LP/001
T/JPT/JP039/S/RA/RFC/DT/001
T/JPT/JP039/S/RA/RF(ST)/LP/001
T/JPT/JP039/S/RA/SL/LP/001

ROOF CROWN LAYOUT PLAN


ROOF CROWN ELEVATION & SECTION
LOWER ROOF METAL DECK PLAN
SKY LOUNGE LAYOUT

A
A
-

A
A
A
A

C
B
B

TRANSFER FLOOR LAYOUT PLAN


TRANSFER FLOOR SLAB REINFORCEMENT PLAN
TRF BEAM DETAILS - 1
TRF BEAM DETAILS - 2
TRF BEAM DETAILS - 3
TRF BEAM DETAILS - 4
TRF BEAM DETAILS - 5
TRF BEAM DETAILS - 6
TRF BEAM DETAILS - 7
TRF BEAM DETAILS - 8
TRF BEAM DETAILS - 9

A
A
A
A
A
A
A
A
A
-

A
-

B
B
B
B
B
B
B
B
B
A

C
B
C
B

D
C
C
C
B
B
C
B
C
B
B

E
D
-

TOWER B

292
293
294
295
296
297
298
299
300
301
302

TRANSFER FLOOR
T/JPT/JP039/S/RB/TRF/LP/001
T/JPT/JP039/S/RB/TRF/SP/001
T/JPT/JP039/S/RB/TRF/BM/001
T/JPT/JP039/S/RB/TRF/BM/002
T/JPT/JP039/S/RB/TRF/BM/003
T/JPT/JP039/S/RB/TRF/BM/004
T/JPT/JP039/S/RB/TRF/BM/005
T/JPT/JP039/S/RB/TRF/BM/006
T/JPT/JP039/S/RB/TRF/BM/007
T/JPT/JP039/S/RB/TRF/BM/008
T/JPT/JP039/S/RB/TRF/BM/009

303
304
305
306
307
308

8th~22th & 26th~38th Floor


T/JPT/JP039/S/RB/TYP/LP/001
T/JPT/JP039/S/RB/TYP/SP/001
T/JPT/JP039/S/RB/TYP/SP/002
T/JPT/JP039/S/RB/TYP/BM/001
T/JPT/JP039/S/RB/TYP/BM/002
T/JPT/JP039/S/RB/TYP/BM/003

TYPICAL FLOOR LAYOUT PLAN


TYPICAL FLOOR LAYOUT BOTTOM REINFORCEMENT
TYPICAL FLOOR LAYOUT TOP REINFORCEMENT
TYPICAL CONDO BEAM DETAILS - 1
TYPICAL CONDO BEAM DETAILS - 2
TYPICAL CONDO BEAM DETAILS - 3

A
A
A
A
A
A

B
B
B
-

C
B
B
-

D
C
B
C
C
B

E
D
C
D
D
-

309
310
311
312
313
314

23rd Floor
T/JPT/JP039/S/RB/23F/LP/001
T/JPT/JP039/S/RB/23F/SP/001
T/JPT/JP039/S/RB/23F/SP/002
T/JPT/JP039/S/RB/23F/BM/001
T/JPT/JP039/S/RB/23F/BM/002
T/JPT/JP039/S/RB/23F/BM/003

23F LAYOUT PLAN


23F LAYOUT TOP REINFORCEMENT
23F LAYOUT BOTTOM REINFORCEMENT
23F BEAM DETAILS - 1
23F BEAM DETAILS - 2
23F BEAM DETAILS - 3

A
A
A
A
A
A

B
B
B
B

C
B
B
-

D
C
C
C
C
C

E
D
D
D

315
316
317

24th Floor
T/JPT/JP039/S/RB/24F/LP/001
T/JPT/JP039/S/RB/24F/SP/001
T/JPT/JP039/S/RB/24F/SP/002

24TH FLOOR LAYOUT PLAN


24F FLOOR LAYOUT BOTTOM REINFORCEMENT
24F FLOOR LAYOUT TOP REINFORCEMENT

A
A
A

B
B
B

C
C
C

D
D
C

E
E
D

Doc.Ref : JPT/DRC/DR

Rev.No:0

Issue Date : 14 DECEMBER 2009

JURUTERA PERUNDING TEKAD MAJU SDN BHD


DRAWING REGISTER

BUILDING WORKS
Project No.

JP039 - (Tender)

Project Title

Taman Wahyu (ECOSKY)

Date

12/18/2014
Drawing No.

No

Date Issued
Date

27

11

18

24

15

18

19

23

30

11

13

Month

DEC

JAN

FEB

MAR

MAR

MAR

APR

APR

APR

APR

MAY

JUNE

JUNE

JULY

AUG

Year

2013

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

Drawing Title

Revision No.

