Time Frame in System Development

This document outlines a time frame for system development from September to November. It includes gathering data and defining system procedures in the first week of September. Form creation and design is scheduled for the second week of September, with features planned for the third to fourth weeks. Database and device connections are slated for October and November, along with output development and testing throughout November. The status shows data gathering, design, and database connection as partially complete, with other tasks still underway or not started.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views2 pages

Time Frame in System Development

This document outlines a time frame for system development from September to November. It includes gathering data and defining system procedures in the first week of September. Form creation and design is scheduled for the second week of September, with features planned for the third to fourth weeks. Database and device connections are slated for October and November, along with output development and testing throughout November. The status shows data gathering, design, and database connection as partially complete, with other tasks still underway or not started.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Time Frame

1 September
a Data need to insert to the sytem 1st Week
b Who will use the system? 1st Week
c System Procedure 1st Week
2 September
a Creating Forms 2nd Week
b Designing Forms 2nd Week
c Tools need to use in the Forms 2nd Week
d Features 3rd to 4th Week
3 October
a Identify Posible Tables need to create 1st Week
b Procedute on how to connect to MS Access 1st Week
c Source Code for Connection 2nd Week
d Linking Table in Access 3rd Week
e Create/ Add,Update/Edit,Delete 4th Week
4 November
a Procedute on how to connect to to RFID Device 1st Week
b Source Code for Connection 2nd Week
c Testing 3rd Week
d Evaluation 4th Week
5 November
a System Output 4th Week
b Printable Output 4th Week
Development of Desired Output
Task
TIME FRAME IN SYSTEM DEVELOPMENT
Data Gathering
Design
Database Connection
Device Connection
Status
Partially Done
Undone
Partially Done
On Process
On Process
On Process
Undone
On Process
On Process
Undone
Undone
Undone
Undone
Undone
Undone
Undone
Undone
Undone
TIME FRAME IN SYSTEM DEVELOPMENT

You might also like