September - D 120 P SCSSV and SSV Leak Test
September - D 120 P SCSSV and SSV Leak Test
September - D 120 P SCSSV and SSV Leak Test
WELL No.
Time
interval
W/H Pressure
05 Min. 25 05 Min. 25
10 Min. 25 10 Min. 25
15 Min. 25 15 Min. 25
20 Min. 25 20 Min. 25
25 Min. 25 25 Min. 25
30 Min. 25 30 Min. 25
Time
interval
W/H Pressure
05 Min.
25 05 Min. 25
10 Min.
25 10 Min. 25
15 Min.
25 15 Min. 25
20 Min.
25 20 Min. 25
25 Min.
25 25 Min. 25
30 Min.
25 30 Min. 25
Remarks Actions are inhibited as per SIMOPS instructions
Prior to start operation inforn control room to depresurised flow line
SCSSV and SSV are hodling well and no leak.
Performer Majid
Majid Shetty Jean Louis
D - 120 P
Obervations
Obervations
SSV LEAK TEST / HOLD TEST
Up stream Pressure
Well Shut in Pressure
53
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
RSES
53 25
Observations
Field Supervisor
25
W/H pressure
after
depresuriseing
SCSSV LEAK / HOLD TEST
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
10.09.05
Status
Flow line pressure
During test
Production Supdt.
W/H pressure
after
depresuriseing
Flow line pressure Up stream Pressure
Well Shut in Pressure During test