Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
546 views
4 pages
UI & DSM Difference
difference between unscheduled interchange and deviation settlement mechanism
Uploaded by
Arpit Vaidya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save UI & DSM Difference For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
546 views
4 pages
UI & DSM Difference
difference between unscheduled interchange and deviation settlement mechanism
Uploaded by
Arpit Vaidya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save UI & DSM Difference For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save UI & DSM Difference For Later
You are on page 1
/ 4
Search
Fullscreen
CERC (Central Electricity Regulatory Commission) on 17 February, 2014 has replaced the UI (Unscheduled Interchange) Regulation 2009 with Deviation settlement mechanism regulation 2014 in order to strengthen the grid and improve grid stability. This step was taken to ensure that situations of grid failure like that of 30 & 31 July, 2012 will not happen again. The grid failure has presented a case where some states were using the Ul as a trading platform; The grid failure states like Haryana, U.P. were overdrawing heavily whereas states like Rajasthan & Punjab were under drawing from their schedule resulting in frequency variation in the specified range and at the same time making the grid unstable, thus resulted in grid failure. With this regulation, CERC has implemented a volume limit for buyer and seller depending on their approved schedule, range of frequency has tighten, charges for the unscheduled interchange or deviation has increased. All this will ensure a better demand predictability by statcs and to avoid UL as a trading platform. Deviation & Settlement Mechanism will definitely improve the grid discipline and help the state in forecasting of demand and scheduling in a more accurate and stringent manner. Various provisions made in the regulation such as volume limits, additional charges, ete will force the state to procure power through bilateral route or on a day ahead basis which will help in fund flow and eventually improve the position of power sector. A summary of the deviation settlement mechanism and its comparison with the previous prevailing UI regulation is provided below: itle & Commencement Deviation settlement mechanism & related matters regulation 2014, came into force on 17.02.2014. Reference Regulation + a, Grant of connectivity, LTOA & MTOA in interstate transmission regulation 2009. + b, Interface Meters (Installation & operation of meters) regulation 2006, * c, Open Access in interstate transmission regulation 2008.Objective of the regulation is to enhance grid discipline and grid security. Applicable on Inter-state transmission of electricity. Charges receivable for under drawl by buyer and over injection by seller, while charges are payable for over drawl by buyer and under injection by seller. Provisions made in the regulation: a, Redefined frequency range and rates. b. Volume limits and deviation limits for generator and buyer ©. Cap Rate applicable d. Charges & Additional Charges €. Methodology for calculation of deviation charges. Charges and Conditions Applicable a. Charges for each step increment of frequency for each 0.01 Hz step is now equivalent to increment of 35.60 Paise/unit in the frequency range of 50.03-50.00 Hz & 20.84 Paise/unit in frequency range between 50.00Hz to not below 49.70 Hz, resulting in charges at 50.05Hz @ 0.00 Paise/umit, at 50.04Hz @ 35.60 till 50.00 Hz @ 178 Paise/unit and then from 49.99Hz onwards charges will increase at a rate of 20.84 till 49.7Hz @ 824.04 Paise/unit. In UI regulation 2009 charges for each step of frequency for each 0.02 Hz was equivalent to 16.50 Paise/Unit from 50.20Hz. till 50.02Hz, ie charges were at 50,20Hz @ 0.00 Paise/unit & at 50.02 @ 148.50 Paise/Unit, and then from 50.00Hz onwards each step increment was equivalent to Rs. 28.12 Paise/Unit i.e. charges at 50.00Hz @ 165.00 Paise/Kwh till 49.5Hz @ 900.00 Paise/Unit. b. Cap Rates are redefined in the present regulation, now the cap rate for generating stations using fuel which comes under APM is reduced to 303.04 Paise/Kwh from 421.50 paise/Kwh for higher or lower injection than the scheduled generation. Also, now there is no cap rate on generating