Feuille Calcul Gas Pipeline Blowdown Time
Feuille Calcul Gas Pipeline Blowdown Time
Feuille Calcul Gas Pipeline Blowdown Time
P
t c ln i
Pa
k
k 1
ln
2
k 1
k 1
k 1 2( k 1)
V
2
v
c Ath C d
Z k R T
MW
1
Pi 5270 101.785SG
1
T 3.825
f L
f L
f L
C f a1 a 2 log 10
a3 log 10
a 4 log 10
D
D
1
a1 1.0319 5.2735
Ar
1
25.680
Ar
1
38.409
Ar
1
1
1
a2 0.2699417.304 86.415 144.77
Ar
Ar
Ar
1
1
1
a3 0.2417512.637 56.772 88.351
Ar
Ar
Ar
2
1
1
1
a4 0.054856 2.6258 8.9593 12.139
Ar
Ar
Ar
Ar
Ap
Ath C d
Note:
The polynomials for the coefficients (a1, a2, a3, a4) are valid only for 3 < Ar < 30 and should
not be used outside this range.
Pc
k
1.20
1.25
1.30
1.35
1.40
1.45
1.50
1.55
1.60
ts
0.5645
0.5549
0.5457
0.5368
0.5283
0.52
0.512
0.5042
0.4968
t tot t c t s V C f
0.7371
0.7605
0.7833
0.8058
0.8278
0.8495
0.8707
0.8916
0.9122
where:
tc =
Pi =
Pa =
k=
V =
Ap =
Ath =
V=
c=
Z=
SG =
T=
R=
MW =
Cf =
f=
L=
D=
Ar =
Ath*Cd =
Notes:
1. For full-bore ball valves the "discharge area" will be considered the
same as the blowdown line cross-sectional area
2. For reduced bore ball valves the "discharge area" should be considered
based on the cross-sectional area of one size lower than the blowdown
line size
Blowdown Valve discharge coefficient, dimensionless
(Use a value of 0.85 to 1 in absence of manufacturer's data)
Effective valve discharge area, m2
Pc =
Cd =
2 k 1
Pc
k 1
ts =
ttot =
mm
26.64 (1" STD)
0.023
0.021
0.019
0.018
0.017
0.015
0.014
0.014
0.013
0.013
0.013
0.012
0.012
0.012
0.011
0.011
gas at 6000 kPa(abs) and 10C. The gas has a specific gravity of 0.6.
The blowdown valve is a 8" full bore valve on a 8" blowdown line
The atmospheric pressure is 100 kPa(abs).
Inputs
Pi =
Pa =
k=
Cd =
D=
T=
SG =
f=
BDV size =
L=
ts =
Calculations
Z=
MW =
V=
c=
Ath =
Ap =
Ar =
tc =
6000 kPa(abs)
100
1.3
0.85
0.895
10
0.6
0.011
8
25000
0.7833
kPa(abs)
input from external source
m
C
inch
m
23.6
3.49
a1 =
0.8514
a2 =
0.3229
a3 =
-0.1991
a4 =
0.0413846
Losses
ttot =
Prepared by:
Email:
Refer table
3
15728.1 m
390.4 m/s
2
0.031 m
2
0.629 m
2578.0 seconds
ttot =
0.87
17.4
V =
Cf =
1.06
11669.7 seconds
1.05
12253.2 seconds
204.2 minutes
Ankur Srivastava
Chemical Engineer
[email protected]
Mass Flow Rate for Gas Pipeline Blowdown through Hole or Orifice
Notes:
1. The depressuring or blowdown is assumed to be adiabatic and the heat
exchange with the environment is neglected.
Sonic or Choked Release Rate (ms), kg/s
If the pressure ratio (Pa/Pi) is less then or equal to the critical pressure ratio (Pc) then the
flow is sonic or choked and the mass flow rate through the hole or orifice can be calculated
from:
2
m s C d Ath i Pi k
k 1
k 1
k 1
where:
Pa =
Pi =
ms =
Cd =
Ath =
i =
T=
MW =
Z=
SG =
k=
Pi MW
8314 T Z
Inputs
Pi =
k=
Cd =
T=
SG =
Hole/ Orifice Size =
Z=
Calculations
MW =
i =
6.00E+06 Pa (abs)
1.3
0.62
10
0.6
2 inch
0.87
17.4
3
50.9 kg/m
Ath =
ms =
2
0.00203 m
14.65 kg/s
2 k 1
m ss C d Ath i Pi k
k 1
where:
mss =
P
a
Pi
k
P
1 a
Pi
Inputs
Pa =
k=
Cd =
T=
SG =
Hole/ Orifice Size =
Z=
Psc =
Calculations
MW =
Pi =
k 1
k
1.00E+05 Pa (abs)
1.3
0.62
10 C
0.6
2 inch
1
0.5555
Ath =
17.4
1.80E+05 Pa (abs)
0.99978
3
1.3 kg/m
2
0.00203 m
mss =
0.41 kg/s
=
i =
k 1
2 k 1 k 1
k 1 2