PSOC (Assignment 1,2 Units)

1. Explain how to formulate the bus admittance matrix (Ybus) using the inspection method and find the Ybus for the sample system. 2. (a) Provide a flow chart for the Gauss-Seidel method of load flow solution including relevant equations. (b) Obtain the voltages at bus 2 and 3 after the first iteration. 3. (a) Discuss the importance of load flow studies and the need for slack buses. (b) Compare load flow methods providing relevant equations, assumptions, advantages and limitations.

Uploaded by

hareesh.makesu
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views

PSOC (Assignment 1,2 Units)

1. Explain how to formulate the bus admittance matrix (Ybus) using the inspection method and find the Ybus for the sample system. 2. (a) Provide a flow chart for the Gauss-Seidel method of load flow solution including relevant equations. (b) Obtain the voltages at bus 2 and 3 after the first iteration. 3. (a) Discuss the importance of load flow studies and the need for slack buses. (b) Compare load flow methods providing relevant equations, assumptions, advantages and limitations.

Uploaded by

hareesh.makesu
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

PSOC (Assignment 1,2 Units)

1. Explain formulation of Ybus using inspection method. Find y-bus for the
system shown.

2. (a)raw !ow chart for "auss #iedel method of load !ow solution with
rele$ant e%uations considering &' buses
(b) (btain $oltages at bus 2 and ) at the end of *rst iteration
). a) +hat is importance of load !ow study, +hat is the need of slac- bus in
load !ow studies, +hat are the %uantities speci*ed at the load of a load !ow
study, +hat are the un-nowns at $oltage controlled buses.
b) .ompare all the load !ow methods( pro$ide rele$ant e%uations/
assumptions/ ad$antages and limitations)
0. e*ne1Explain the following
a) 2ncremental fuel rate
b) penalty factor
c) 234
d) .urrent distribution factor
e) 2ncremental .ost
5. eri$e co ordination e%uations for economic operation without considering
losses.
6. eri$e the expression for transmission losses in a power networ- that can be
used directly for economic scheduling of generators using current distribution
factors. #tate assumptions made.