Resource Leveling Sample 2

These example problems show us how to optimize limited resources in practical operations management related situations.

Uploaded by

gubbare86
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
141 views

Resource Leveling Sample 2

These example problems show us how to optimize limited resources in practical operations management related situations.

Uploaded by

gubbare86
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

1. The resource requirement of the activities of a project is given below.

.
Activities
Days
Workers
Predecessor(s)
A
1
5
--B
2
5
--C
2
4
--D
3
4
A
E
1
4
B
F
4
4
B
G
2
6
C,F
H
6
4
D,E
A total of 12 workers are available. Can we manage the job with these workers?
2. A job requires the following resources.
Activities
Days
T
U
V
W
X
Y
Z

2
14
9
3
2
8
3

Crane
Operators
5
2
3
1
3
4
6

Predecessor(s)
-T
T
T
W
V& X
U&Y

Six crane operators have been recruited for the job but one would join on the 5 th day. How would
you manage the job so as to complete it at the earliest?