Normal Design: Depressurize From Design Pressure To 50% in 15 Minutes
Normal Design: Depressurize From Design Pressure To 50% in 15 Minutes
p= API521 PAG.136
A
T
=
Vent stack area (m
2
)
C= Velocity (m/s)
150
m= Flowrate (Kg/hr) 25000.00
p
2
= Outlet pressure (KPa) 101.00
Z= compressibility factor 1.00
T= Outlet temperature (K) 310.00
K= 1.30
M= Molecular weight 20.00
RESULTS:
C= 409.39
A
T
= 0.06 diametro (m)= 0.27 11 "
p= 0.79
Ma
2
= 0.4190077
V= Volume to be depressurized (m
3
) 50.00
T= Time for depressurizing (m) 15.00 (1)
F= Flow rate (m
3
/hr) 200
(1)Normal design: depressurize from design pressure to 50% in 15 minutes
Ma
2
= 0.50
d= 0.251
Height: According to API521 (3mt higher than max top equipment or building)
Opzioni di calcolo
per GEA/ENEL
Mach Number
Vent Tip Diameter (m)
Density (kg/m3)
Cp/cv
m/s
(m
2
)
kg/m3
Mach number