318

T/JPT/JP039/S/RB/24F/BM/001

24F BEAM DETAILS - 1

319
320
321
322

25th Floor
T/JPT/JP039/S/RB/25F/LP/001
T/JPT/JP039/S/RB/25F/SP/001
T/JPT/JP039/S/RB/25F/SP/002
T/JPT/JP039/S/RB/25F/BM/001

25TH FLOOR LAYOUT PLAN


25F FLOOR LAYOUT BOTTOM REINFORCEMENT
25F FLOOR LAYOUT TOP REINFORCEMENT
25F BEAM DETAILS - 1

A
A
A
-

B
-

C
B
B
-

D
C
B
A

E
D
C
B

323

26th Floor
T/JPT/JP039/S/RB/26F/LP/001

26TH FLOOR LAYOUT PLAN

324
325
326
327
328
329
330
331
332
333
334

39th Floor
T/JPT/JP039/S/RB/39F/LP/001
T/JPT/JP039/S/RB/39F/SP/001
T/JPT/JP039/S/RB/39F/SP/002
T/JPT/JP039/S/RB/39F/BM/001
T/JPT/JP039/S/RB/39F/BM/002
T/JPT/JP039/S/RB/39F/BM/003
T/JPT/JP039/S/RB/39F/BM/004
T/JPT/JP039/S/RB/39F/BM/005
T/JPT/JP039/S/RB/39F/BM/006
T/JPT/JP039/S/RB/39F/BM/007
T/JPT/JP039/S/RB/39F/BM/008

39F FLOOR LAYOUT PLAN


39F FLOOR LAYOUT BOTTOM REINFORCEMENT
39F FLOOR LAYOUT TOP REINFORCEMENT
39F FLOOR CONDO BEAM DETAILS - 1
39F FLOOR CONDO BEAM DETAILS - 2
39F FLOOR CONDO BEAM DETAILS - 3
39F FLOOR CONDO BEAM DETAILS - 4
39F FLOOR CONDO BEAM DETAILS - 5
39F FLOOR CONDO BEAM DETAILS - 6
39F FLOOR CONDO BEAM DETAILS - 7
39F FLOOR CONDO BEAM DETAILS - 8

A
A
A
A
A
A
A
A
A
A
A

B
B
B
B
B
B
B
B
B
B
B

D
C
C
C
C
D
D
C
C
C
D

E
D
D
D
E
E
D
D
D
E

335
336
337
338
339

Tower Lower Roof


T/JPT/JP039/S/RB/RF/LP/001
T/JPT/JP039/S/RB/RF/SP/001
T/JPT/JP039/S/RB/RF/SP/002
T/JPT/JP039/S/RB/RF/BM/001
T/JPT/JP039/S/RB/RF/BM/002

LOWER ROOF LAYOUT PLAN


LOWER ROOF TOP REINFORCEMENT PLAN
LOWER ROOF BOTTOM REINFORCEMENT PLAN
LOWER ROOF BEAM DETAILS - 1
LOWER ROOF BEAM DETAILS - 2

A
A
A
A
A

B
-

B
B
B
B

D
C
C
B
B

E
D
D
-

340
341

Tower Upper Roof


T/JPT/JP039/S/RB/RF/LP/001
T/JPT/JP039/S/RB/URF/BM/001

UPPER ROOF LAYOUT


UPPER ROOF BEAM DETAILS - 1

A
A

B
B

C
C

D
D

342
343
344
345

Tower B Roof Crown


T/JPT/JP039/S/RB/RFC/LP/001
T/JPT/JP039/S/RB/RFC/DT/001
T/JPT/JP039/S/RB/RF(ST)/LP/001
T/JPT/JP039/S/RB/SL/LP/001

ROOF CROWN LAYOUT PLAN


ROOF CROWN ELEVATION & SECTION
LOWER ROOF METAL DECK PLAN
SKY LOUNGE LAYOUT

A
A
-

A
B
A
A

B
C
B
B

TRANSFER FLOOR LAYOUT PLAN


TRANSFER FLOOR SLAB REINFORCEMENT PLAN
TRF BEAM DETAILS - 1
TRF BEAM DETAILS - 2
TRF BEAM DETAILS - 3
TRF BEAM DETAILS - 4
TRF BEAM DETAILS - 5
TRF BEAM DETAILS - 6
TRF BEAM DETAILS - 7
TRF BEAM DETAILS - 8
TRF BEAM DETAILS - 9

