Generator Electrical Test #3

The document outlines various electrical inspections that need to be completed on a generator before rotor threading, including testing the insulation resistance and DC winding resistance of the stator, PI valve, CT ratio and polarity, knee point voltage, winding resistance and insulation of the rotor, and additional tests such as AC impedance, surge oscillation, withstand voltage, partial discharge, tan-delta, and RTD tests. All tests were completed on March 30th, 2012 for stator unit #3.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
254 views2 pages

Generator Electrical Test #3

The document outlines various electrical inspections that need to be completed on a generator before rotor threading, including testing the insulation resistance and DC winding resistance of the stator, PI valve, CT ratio and polarity, knee point voltage, winding resistance and insulation of the rotor, and additional tests such as AC impedance, surge oscillation, withstand voltage, partial discharge, tan-delta, and RTD tests. All tests were completed on March 30th, 2012 for stator unit #3.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Electrical Inspection needs to be done in

After Opening Blind Cover

After Flexible Connection

Generator Current transformer

Before Rotor Threading (ROTOR)

Before Rotor Threading


(STATOR)

Electrical Inspection needs to be done in stator unit #3


Remark

Insulation Resistance for Stator

Completed on
30.3.12

DC Winding Resistance for stator

Completed on
30.3.12

PI valve

Completed on
30.3.12

Insulation Resistance for Stator


DC Winding Resistance for stator
PI valve
Primary Injection :- CT Ratio Test
CT Polarity Test
Knee Point
Winding Resistance Test
Winding Insulation Test
Insulation Resistance for Rotor
DC Winding Resistance for Rotor
PI valve
AC Impendence test
RSO (Recurrent Surge Oscillograph Test)
Rotor WithStand Voltage Test
ELCID Test Of Stator
Tan-Delta Test of stator
RTD Test
Insulation Resistance for Stator