0% found this document useful (0 votes)
20 views1 page

To: Date: Attention:: Your Valuable Comments in This Regards Would Be Highly Appreciated

This letter provides two notes regarding a hydro power project. Note 1 states that concrete will be supplied by the client up to where vehicles can reach, at a cost of Rs.5750 per cubic meter. Note 2 indicates that the quoted contractor all risk policy value may vary depending on the job offered. Comments on these notes are requested.

Uploaded by

Anonymous dHyxmD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views1 page

To: Date: Attention:: Your Valuable Comments in This Regards Would Be Highly Appreciated

This letter provides two notes regarding a hydro power project. Note 1 states that concrete will be supplied by the client up to where vehicles can reach, at a cost of Rs.5750 per cubic meter. Note 2 indicates that the quoted contractor all risk policy value may vary depending on the job offered. Comments on these notes are requested.

Uploaded by

Anonymous dHyxmD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

To:

Fin Consultant Hydro Power (Pvt) Ltd.

Date:

October 31, 2014

Attention:

The Manager

Dear Sir,
Note 1: Concrete Rate
If Concrete is supplied by client up to the vehicle can reach.
Cost per meter cube = Rs.5750.00
Note 2: Contractor all risk policy
Value what we quoted can be varied with the job offered.

Your Valuable comments in this regards would be highly appreciated.


Thanking You.

Yours faithfully,

L. Dadallage
Director Paters Lanka Engineers