Oracle EAM Understanding
Oracle EAM Understanding
WhicharedifferentprocessflowsinOracleeAMmodule?
Thereare2typesofprocessflowsineAMmoduleasfollows:
1)WorkExecutionImplementationFlow
First,YouhavetocreateaMaintenanceWorkinProcess(WIP)Accounting
ClassesandthenyouneedtodefineResourcesandMaintenanceDepartments.
Afterwards,youdecideifemployeeassociationisrequiredwithresource.If
employeeandresourceassociationisrequired,createresourceandemployee
associationsandifitisnotrequiredthencreatedepartmentandresource
associations.
Finally,youdecideifWorkOrdersareincludedinprojects.Ifincludedthenyou
needtosetupProjectManufacturingmodule,andthencreateaWorkOrder.If
WorkOrdersarenotincludedinprojects,createaWorkOrder.
2)PreventiveMaintenanceImplementationFlow
First,YouhavetocreateanAssetGroup.
Next,decideifPreventiveMaintenance(PM)definitionsarebasedonruntime
rules.IfYes,createMeterTemplates,nextAssetGroupandMeterassociations
usingthosetemplates,andthencreateaSetName.IfitisNOi.e.ifPM
definitionsarenotbasedonruntimerules,createaSetNamedirectly.
Next,createaMaintenanceActivityandthenAssetGroupandActivity
associationsusingtemplates.Finally,optionallyyouhavetocreatePMSchedule
templates.
PostedbyOracleOnDemandat4:15PM0comments
Labels:EnterpriseAssetManagement(eAM),SAM,VKD
OracleEAM-Differenttypesofassets
Explainthedifferenttypesofassets?
Thereare2typesofassets
a)CapitalorfinancialAssets
b)Maintenanaceassets
MaintenanceAssetscanbeclassifiedintothefollowingtwotypes:
1)LinearAssets
LinearAssetshavelinearpropertiesandareconnectedwitheachotherbytheir
relationshipwiththelinearinfrastructureitself.i.e.Networks
Forexampleametropolitancitywhichhasahugenetworkofsubways&
roadways.YoucanmodelthemaslinearassetsinanAssetManagement
systemandthebuildings,polesparksandterminalscanberepresentedasnon-
linearassets.ThejoinsandoverlapsoftheLinearAssetsmakeupthe
networksandthenon-linearassetscanbeplacedwithinthatNetworkfor
positioningandtrackingpurposes.
ExampleareRoads,Raillinesandtracks,Highways,airportrunways,
harbors,Ports,Subways,cables,Waterways,TransmissionLines,Water&Sewer
pipelines,Oil&GasPipelines
2)Non-LinearAssets
Anon-linearassetdoesnothaveanylinearproperty,occupiessomespaceas
perdimensionandcanbetrackedbyitslocationormodeledaspartofa
parentchildhierarchy.
Forexample,Mobileassetssuchasfleet,vehicles,toolsandequipment,Fixed
Physicalassetsi.e.plant,equipment,facility,Componentrelationshipbasedassets
(aircraft,ship),Terminals,Railcars,Buses,Trucks,Buildings,Parks,Poles,
Substations,Facilities,PowerGeneratingPlants&Equipment,PumpingStations,
ExtractionFacility.
PostedbyOracleOnDemandat3:51PM1comments
Labels:EnterpriseAssetManagement(eAM),SAM,VKD
Tuesday,December30,2008
ImplementationstepsforOracleeAMmodule
ListalltheimplementationstepsforOracleeAMmodule?
1)SettingUpOrganizations
2)EnablingOrganizationsforEnterpriseAssetManagement
3)DefiningeAMParameters
4)SettingUpAreas
5)DefiningDepartmentsandResources
6)DefiningDepartmentApprovers
7)DefiningMiscellaneousDocuments
8)DefiningLookupsincluding
-ActivityTypes
-ActivityCauses
-ActivitySources
-AssetActivityPriorities
-CostCategoryCodes
-CriticalityCodes
-AssetImportScopeCodes
-AssetImportStatuses
-ContactPreferences
-WorkRequestStatuses
-WorkRequestTypes
-WorkOrderandWorkRequestPriorityCodes
-WorkOrderReconciliationCodes
-WorkOrderTypes
9)SettingUpCategoryCodes
10)DefiningAssetGroups
11)DefiningActivities
12)ActivityAssociationTemplates
13)SettingUpAttributeGroups
14)DefiningAssetDocuments
15)DefiningAssetNumbers
16)DefiningAssetRoutes
17)SettingUpAssetBillsofMaterial
18)DefiningActivities
19)NavigatingtheActivityWorkbench
20)DefiningMaintenanceRoutes
21)SettingUpMaintenanceBillsofMaterial
22)AssociatingAssetNumberswithActivities
23)CreatingActivityTemplates
24)DefiningRebuildableItems
25)DefiningRebuildableSerialNumbers
26)RebuildableItem/ActivityAssociation
27)DefiningRebuildableBillsofMaterial
28)TosetupaNon-StockDirectItem
29)ProjectandTaskSetup
30)DefiningMeterTemplates
31)DefiningMeters
32)AssociatingMeterTemplateswithAssetGroups
33)AssociatingMeterswithAssetNumbers
34)DefiningSetNames
35)DefiningaPreventiveMaintenanceTemplate
PostedbyOracleOnDemandat10:21PM0comments
Labels:EnterpriseAssetManagement(eAM),SAM,VKD
WhichresponsibilitiesareautomaticallycreatedduringinstallationprocessofEAM
?
WhichresponsibilitiesareautomaticallycreatedduringinstallationprocessofEAM
?