A
A
A
A
A
A
A
A
A
A

B
A
-

C
B
A
A
A
A
A
A
A
A
A

D
C
B
B
B
B
B

TOWER C

346
347
347
348
348
349
349
350
350
351
351

TRANSFER FLOOR
T/JPT/JP039/S/RC/TRF/LP/001
T/JPT/JP039/S/RC/TRF/SP/001
T/JPT/JP039/S/RC/TRF/BM/001
T/JPT/JP039/S/RC/TRF/BM/002
T/JPT/JP039/S/RC/TRF/BM/003
T/JPT/JP039/S/RC/TRF/BM/004
T/JPT/JP039/S/RC/TRF/BM/005
T/JPT/JP039/S/RC/TRF/BM/006
T/JPT/JP039/S/RC/TRF/BM/007
T/JPT/JP039/S/RC/TRF/BM/008
T/JPT/JP039/S/RC/TRF/BM/009

Doc.Ref : JPT/DRC/DR

Rev.No:0

Issue Date : 14 DECEMBER 2009

JURUTERA PERUNDING TEKAD MAJU SDN BHD


DRAWING REGISTER

BUILDING WORKS
Project No.

JP039 - (Tender)

Project Title

Taman Wahyu (ECOSKY)

Date

12/18/2014
Drawing No.

No

Date Issued
Date

27

11

18

24

15

18

19

23

30

11

13

Month

DEC

JAN

FEB

MAR

MAR

MAR

APR

APR

APR

APR

MAY

JUNE

JUNE

JULY

AUG

Year

2013

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

Drawing Title

Revision No.

352

T/JPT/JP039/S/RC/TRF/BM/010

TRF BEAM DETAILS - 10

353
354
355
356
357
358

8th~23th & 27th~40th Floor


T/JPT/JP039/S/RC/TYP/LP/001
T/JPT/JP039/S/RC/TYP/SP/001
T/JPT/JP039/S/RC/TYP/SP/002
T/JPT/JP039/S/RC/TYP/BM/001
T/JPT/JP039/S/RC/TYP/BM/002
T/JPT/JP039/S/RC/TYP/BM/003

TYPICAL FLOOR LAYOUT PLAN


TYPICAL FLOOR LAYOUT BOTTOM REINFORCEMENT
TYPICAL FLOOR LAYOUT TOP REINFORCEMENT
TYPICAL CONDO BEAM DETAILS - 1
TYPICAL CONDO BEAM DETAILS - 2
TYPICAL CONDO BEAM DETAILS - 3

A
A
A
A
A
A

D
B
B
C
C
C

E
C
C
D
D
D

F
D
D
E
E
E

359
360
361
362
363

24rd Floor
T/JPT/JP039/S/RC/24F/LP/001
T/JPT/JP039/S/RC/24F/SP/001
T/JPT/JP039/S/RC/24F/SP/002
T/JPT/JP039/S/RC/24F/BM/001
T/JPT/JP039/S/RC/24F/BM/002

24F FLOOR LAYOUT PLAN


24F FLOOR LAYOUT TOP REINFORCEMENT
24F FLOOR LAYOUT BOTTOM REINFORCEMENT
24F BEAM DETAILS - 1
24F BEAM DETAILS - 2

A
A
A
A
A

B
B
B
B
B

C
C
C
C
C

D
D
D
D
D

364
365
366

25th Floor
T/JPT/JP039/S/RC/25F/LP/001
T/JPT/JP039/S/RC/25F/SP/001
T/JPT/JP039/S/RC/25F/SP/002

25F FLOOR LAYOUT PLAN


25F FLOOR LAYOUT BOTTOM REINFORCEMENT
25F FLOOR LAYOUT TOP REINFORCEMENT

A
A
A

B
B
B

C
C
C

D
D
D

367
368
369

26th Floor
T/JPT/JP039/S/RC/26F/LP/001
T/JPT/JP039/S/RC/26F/SP/001
T/JPT/JP039/S/RC/26F/SP/002

26F FLOOR LAYOUT PLAN


26F FLOOR LAYOUT BOTTOM REINFORCEMENT
26F FLOOR LAYOUT TOP REINFORCEMENT

A
A
A

B
B
B

C
C
C

D
D
D

370

27th Floor
T/JPT/JP039/S/RC/27F/LP/001

27TH FLOOR LAYOUT PLAN

371
372
373
374
375
376
377
378

41st Floor
T/JPT/JP039/S/RC/41F/LP/001
T/JPT/JP039/S/RC/41F/SP/001
T/JPT/JP039/S/RC/41F/SP/002
T/JPT/JP039/S/RC/41F/BM/001
T/JPT/JP039/S/RC/41F/BM/002
T/JPT/JP039/S/RC/41F/BM/003
T/JPT/JP039/S/RC/41F/BM/004
T/JPT/JP039/S/RC/41F/BM/005

