0% found this document useful (0 votes)
201 views

WMS Task Assignments

This document outlines task assignments for picking items. It describes creating a task assignment rule to direct a picking task for item NB-004 to a specific operator based on their abilities or required equipment. When an order is created for item NB-004 and pick release is executed, the system will assign the defined task.

Uploaded by

Nestor Boscan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
201 views

WMS Task Assignments

This document outlines task assignments for picking items. It describes creating a task assignment rule to direct a picking task for item NB-004 to a specific operator based on their abilities or required equipment. When an order is created for item NB-004 and pick release is executed, the system will assign the defined task.

Uploaded by

Nestor Boscan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Task Assignments

1. Task Assignment

Overview
Assign Specific User Task to a Particular Item. Task Assignment Rule can
direct picking tasks to specific operators, operator with specific abilities,
equipments, etc.

Execution
1. A User Task was created

2. Rule was created to assign a specific Task for picking item NB-004.
Weight is higher of any other Pick Task.

3. Order for NB-004 was created



4. Pick Release is Executed

5. System Assigned the Task defined above

You might also like