APPROACH PLAN OF

DESIGN IN PIPELINES

Delivering excellence through people

GAS PIPELINES

FACILITIES

DESPATCH STATION
RECEIPT STATION
PIPELINE BETWEEN DESPATCH & RECEIPT STATION
PIGGING STATION
SV (SECTIONALIZING VALVE) STATION

PREPARATION OF DESIGN BASIS DOCUMENT CONTAINING ALL


THE DATA FOR DESIGN OF PIPELINE AS PER CLIENTS
REQUIREMENT

Engineers India Ltd Delivering excellence through people

CONTENTS OF DESIGN BASIS

THROUGHPUT DATA : MMSCMD OF GAS


GAS COMPOSITION & TYPE : ASSOCIATED GAS ,
FREE GAS, RLNG, etc.
PIPELINE LENGTH
B/L PRESSURE AT SOURCE & CONSUMER POINTS
LOCATION OF CONSUMERS
CONTRACTED VOLUMES

Engineers India Ltd Delivering excellence through people

COMMON DESIGN PRACTICES

600# RATED VALVE & FITTINGS CONSIDERED.


MAWP OF 99.93 KG/CM2 G @ 65 0C
DESIGN LIFE DECIDED BY OWNER GENERALLY 25 -30
YEARS
ASME B31.8 & OISD-226 REFERRED FOR GENERAL
GUIDANCE

Engineers India Ltd Delivering excellence through people

BASIS OF SIMULATION STUDY

33% EXTRA CAPACITY OVER CONTRACTED VOLUME


AS PER PNGRB GUIDELINES TO TAKE CARE OF
FUTURE CONSUMPTION / EXPANSION
OPTIMUM NO. OF COMPRESSOR STATIONS DECIDED
ON FOLLOWING BASIS:
MINIMUM SUCTION PRESSURE AS 45 KG/CM2 G
DISCHARGE PRESSURE OF 92-99.93 KG/CM2 G
POWER PLANT PRESSURE REQUIREMENT~ 25-30
KG/CM2 G
FERTILIZER PLANT REQUIRE AT 40-45 KG/CM2G
PETROCHEMICAL PLANT REQUIRE AT 50-55KG/CM2G
Engineers India Ltd Delivering excellence through people

BASIS OF SIMULATION STUDY

MAINTAIN VELOCITY LIMIT 10 15 m/s


PRESSURE DROP 0.25 0.35 Kg/cm2 PER KM
INTER COMPRESSOR DISTANCE 150 250 KM
SIMULATION CARRIED TO ESTABLISH HYDRAULICS
FOR THREE LINE SIZES BASED ON ABOVE
GUIDELINES

Engineers India Ltd Delivering excellence through people

SOFTWARE USED
PIPELINE STUDIO TGNET FROM ESI
(ENERGY SOLUTION INTERNATIONAL)
HYSIS FROM HYPROTECH LTD
WINSIM DESIGN-II
INHOUSE SOFTWARE ON SPREAD SHEET

Engineers India Ltd Delivering excellence through people

BROAD EQUIPMENT SPECIFICATIONS


(PREPARED FOR ALL OPTIONS)

CONTENTS
PIPELINE:SIZE,
LENGTH,
MATERIAL
OF
CONSTRUCTION (MOC), DESIGN PRESSURE &
TEMPERATURE.
COMPRESSORS:RATED FLOW,
RATIO, RATED BKW, CP/CV, MW

COMPRESSION

SELECTION OF OPTIMUM CONFIGURATION BASED


ON LOWEST NPV(NET PRESENT VALUE)
Engineers India Ltd Delivering excellence through people

DETAILED EQUIPMENT SPECS.


(FOR OPTIMUM CASE)
CONTENTS:
LINE PIPE
COMPRESSOR INCLUDING AFTER COOLER
GAS FILTERS
KNOCK OUT DRUMS
INSTRUMENTS
PRESSURE REGULATION SKID.
METERING
CONTROL VALVES
SAFETY VALVES

Engineers India Ltd Delivering excellence through people

P&ID DEVELOPMENT

DETAILS OF PIPING, SIZING & RATING etc.


INSTRUMENTATION
CONTROLS & INTERLOCKS FOR SAFE ,EFFICIENT
& RELIABLE OPERATION OF PIPING SYSTEM

Engineers India Ltd Delivering excellence through people

UTILITY REQUIRED

UTILITY SUMMARY PREPARED FOR EACH


FACILITY
UTILITIES REQUIRED
INSTRUMENT AIR (CONTINUOUS BASIS)
PLANT AIR FOR CLEANING
(INTERMITTENT BASIS)
NITROGEN FOR PURGING,INERTIZATION,DRY
GAS SEAL (CONTINUOUS BASIS)
SERVICE WATER FOR FLUSHING & CLEANING
(INTERMITTENT BASIS)
POWER (CONTINUOUS BASIS)

Engineers India Ltd Delivering excellence through people

UTILITY REQUIRED (CONTD.)

