0% found this document useful (0 votes)
82 views1 page

Labuan SFFM Silo

The proposed repair works involved fixing cracks, spalling and defective concrete in reinforced concrete silos 1-6 for Sabah Flour and Feed Mills. Crack repair, formwork grouting and patching were used to repair the defective concrete on the roof slab, basement slab, stairwell and inside the silos caused by severe corrosion of steel reinforcement. The existing waterproofing system on the roof slab was also removed and replaced, and cleaning works were carried out on the concrete surfaces of the stairwell and silos.

Uploaded by

Kelvin Liew
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views1 page

Labuan SFFM Silo

The proposed repair works involved fixing cracks, spalling and defective concrete in reinforced concrete silos 1-6 for Sabah Flour and Feed Mills. Crack repair, formwork grouting and patching were used to repair the defective concrete on the roof slab, basement slab, stairwell and inside the silos caused by severe corrosion of steel reinforcement. The existing waterproofing system on the roof slab was also removed and replaced, and cleaning works were carried out on the concrete surfaces of the stairwell and silos.

Uploaded by

Kelvin Liew
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT TITLE: PROPOSED REPAIR WORKS TO REINFORCED

CONCRETE SILOS 1-6 FOR SABAH FLOUR AND FEED MILLS


Nature of
Problem
Cracks, spalling and defective concrete
were found on the soffit of RC roof
slab, basement slab, internal surfaces
of the stairwell and RC silos due to severe
corrosion of the steel reinforcement.
The Solution
Crack repair, formwork grouting and patching were the major scope of works to
repair the defective concrete. The eisting waterproofing s!stem to the RC roof
slab was removed and replaced. Cleaning works to the eternal concrete surface of
the stairwell and silos were also carried out.
Year 2005-2006
MALAYSIA