100% found this document useful (1 vote)
728 views31 pages

6 QA - QC Policy

Oa-qc polici in qatar

Uploaded by

dileepkmrg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (1 vote)
728 views31 pages

6 QA - QC Policy

Oa-qc polici in qatar

Uploaded by

dileepkmrg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 31
‘CLIENT: CONSULTANT: gi Development of Land at Ein eaisy Khaled Residential EHAF CONSULTING ENGINEERS See Development vatae Zusmanaagen — | THLE Sxainanaancn QA/QCPLAN QATAR NAVIGATION a a i QATAR NAVIGATION » i ) Development and at Ein Khaled ay Development LITY ASSURANCE & ALITY CONTROL PLAN MAIN CONTRACTOR. HASSANESCO TRADING & CONTRACTING COMPANY | HASSANESCO Prepared By: Eng, Shen Hassan CLIENT: CONSULTANT: Development of Land at Ein Khaled Residential EHAF CONSULTING ENGINEERS Development vatae TITLE QA/QC PLAN REVISION Rt This cover page is a record of all revisions ofthe document identified above by number and ttle, All previous cover pages are hereby superseded and are to be d ‘The contractor has the full right to modify, a cment and supporting documents as required or as deemed necessary. All such d vai to the “Company” for approval ‘Approvals : HCC Deseription and Page Numbers of Revisions pw. INITIAL ISSUE MAIN CONTRACTOR HASSANESCO TRADING & CONTRACTING COMPANY HASSANESCO Prepared By: Eng. Sherif Hassan ‘CLIENT: CONSULTANT: Development of Land at Ein Khaled Residential FHAF CONSULTING ENGINEERS Development varag TITLE QA/QC PLAN CONTENTS OBJECTIVE ADMINISTRATION DOCUMENTATION |. INSPECTION / SURVEILLANCE, . ORGANIZATION QUALITY CONTROL 7. ROLES & RESPOSIBILITIES 8 HASSANESCO PROCI Appendix A Appendix B Appendix C MAIN CONTRACTOR: HOC HASSANESCO TRADING & CONTRACTING COMPANY WASSANESCO repared By: Eng. Sherif Hassan CLIENT: CONSULTAN Development of Land at Ein Khaled Residential EHAF CONSULTING ENGINEERS Development CATA Zp tettt atest TITLE QATAR NAVIGATION QA/QC PLAN 1. OBJECTIVE ‘The objective, of the QA/QC control program is to ensure that all works are performed in compliance with applicable standards, specifications, regulations, codes and good construction practices. Further, this program is designed to provide a completed installation that meets all standards for a reliability, safe and environmental protection. ADMINISTRATION He will be located at the base serviced by specific. establish a satisfactory working relationship with th representative. ‘There will be a good communication bet representative and project personnel a Recognizing that the initial responsi the Executive Director, a special eff for them. ‘The Quality control and assfifancs e accomplished in the following DOCUMENTATIO! To provi F all quality control inspections and other functions. performed SURVEILLANCE fe inspection and surveillance to assure compliance with all applicable codes, procedures specifications and standard practices Hc MAIN CONTRACTOR HASSANESCO TRADING & CONTRACTING COMPANY WASSANESCO ‘rapared By: brig. Sherif Hassan ‘CLIENT: CONSULTANT: Development of Land at Ein TKtated Residential | EVA cONSULTING ERANEERS Ree Development vaTad depeeanaogen — [TITLE GktAn waVIGATION QA/QC PLAN uae 5. ORGANIZATION ‘The QA/QC organization is described in the organizational chart indicating titles, authority and reporting relationships. Specific duties and responsibilities are contained in job descriptions. The organizational framework is sufficient to identify quality problems, initiate or recommend corrective measures, and veril implementation of same. The acceptabilitytesponsibilty forall QA/QC act is assigned to the QA/QC coordinator who will be located at the Base office. Hi is responsible for supervising the Quality control and assurance organigation. The \ QA/QC officers who report to the QA/QC coordinator will be resident 2 full-time. All personnel on job site will perform their duties with safe personnel, equipment and environment in mind and shall report all unsai practices and incidents. 6. QUALITY CONTROL 1. Quality Control (QC) is a system of routine technical activities, to measure and control the quality of the project as it is being developed. 2. The QC system is designed to Provide routine and consistent checks to ensure data integrity, correctness, and comy 3. Identify and address errors. 4, Document and archive the p rial and record all QC activities. activ Jude a planned system of review procedures 1ot directly involved in the project process. 