stations which are regulated by consumer and are using Gas as fuel under APM. ¢. Charges for over injection by seller and under drawl by buyer in excess of 12% of schedule or 150 MW whichever is less shall be 0. Earlier over injection upto 120% of schedule is allowed on the corresponding frequency rate and in excess of 120% there was a cap rate of 450,00 Paise/Unit, although it was subject to 105% of declared capacity of plant in a time block and 101% of capacity of plant in a day, 4. Earlier if the injection of plant increases beyond 105% of its declared capacity in a time block or 101% of declared capacity in a day then charges for such injection will be charged at a rate of 165 Paise/unit, In the present regulation there are no such rules applicable on power plants. ¢. Clause for infirm injection before COD of generating unit is almost similar to that of UI regulation 2009, There is no volume drawl or injection limit on generating station although there is a cap rate on injection which is subject to the fuel used, for APM gas cap rate has increased from earlier charge of 2.60 Rs/Unit to 5.64 Rs/Unit. f. Volume Limits have been implemented in the present regulation, earlier there wasn't any volume limits on the overall injection or drawl, although based upon different UI volume, charges corresponding to percentage of prevailing UI charges and Cap Rates were there,g. Earlier for over drawal when frequency is below 49.80Hz, additional charges were there. Now there are volume limits too which are 12% of schedule or 150 MW whichever is less, Also, now additional charges are levied based on the deviation from schedule and not upon the frequency range as was earlier. In the present regulation no under injection of electricity by a seller shall be permissible when grid frequency is "below 49.70 Hz" and no over injection of electricity by a seller shall be permissible when grid frequency is "50.10 Hz and above. However, additional charges shall be levied now depending on the deviation from schedule more than the allowed limits ie. 12% or 150 MW whichever is less and also depends upon the frequency. Different charges are defined for the frequency range 49.70 Hz and above and below 49.70 Hz of frequency. 1. When grid frequency is 49.70 Hz and above © a, When 12% is lesser or equal to 150 MW © b, When 12% is more or equal to 150 MW 2. When grid frequeney is below 49.70 Hz. Each of the cases will apply for over drawal by a buyer and under injection by a seller when the actual draw\/injection is higher than the specified limits, For Over-Drawal by a buyer when frequency is 49.70 Hz or above When 12% — When 12% >= <=isiMW 156MW Additional Charges a. 12%-15% 150MW to +20% charges of deviation charge corresponding to average oe 200MW grid frequency of the time block. b.15%20% 200 MW to 250. 40% charges of deviation charge corresponding to average ye MW grid frequency of the time block. ©. 20% & Above 250MWand — +100% charges of deviation charge corresponding to average above grid frequency of the time block. For Under-Injection by a seller when frequency is 49.70 Hz or above When 12% — When 12% >= ere lean Additional Charges a.12%-15% 1SOMWto 420% charges of deviation charge corresponding to average grid 200MW frequency of the time block, b.15%-20% _ 200MW to 250 +40% charges of deviation charge corresponding to average grid - MW frequency of the time block, . 250 MW and —_+100% charges of deviation charge corresponding to average ©.20% & Above Shove grid frequency ofthe time block. pene " For Under-Injection by a seller using fuel coal/gas/lignite under APM & when frequency is 49.70 Hz or above When 12% When 12% <=150MW. >= 150 Mw Additional Charges4.12% 15% 1SOMW to +20% of 303.04 Paise/Unit or deviation charge corresponding to 200MW —_ average grid frequency of the time block whichever is less. b.15%20% 200 MW to +40% of 303.04 Paise/Unit or deviation charge corresponding to 7 250MW —_ average grid frequency of the time block whichever is less. 20% & 250 MW and +100% of 303.04 Paise/Unit or deviation charge corresponding to “Above above average grid frequency of the time block whichever is less, When the grid frequency is below 49.70 Hz, additional charges are levied for over drawal by a buyer or under-injection by a seller and are equivalent to 100% of 