Annexure: Particulars Required For Overhead Crossing
Annexure: Particulars Required For Overhead Crossing
Annexure: Particulars Required For Overhead Crossing
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
46
47
48
49
50
51
52
53
54
55
56
57
58
59
a)
b)
c)
57
58
59
60
61
62
63
64
Condition 1
Effective weight of conductor (Wr)
Max. working Tension(T1)
Sag(s)
Condition 2
Initial working Tension(T1)
Effective Loading(w1*w1)
K
Y
When wind is still(Wh=0), so w2=wc
C
M
Tension (T2)
Sag at 75 deg C
Condition 3
Temperature diff.(75-32.2)
Working Tension(T1)
K
Y
C
Tension(T2)
Sag at (75-32.2) degC
Condition 4
Temperature diff.(-2.5-32.2)
Working Tension(T1)
K
Y
C
Tension(T2)
Sag at -2.5 degC
height difference between towers
For our span of 245m
L1
L2
L6 (from DFCC track-0 to null point)
L5 (from DFCC track-6 to null point)
L4 (from RAS track to null point)
L3 (from Existing track to null point)
Sag at L1(from null point to tower no.32)
Sag at L2(from null point to tower no.31)
Sag at L3 (4.13m) - Existing Track
Sag at L4 (36.45 m)- RAS Track
Sag at L5 (81.97m)- DFC Track-6 (near to tower no. 31)
Sag at L6 (59.1m)- DFC Track-0 (near to tower no. 31)
RAS Track height
Vertical clearance at RAS track
Existing Track height
Vertical clearance at Existing Track
DFCC Track height -0
Vertical clearance at DFCC Track-0
Vertical clearance at DFCC Track-6
L1
L2
Sag at L1
Sag at L2
Sag at L3 (99.68m) - Existing Track
Sag at L4 (59.1m)- RAS Track
Sag at L5 (67.5m)- DFC Track-6 (near to tower no. 31)
Sag at L6 (90.337m)- DFC Track-0 (near to tower no. 31)
Unit
kg/m2
kg/m
ACSR panther
30/3 mm Al./ steel 7/3.00mm dia
21
261.5
0.974
9144
0.0000193
7870
245
75
-2.5
7.592
245
4.75
2
4
45
0.630
kg / m
kg
m
mm
mm2
kg/m
kg
per deg C
kg/mm2
m
degC
degC
m
m
m
kg
kg/ m
kg
m
degC
kg
kg
m
kg
m
4.05
m
m
m
m
m
m
m
m
m
m
95.55
149.45
59.13
81.97
36.45
4.13
2.80
6.85
0.0052
0.407
2.06
1.07
4.50
23.41
5.00
22.51
9.00
18.52
19.51
68.11
176.89
0.70
4.75
1.51
0.53
0.69
1.24
degC
kg
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
19
20
21
Attributes
Code of Conductor
Size
Overall Dia
Area
Unit wt of Conductor
Ultimate tensile strenghth
Coeff of Linear Expansion
Young's modulus
Crossing Span
Max. Temp.
Min. Temp.
Max Sag at 75 deg c at normal span
Crossing Span
Min. sag at -2.5degC at normal span
FOS
FOS at 32.2 degC
Wind Presssure
Wind Load per metre (Wh)
S. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18