5. Quality Assurance (Qé conducted by personnel 6. Reviews quality objectives were met and support the cklist will contain critical points that should be verified while the construction is in progress. Hoc MAIN CONTRACTOR Page [5 HASSANESCO TRADING & CONTRACTING COMPANY 7 WASSANESCO Prepared By: Eng. Sheri Hassan Development mires stati TITLE QATAR NAVIGATION QA/QC PLAN CLIENT: ‘CONSULTANT: Appendix A M/ Hassanesco ISO Ce es WaSSanesco MAIN CONTRACTOR: HASSANESCO TRADING & CONTRACTING COMPANY Prepared By: Eng. Sherif Hassan CLIENT: CONSULTANT: Development of Land at Ein fH AF Khaled Residential CONSULTING ENGINEERS Development ausbane TLE QA/QC PLAN rele of'2 sealtor \ ( “This to Certify that the Environmental Management System Of HASSANESCO TRADING & CONTRACTING Doha - Qatar Has been assessed and approved by Vision International Registrar ‘To the following Standard and Requirements; ISO 9001:2008 | ‘The approved Management System is applicable to ; | GENERAL CONTRACTING WORK COMPRISING | ENGINEERING, ELECTROMECHANICALLY, PLUMBING WORKS (MEP), INFRASTRUCTURE SERVICES, AND TRADING May.15 2012 Cely | | Original Approval Current Certificate: May.15 2012 Certificate Expiry : May.14 2015 | | | | Certificate Number : 4130906 Gc | On behalf of Vision Internation: | | | “The approval in caja tothe orang iting thse yee in Accordance with vison ltrtati's tls tad regulars fr ceiftion Thiseniin 5 valid oa 2 the company name appear om one oe Hc MAIN CONTRACTOR Pave [25 HASSANESCO TRADING & CONTRACTING COMPANY Wassa 31 Prepared By: Eng. Sherif Hassan CLIENT: CONSULTANT: elk Development of Land at Ein EH AF ( gis Khaled Residential CONSULTING ENGINEERS ae Development garan a Rnd i_atoll TITLE, etre ered QA/QC PLAN Appendix B Project Quality Organi Ch ov on MAIN CONTRACTOR: HOC HASSANESCO TRADING & CONTRACTING COMPANY, WASSANESCO Page |26 31 Prepared By: Eng. Shen Hassan CLIENT: CONSULTANT: ox Development of Land at Ein fH AF ¢ FOyN Khaled Residential CONSULTING ENGINEERS Se Development gaTAR seomniaeen — | TITLE Garam naviGavion QA/QC PLAN MAIN CONTRACTOR: HCC HASSANESCO TRADING & CONTRACTING COMPANY, Wassanesco Page [27 31 Prepared By: Eng. Sheri Hassan CLIENT: CONSULTANT: Development of Land at Ein fH Khaled Residential CONSULTING ENGINEE Development gatae THLE QA/QC PLAN Appendix C Wo es Attachment I Civil & Structural QC Procedu Attachment II Mechanical QC’ res Attachment III Electri res MAIN CONTRACTOR: HASSANESCO HASSANESCO TRADING & CONTRACTING COMPANY. Page [28 31 Prepared By: Eng. Sherif Hassan ‘CONSULTANT: Development of Land at Ein fH AF Khaled Residential CONSULTING ENGINEERS Development gataa TITLE QA/QC PLAN Attachment Civil & Structural QC Procedures 1 Site handling & identification structural materials; 10 Surveyin; Site preparation; Excavation; Co Backfilling; 1 Disposal of waste materials; Formwork; 0 Scaffolding; 1 Conerete reinforcement; 1 Conerete pouring: CO Conerete curing; 10 Grouting; 1 Asphalting; (0 Paving and; D Landscaping Hoc MAIN CONTRACTOR: Page [29 HASSANESCO TRADING & CONTRACTING COMPANY, SSANESCO Prepared By: Eng. Shen Wassan CLIENT: ‘CONSULTANT: Case Development of Land at Ein tH AF ra g Khaled Residential CONSUL cg cae Ne a phen dat TITLE enone QA/QC PLAN : Attachment IT Mechanical QC Procedures Site handling & identification of piping material; ing fabrication; © Piping installation; © Piping alignment; O Fitting installation; (Pressure testing of piping; 0 Preservation of equipment; UO Tie-ins; 11 Installation of equipment; Protection, preservation & mai 10 Sanitary ware installation and Attachment IIT Electrical QC Procedures fication of electrical material; 1 Cable puilfig; Barthing system installation 5 Generator installation; O Transformer installation; Hoc MAIN CONTRACTOR: HASSANESCO TRADING & CONTRACTING COMPANY. Hassanesco Page [30 31 Prepared By: Eng. Sherif Hassan CLIENT: ‘CONSULTANT: Cass peeled Resktenal | EAP OOSUNG EREERS Development meres Zeman d_agen TITLE (QATAR NAVIGATION QA/QC PLAN (J Junetion box installation; ting system installation 0 Control panel installation; 1 Relay installation; 10 Cireuit breaker installation; 1 Cable testing; 10 Fire alarm system installation and testing; 1 Low current systems installation and testing Attachment IV Air conditioning QC Procedures O Site handling & identification of air conditioning material; 0 Storage, handling & identification of air cond 10 Ducting installation; 1 Duct Sealing; (0 Placement of Intake and Exhaust Vents; 0 Ventilation System; © Wiring installation; U Machinery installation; J Drainage system installation; U Diffusers installation; (J Air conditioning testing and cdf 1 Protection of air conditic Hc MAIN CONTRACTOR: HASSANESCO TRADING & CONTRACTING COMPANY WASSANESCO Prepared By: Eng. Sherif Hassan

You might also like