824.04 Paise/unit i.e. 1648.08 Paise/unit for the deviation. Similarly for generating station using coal/gas/lignite additional charges are equivalent to 100% of the cap rate (303.04 paise/kwh). Provided: 1, Additional charge for deviation also be levied for over-injection or under-drawal when grid frequency is 50.10 Hz or above at the rates equivalent to charges of deviation corresponding to the grid frequency of "below 50.01 Hz but not below 50.0 Hz" i.e. 178,00 Paise/unit, 2. No additional charges are levied on generating station prior to COD of unit, 3. These charges and regulation are subject to change depending upon the order, rules amendments or regulation of CERC Add comment Name (required) E-mail (required, but will not display)
You might also like
Deviation Settlement Mechanism
PDF
No ratings yet
Deviation Settlement Mechanism
16 pages
DSM Regulations Npti Webinar Final
PDF
No ratings yet
DSM Regulations Npti Webinar Final
48 pages
India-RE-Open-Access-Market - Trends and Outlook
PDF
No ratings yet
India-RE-Open-Access-Market - Trends and Outlook
38 pages
Availability Based Tariff
PDF
No ratings yet
Availability Based Tariff
24 pages
1 Amendment in DSM For CSPGCL
PDF
No ratings yet
1 Amendment in DSM For CSPGCL
19 pages
Control System
PDF
No ratings yet
Control System
62 pages
Earthing System
PDF
100% (1)
Earthing System
17 pages
Super Critical Technology in NTPC
PDF
100% (1)
Super Critical Technology in NTPC
24 pages
Welcome To 12 Week Classroom Training Program: STEAG Energy Services
PDF
No ratings yet
Welcome To 12 Week Classroom Training Program: STEAG Energy Services
44 pages
Open Access & Change in DSM (Deviation Settlement MECHANISM) Wef 01 Jan 2019
PDF
No ratings yet
Open Access & Change in DSM (Deviation Settlement MECHANISM) Wef 01 Jan 2019
14 pages
CERC Deviation Settlement Mechanism-Jhajjar
PDF
No ratings yet
CERC Deviation Settlement Mechanism-Jhajjar
39 pages
Green Energy Commitments
PDF
No ratings yet
Green Energy Commitments
18 pages
Mill Stage II
PDF
No ratings yet
Mill Stage II
68 pages
Telangana State Power Sector White Paper
PDF
No ratings yet
Telangana State Power Sector White Paper
30 pages
Distribution Management System Gyanendra Sharma NPTI Delhi
PDF
No ratings yet
Distribution Management System Gyanendra Sharma NPTI Delhi
89 pages
Review of The Principles of DSM
PDF
No ratings yet
Review of The Principles of DSM
175 pages
CERC Notification-2024
PDF
100% (1)
CERC Notification-2024
175 pages
Andhra Pradesh Code of Technical Interface
PDF
No ratings yet
Andhra Pradesh Code of Technical Interface
40 pages
Otsc - Control Final-Boiler
PDF
100% (1)
Otsc - Control Final-Boiler
85 pages
A. Indira National Power Training Institute
PDF
100% (2)
A. Indira National Power Training Institute
80 pages
Important Factors Affecting Efficiency of Power Plant
PDF
100% (1)
Important Factors Affecting Efficiency of Power Plant
7 pages
Compendium2020 PDF
PDF
100% (1)
Compendium2020 PDF
69 pages
ATT & Turbine Protection Logic
PDF
No ratings yet
ATT & Turbine Protection Logic
90 pages
LMI For Internal Audits
PDF
100% (2)
LMI For Internal Audits
16 pages
O&M Conf 2017 Paper - Mouda Learing by PUB
PDF
100% (1)
O&M Conf 2017 Paper - Mouda Learing by PUB
23 pages
Solar Green Hydrogen Report
PDF
100% (4)
Solar Green Hydrogen Report
24 pages
Swot Analysis of Indian Road Network
PDF
100% (1)
Swot Analysis of Indian Road Network
2 pages
Lakshmi Narain NTPC Aux Power Consumption Reduction
PDF
No ratings yet
Lakshmi Narain NTPC Aux Power Consumption Reduction
14 pages
Compendium Delhi PDF
PDF
100% (1)
Compendium Delhi PDF
223 pages
PAT Target Achievement: Strategies and Practices: EEC Conference 31 August, 2015
PDF
No ratings yet
PAT Target Achievement: Strategies and Practices: EEC Conference 31 August, 2015
23 pages
Coal Handeling Plant Gyanendra Sharma Npti Delhi
PDF
No ratings yet
Coal Handeling Plant Gyanendra Sharma Npti Delhi
117 pages
Managing Information Technology in Small Business
PDF
No ratings yet
Managing Information Technology in Small Business
375 pages
Boiler Protection Gyanendra Sharma NPTI Delhi
PDF
No ratings yet
Boiler Protection Gyanendra Sharma NPTI Delhi
24 pages
Perform Achieve & Trade (PAT) : A Journey Through
PDF
No ratings yet
Perform Achieve & Trade (PAT) : A Journey Through
20 pages