UTILITIES FOR COMPRESSOR ARE ESTIMATED


FROM DATA BASE OF PREVIOUS PROJECTS.
EQUIPMENT / SPECIFICATION & P&ID DEVELOPED
FOR UTILITY SYSTEMS

Engineers India Ltd Delivering excellence through people

LIQUID PIPELINES

FACILITIES
DESPATCH STATION
RECEIPT STATION
PIPELINE BETWEEN DESPATCH & RECEIPT STATION
PIGGING STATION
SV STATION

PREPARATION OF DESIGN BASIS DOCUMENT


CONTAINING ALL THE DATA FOR DESIGN OF
PIPELINE AS PER CLIENTS REQUIREMENT

Engineers India Ltd Delivering excellence through people

CONTENTS OF DESIGN BASIS

THROUGHPUT DATA : MMTPA OF LIQUID


LIQUID TYPE
: CRUDE OIL, HVP LIQUID LIKE
LPG,C2/C3 ,REFINED PETROLEUM PRODUCTS e.g.
MS,SKO,HSD,ATF
SPECIFIC GRAVITY,VISCOSITY AT TWO
TEMPERATURES
PIPELINE LENGTH
B/L PRESSURE AT SOURCE & DESTINATION
LOCATION OF TAP-OFF POINTS
TAP-OFF QUANTITIES

Engineers India Ltd Delivering excellence through people

COMMON DESIGN PRACTICES

600# RATED VALVE & FITTINGS CONSIDERED.


MAWP OF 99.93 KG/CM2 G @ 65 0C
DESIGN LIFE DECIDED BY OWNER GENERALLY 25 -30
YEARS
ASME B31.4 & OISD-141 REFERRED FOR GENERAL
GUIDANCE

Engineers India Ltd Delivering excellence through people

BASIS OF SIMULATION STUDY

8000 HRS (333 DAYS)PUMPING CONSIDERED


PER YEAR
OPTIMUM NO. OF PUMPING STATIONS DECIDED
ON FOLLOWING BASIS:

MINIMUM SUCTION PRESSURE AS 4-5 KG/CM2 G

MAXIMUM DISCHARGE PRESSURE OF 90


KG/CM2 G

Engineers India Ltd Delivering excellence through people

BASIS OF SIMULATION STUDY


(Contd)

MAINTAIN VELOCITY LIMIT OF 2 m/s


PRESSURE DROP 0.50 Kg/cm2 PER KM
INTER PUMPING DISTANCE ABOUT 200 KM
SIMULATION CARRIED TO ESTABLISH HYDRAULICS
FOR THREE LINE SIZES BASED ON ABOVE
GUIDELINES.

Engineers India Ltd Delivering excellence through people

SOFTWARE USED
PIPELINE STUDIO TLNET FROM ESI
(ENERGY SOLUTION INTERNATIONAL)
INHOUSE SOFTWARE ON SPREAD SHEET

Engineers India Ltd Delivering excellence through people

SURGE ANALYSYS
SURGE IN PIPELINE IS PRODUCED DUE TO CHANGE IN
VELOSITY OF MOVING STREAM
SURGE ANALYSYS CARRIED OUT FOR FOLLOWING
CASES WHICH RESULT IN CHANGE IN VELOCITY:
CLOSURE OF SECTIONALIZING VALVE ON MAINLINE
CLOSURE OF INLET VALVE OF STORAGE TANK
STOPPAGE OF PUMPS AT ORIGINATING /INTERMEDIATE
STATION

SURGE RELIEF VALVES/INTERLOCKS TO SHUT


PIPELINE THROUGH SCADA PROVIDED TO PROTECT
PIPELINE FROM EXCESS SURGE PRESSURES
Engineers India Ltd Delivering excellence through people

BROAD EQUIPMENT SPECIFICATIONS


(PREPARED FOR ALL OPTIONS)

CONTENTS
PIPELINE:SIZE,
LENGTH,
MATERIAL
OF
CONSTRUCTION (MOC), P & T.
PUMPS: DIFF. HEAD, SHUT OFF PRESSURE,
RATED FLOW, MOC, SP. GRAVITY OF LIQUID
HANDLED, RATED BKW ( = 75%)

SELECTION OF OPTIMUM CONFIGURATION BASED


ON LOWEST NPV(NET PRESENT VALUE)
Engineers India Ltd Delivering excellence through people

DETAILED EQUIPMENT SPECS


(FOR OPTIMUM CASE)
LINE PIPE
SCRAPER LUNCHER/RECEIVER
PUMPS
BASKET FILTERS
BLOW DOWN DRUMS
INSTRUMENTS
METERING
CONTROL VALVES
SAFETY VALVES
SURGE RELIEF VALVE

Engineers India Ltd Delivering excellence through people

BATCH SIZING AND SEQUENCING

(FOR OPTIMUM CASE)


MUTUALLY COMPATIBLE PRODUCTS PUMPED FACE
TO FACE (-SKO-HSD-SKO-MS-SKO-ATF-SKO-)
ESTIMATION OF INTERFACE VOLUMES USING
EQUATION BY AUSTIN AND PALFREY
ESTIMATION OF MINIMUM BATCH VOLUMES TO
RESTRICT CONTAMINATION WITHIN PERMISSIBLE
LEVELS (1% SKO IN MS AND 2% SKO IN HSD)
ESTIMATE BATCH CYCLES OF PRODUCTS AND
TANKAGES REQUIRED AT RECEIPT TERMINALS.

Engineers India Ltd Delivering excellence through people

Engineers India Ltd Delivering excellence through people

TECHNICAL IMPROVEMENTS
INTERNAL FLOW IMPROVER EPOXY COATINGS
REDUCTION IN FRICTION LOSSES,PROJECT COST

AND OPERATIONAL COST


VFD MACHINES

FLEXIBILITY
LOSSES

IN

OPERATION,REDUCTION

Engineers India Ltd Delivering excellence through people

IN

POWER

THANK YOU