41F FLOOR LAYOUT PLAN


41F FLOOR LAYOUT TOP REINFORCEMENT
41F FLOOR LAYOUT BOTTOM REINFORCEMENT
41F FLOOR BEAM DETAILS - 1
41F FLOOR BEAM DETAILS - 2
41F FLOOR BEAM DETAILS - 3
41F FLOOR BEAM DETAILS - 4
41F FLOOR BEAM DETAILS - 5

A
A
A
A
A
A
A
A

B
-

C
B
B
B
B
B
B
B

D
C
C
-

379
380
381
382

Tower Lower Roof


T/JPT/JP039/S/RC/RF/LP/001
T/JPT/JP039/S/RC/RF/SP/001
T/JPT/JP039/S/RC/RF/BM/001
T/JPT/JP039/S/RC/RF/BM/002

ROOF LAYOUT PLAN


LOWER ROOF SALB REINFORCEMENT LAYOUT
LOWER ROOF BEAM DETAILS - 1
LOWER ROOF BEAM DETAILS - 2

A
A
A
A

B
B
-

D
C
B
B

E
D
C
C

383
384

Tower Upper Roof


T/JPT/JP039/S/RC/RF/LP/001
T/JPT/JP039/S/RC/URF/BM/001

UPPER ROOF LAYOUT


UPPER ROOF BEAM DETAILS - 1

A
A

B
B

C
C

D
D

385
386
387

Tower C Roof Crown


T/JPT/JP039/S/RC/RFC/LP/001
T/JPT/JP039/S/RC/RFC/DT/001
T/JPT/JP039/S/RC/RF(ST)/LP/001

A
A
-

A
B
A

C
B

Doc.Ref : JPT/DRC/DR

ROOF CROWN LAYOUT PLAN


ROOF CROWN ELEVATION & SECTION
LOWER ROOF METAL DECK PLAN

Rev.No:0

Issue Date : 14 DECEMBER 2009

JURUTERA PERUNDING TEKAD MAJU SDN BHD


DRAWING REGISTER

BUILDING WORKS
Project No.

JP039 - (Tender)

Project Title

Taman Wahyu (ECOSKY)

Date

12/18/2014

Date Issued
Date

Drawing No.

No

27

11

18

24

15

18

19

23

30

11

13

Month

DEC

JAN

FEB

MAR

MAR

MAR

APR

APR

APR

APR

MAY

JUNE

JUNE

JULY

AUG

Year

2013

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

Drawing Title

Revision No.

388

T/JPT/JP039/S/RC/SL/LP/001

SKY LOUNGE LAYOUT

389
390
391
392
393

Guard House & Entrance Statement


T/JPT/JP039/S/R/GH(ST)/LP/001
T/JPT/JP039/S/R/GH/LP/001
T/JPT/JP039/S/R/GH(ST)/LP/002
T/JPT/JP039/S/R/GH/LP/002
T/JPT/JP039/S/R/GH(ST)/LP/003

GUARD HOUSE MAIN ENTRANCE LAYOUT (STEEL)


GUARD HOUSE MAIN ENTRANCE LAYOUT
GUARD HOUSE - EXIT AT TOWER C LAYOUT (STEEL)
GUARD HOUSE - TOWER C
GUARD HOUSE - ENTRANCE AT TOWER A LAYOUT

A
A
A
A
A

B
B
-

C
D
C
D
B

D
E
D
E
-

394
395
396
397

Entrance Drop-Off
T/JPT/JP039/S/R/ED(ST)/LP/001
T/JPT/JP039/S/RA/DRF/DT/001
T/JPT/JP039/S/RB/DRF/DT/001
T/JPT/JP039/S/RC/DRF/DT/001

ENTRANCE DROP-OFF LAYOUT PLAN


ENTRANCE DROP-OFF FAADE - TOWER A
ENTRANCE DROP-OFF FAADE - TOWER B
ENTRANCE DROP-OFF FAADE - TOWER C

A
-

A
A
A
A

398
399

BRIDGE CROSSING
T/JPT/JP039/S/R/CL5(ST)/LP&DT/001
T/JPT/JP039/S/R/CL12(ST)/LP&DT/001

CL5 LAYOUT PLAN


CL12 LAYOUT PLAN

A
A

400
401
402
403
404

HOARDING
T/JPT/JP039/R/LGH/LP/001
T/JPT/JP039/R/GFH/LP/001
T/JPT/JP039/S/R/TYPH/LP/001
T/JPT/JP039/S/R/7FH/LP/001
T/JPT/JP039/S/R/HG/SD/001

LOWER GROUND HOARDING LAYOUT


GROUND FLOOR HOARDING LAYOUT
TYPICAL FLOOR HOARDING LAYOUT
7F HOARDING LAYOUT
HOARDING DETAILS

A
A
A
A
A

Doc.Ref : JPT/DRC/DR

Rev.No:0

Issue Date : 14 DECEMBER 2009

You might also like