WheninstallingOracleEnterpriseAssetManagement,theinstallationprocess
automaticallycreatesthefollowingfiveresponsibilities:
a)OracleEnterpriseAssetManagement
b)MaintenanceUserWorkbench
c)MaintenanceSuperUser
d)Self-ServiceWorkRequests
e)SelfServiceTimeandExpenses
The'OracleEnterpriseAssetManagement'responsibilitymentionedaboveisa
superuserresponsibility.Itincludesthenecessaryfunctionstosetupand
implementOracleEnterpriseAssetManagement.
PostedbyOracleOnDemandat9:04PM0comments
Labels:EnterpriseAssetManagement(eAM),SAM,VKD
Whicharepre-requisitesforinstallingEAMmodule?
Whicharepre-requisitesforinstallingEAMmodule?
a)ConfiguringConcurrentManagersandPrinters
b)SetupResponsibilitiesandassigningresponsibilitiesasperrequirements
c)SettingupWorkflowmoduleifworkrequest(s)requireapprovalfroma
maintenancedepartmentuser
PostedbyOracleOnDemandat9:00PM0comments
Labels:EnterpriseAssetManagement(eAM),SAM,VKD
MandatoryandOptionalOracleApplicationsmodulesforOracleEAM
ToworkwithEAM,whicharetheMandatoryandOptionalOracleApplications
modules/products?
Mandatorymodulesare
a)Inventory
b)BillsofMaterial
c)CostManagement
d)WorkinProcess
e)ManufacturingScheduling
f)Quality
g)HumanResource
Optionalmodulesare
a)MS/MRP
b)FixedAssets
c)OracleFinancialsmodules
d)iProcurement
e)Purchasing
f)Ordermanagement
g)OracleProjects
h)PropertyManager
i)ProjectManufacturing
j)Timeandlabor
k)OracleService
PostedbyOracleOnDemandat8:54PM0comments
Labels:EnterpriseAssetManagement(eAM),SAM,VKD
Sunday,December28,2008
OracleEnterpriseAssetManagement(eAM)module-AnIntroduction
Whatareaims,objectsandbenefitsofOracleEnterpriseAssetManagement
(EAM)module?
1)Anassetisanentityforwhichuserscanreportproblems.Assetscanbe
coolingtowers,cranes,buses,buildings,conveyors,oranythingthatneedswork.
2)eAMcreatesandimplementsmaintenanceproceduresforbothassetsand
rebuildableInventoryitemsandtakescareofcomprehensiveandroutine
maintenancerequirementsofassetintensiveorganizations.Iteffectivelymaintains
assetssuchasvehicles,cranesandHVACsystemsandrotableInventoryitems
suchasmotorsandengines.
3)eAMenablesuserstooptimallyplanandschedulemaintenanceoperations
/activitieswithminimaldisruptionstoanorganizationsoperationsandproductions.
Itmeasuresperformanceandoptimizesmaintenanceoperations.Ittracksthe
performanceoftheassetsandrebuildableinventoryitemsbyusingmeters,
qualityplansandconditioningsystems.
4)Byeffectivelymonitoringoperationaldatasuchasmaintenancehistory,
performancetrends,meterreadings,andoperatingconditions,organizationscan
proactivelymanageavailableresourcessuchasinventory,equipmentandskilled
personneltomatchthemtoassetmaintenancedemand.
5)Optimizationofassetutilizations,schedulingandresourcesimprovesresource
efficiencyandenhancesmaintenancequality,maximizesresourceavailability
includingequipmentandlabor.Maintenancecostsandworkhistoryaretracked
atassetlevel.
6)OracleeAMenablesorganizationstocreateandimplementoptimaland
effectiveassetmanagementstrategiesthatcanincreaserevenueanddecrease
costs.BothPreventiveandPredictiveMaintenancestrategiesaresupportedby
eAM.Itallowsyoutocreatealternatemaintenancestrategiesforseasonalor
productioncapacitychanges.Itsupportssophisticated,condition-basedmaintenance
strategiesforproperty,plantsandpublicinfrastructure,improvesoperation
performance,andwithpreventiveandscheduledmaintenance,increasessafety,
optimizesSchedulingandresourceefficiency.
7)Iteliminatestheneedforspreadsheetsanddisparatedatarepositories,by
enablingcompaniestomanagereactive,planned,preventivemaintenance,and
adoptacentralized,proactivestrategyformanagingassetmaintenanceacrossan
enterprise.
8)OracleeAM'ssingle-instancedesignensuresbestpracticesandquality
complianceglobally,eliminatesexcessandobsoletesparepartsinventories,
promotesenvironmental,healthandsafetypolicies,smoothescoordinationof
productionandmaintenanceschedulesandimprovesboththeresponsivenessand
accuracyofcontractedmaintenance.
9)ItbridgesthegapbetweenERP/MRPsolutionsandAssetMaintenancefor
industriesthatrelyheavilyonAssetMaintenanceSystems.
10)Itisalynchpinoftheintegratedworkplaceincorporatingvisualnavigationfor
spaceplanningandallocation,multi-channelservicerequestprocessing,building
systemsmaintenanceandtechnologyassettracking.
11)eAMimprovesreturnoncapitalassetsbyintegratingphysicalwithfinancial
aspectsandsupportingdeepcollaborationbetweenprojectlifecycleandservice
lifecycleoperations.
12)ItintegratesseamlesslywithothermodulesofE-Businesssuiteandis
suitableforMetals/Mining,Manufacturing,Pulp/Paper,Petrochemicals,Facilities
andEducationandmanymoreassets.