DESIGN IN PIPELINES
GAS PIPELINES
FACILITIES
DESPATCH STATION
RECEIPT STATION
PIPELINE BETWEEN DESPATCH & RECEIPT STATION
PIGGING STATION
SV (SECTIONALIZING VALVE) STATION
SOFTWARE USED
PIPELINE STUDIO TGNET FROM ESI
(ENERGY SOLUTION INTERNATIONAL)
HYSIS FROM HYPROTECH LTD
WINSIM DESIGN-II
INHOUSE SOFTWARE ON SPREAD SHEET
CONTENTS
PIPELINE:SIZE,
LENGTH,
MATERIAL
OF
CONSTRUCTION (MOC), DESIGN PRESSURE &
TEMPERATURE.
COMPRESSORS:RATED FLOW,
RATIO, RATED BKW, CP/CV, MW
COMPRESSION
P&ID DEVELOPMENT
UTILITY REQUIRED
LIQUID PIPELINES
FACILITIES
DESPATCH STATION
RECEIPT STATION
PIPELINE BETWEEN DESPATCH & RECEIPT STATION
PIGGING STATION
SV STATION
SOFTWARE USED
PIPELINE STUDIO TLNET FROM ESI
(ENERGY SOLUTION INTERNATIONAL)
INHOUSE SOFTWARE ON SPREAD SHEET
SURGE ANALYSYS
SURGE IN PIPELINE IS PRODUCED DUE TO CHANGE IN
VELOSITY OF MOVING STREAM
SURGE ANALYSYS CARRIED OUT FOR FOLLOWING
CASES WHICH RESULT IN CHANGE IN VELOCITY:
CLOSURE OF SECTIONALIZING VALVE ON MAINLINE
CLOSURE OF INLET VALVE OF STORAGE TANK
STOPPAGE OF PUMPS AT ORIGINATING /INTERMEDIATE
STATION
CONTENTS
PIPELINE:SIZE,
LENGTH,
MATERIAL
OF
CONSTRUCTION (MOC), P & T.
PUMPS: DIFF. HEAD, SHUT OFF PRESSURE,
RATED FLOW, MOC, SP. GRAVITY OF LIQUID
HANDLED, RATED BKW ( = 75%)
TECHNICAL IMPROVEMENTS
INTERNAL FLOW IMPROVER EPOXY COATINGS
REDUCTION IN FRICTION LOSSES,PROJECT COST
FLEXIBILITY
LOSSES
IN
OPERATION,REDUCTION
IN
POWER
THANK YOU