0% found this document useful (0 votes)
275 views2 pages

Pert CPM

This document outlines a critical path analysis for a project with activity nodes m, a, b, and s. It lists the predecessor and immediate predecessor nodes, estimated activity times with mean and standard deviation, and calculates the probability of completing the critical path before a deadline based on the activity variances.

Uploaded by

Juan Ipr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
275 views2 pages

Pert CPM

This document outlines a critical path analysis for a project with activity nodes m, a, b, and s. It lists the predecessor and immediate predecessor nodes, estimated activity times with mean and standard deviation, and calculates the probability of completing the critical path before a deadline based on the activity variances.

Uploaded by

Juan Ipr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Activity Node a m b m s Node Predecessor

IMMEDIATE
PREDECESSORS
KNOWN
m and s
ACTIVITY TIMES
3-TIME ESTIMATE
MEAN
STANDARD DEVIATION* * Assumes all critical activities are on one critical path
VARIANCE*
If not, enter in gold box, the variance on one critical path of interest.
PROBABILITY COMPLETE BEFORE =
Acitivty Node Critical m s
s
2
ES EF LS LF Slack
CRITICAL PATH ANALYSIS

You might also like