Summer Training Report: Badarpur Thermal Power Station (A Unit of NTPC)
PDF
100% (2)
Summer Training Report: Badarpur Thermal Power Station (A Unit of NTPC)
72 pages
Stdy Coal PDF
PDF
No ratings yet
Stdy Coal PDF
152 pages
02 - Relational Algebra
PDF
No ratings yet
02 - Relational Algebra
22 pages
Boiler Sliding Pressure Contrl
PDF
100% (1)
Boiler Sliding Pressure Contrl
28 pages
Controlling Auxiliary Power Consumption
PDF
100% (1)
Controlling Auxiliary Power Consumption
60 pages
PG DiplomaInThermalPowerPlant RecruitmentBrochure
PDF
No ratings yet
PG DiplomaInThermalPowerPlant RecruitmentBrochure
60 pages
TG Referal Datapedia
PDF
No ratings yet
TG Referal Datapedia
20 pages
Off - Site Facilities Coal Transportation Handling: 1 June 2010 PMI Revision 00 1
PDF
100% (1)
Off - Site Facilities Coal Transportation Handling: 1 June 2010 PMI Revision 00 1
40 pages
Theraml Power Plant (UPRVUNL)
PDF
No ratings yet
Theraml Power Plant (UPRVUNL)
21 pages
Power Sector
PDF
No ratings yet
Power Sector
19 pages
Project Management in Thermal Power Plant-Ntpc'S Experience
PDF
100% (1)
Project Management in Thermal Power Plant-Ntpc'S Experience
58 pages
Safety Features For Reduction of Failure in Stacker Cum Reclaimer For Thermal Power Plant
PDF
No ratings yet
Safety Features For Reduction of Failure in Stacker Cum Reclaimer For Thermal Power Plant
3 pages
Boiler Dantrubin Control Rembang Dan Pacitan
PDF
No ratings yet
Boiler Dantrubin Control Rembang Dan Pacitan
39 pages
Thermal Power Plant
PDF
No ratings yet
Thermal Power Plant
41 pages
Cost & Cost Concepts
PDF
No ratings yet
Cost & Cost Concepts
51 pages
CEA Plant Performance Report 2011-12
PDF
No ratings yet
CEA Plant Performance Report 2011-12
251 pages
500MW-Boiler - Salient Feature
PDF
No ratings yet
500MW-Boiler - Salient Feature
7 pages
Click To Edit Master Title Style Modeling Electricity Sector in India With Sub-Regional Details
PDF
No ratings yet
Click To Edit Master Title Style Modeling Electricity Sector in India With Sub-Regional Details
29 pages
Perform Achieve and Trade: Target Setting
PDF
No ratings yet
Perform Achieve and Trade: Target Setting
12 pages
Chapter-2 Steam Cycle Theory
PDF
No ratings yet
Chapter-2 Steam Cycle Theory
20 pages
Chapter - 1 1.1. Overview of 500 MW Power Plant
PDF
No ratings yet
Chapter - 1 1.1. Overview of 500 MW Power Plant
8 pages
Presentation ON Cerc Discussion Paper On Terms & Conditions of Tariff Applicable FROM 01.04.2004
PDF
No ratings yet
Presentation ON Cerc Discussion Paper On Terms & Conditions of Tariff Applicable FROM 01.04.2004
74 pages
Coal Analysis For vtps-500MW
PDF
No ratings yet
Coal Analysis For vtps-500MW
90 pages
CHP For EET-r2
PDF
No ratings yet
CHP For EET-r2
41 pages
Deviation Regulation
PDF
No ratings yet
Deviation Regulation
41 pages
01budge Budge Generating Station Cesc Limited Budge Budge
PDF
No ratings yet
01budge Budge Generating Station Cesc Limited Budge Budge
12 pages
2 - CEA - 3 - Env Norms - N Singh - CEA PDF
PDF
No ratings yet
2 - CEA - 3 - Env Norms - N Singh - CEA PDF
10 pages
Takniki Darpan - Issue 7
PDF
No ratings yet
Takniki Darpan - Issue 7
40 pages
Basic Importance of Burner Tilt in Thermal Power Plant
PDF
No ratings yet
Basic Importance of Burner Tilt in Thermal Power Plant
9 pages
Ammonia Industry - Net Zero Industry Tracker
PDF
No ratings yet
Ammonia Industry - Net Zero Industry Tracker
10 pages
21-May-2010 - Presentation On UI Account As Per New Guidelines
PDF
No ratings yet
21-May-2010 - Presentation On UI Account As Per New Guidelines
37 pages
BCP Installation & Commissioning
PDF
100% (2)
BCP Installation & Commissioning
18 pages
Abt Uideviationsettlement 160118081553 PDF
PDF
No ratings yet
Abt Uideviationsettlement 160118081553 PDF
42 pages
CERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2014 Dated 06.01.14
PDF
No ratings yet
CERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2014 Dated 06.01.14
42 pages
MS 06 18 - BFB Boiler Pre-Start Checks - Rev B - 15 05 12
PDF
No ratings yet
MS 06 18 - BFB Boiler Pre-Start Checks - Rev B - 15 05 12
6 pages
LTP
PDF
100% (4)
LTP
68 pages
Sample Project Synopsis
PDF
No ratings yet
Sample Project Synopsis
5 pages
CMC Control
PDF
No ratings yet
CMC Control
28 pages
Risk N Return
PDF
No ratings yet
Risk N Return
59 pages
US - India Insights On Business
PDF
No ratings yet
US - India Insights On Business
3 pages