Ground Floor Load Schedule & Computations
Ground Floor Load Schedule & Computations
Ground Floor Load Schedule & Computations
BRANCH
LOAD DESCRIPTION
CKT. NO
LIGHTING LOAD
1
LIGHTING LOAD
2
LIGHTING LOAD
3
SMALL APP.
4
SMALL APP.
5
AIRCON
3 HP
6
AIRCON 1.5 HP
7
REFREGERATOR
8
SPARE
9
SPARE
10
TOTAL
COMPUTATIONS
I =
BRANCH
LOAD DESCRIPTION
CKT. NO
LIGHTING LOAD
1
LIGHTING LOAD
2
SMALL APP.
3
SMALL APP.
4
AIRCON 1HP
5
AIRCON 1HP
6
SPARE
7
SPARE
8
TOTAL
COMPUTATIONS
I =
NO.
OUTLET
22
12
18
6
7
1
1
2
-----
VOLTS
WATTS
AMPERES
PHASE
230
230
230
230
230
230
230
230
-----
2200
1200
1800
2160
2520
2238
1119
3000
----16237
9.57
5.22
7.83
9.39
10.96
9.73
4.87
13.04348
-----
1
1
1
1
1
1
1
1
-----
NO.
OUTLET
23
22
14
12
6
6
-----
2 # 2.0 mm TW in 13 mm C
2 # 2.0 mm TW in 13 mm C
2 # 2.0 mm TW in 13 mm C
2 # 3.5 mm TW in 13mm C
2 # 3.5 mm TW in 13mm C
2 # 3.5 mm TW in 13mm C
2 # 3.5 mm TW in 13mm C
2 # 3.5 mm TW in 13mm C
-----
WATTS
AMPERES
PHASE
230
230
230
230
230
230
-----
2300
2200
5040
4320
4476
4476
----22812
10.00
9.57
21.91
18.78
19.46
19.46
-----
1
1
1
1
1
1
-----
83.24
Amp
PROTECTION
15 AT
15 AT
15 AT
20 AT
20 AT
30 AT
30 AT
20 AT
-----
USE 2 # 38 mm TW 100 AT
59.09 Amp
VOLTS
-----
PROTECTION
15 AT
15 AT
30 AT
30 AT
30 AT
30 AT
-----
USE 2 # 50 mm TW 120AT
NO.
OUTLET
23
22
14
12
6
6
-----
VOLTS
WATTS
AMPERES
PHASE
230
230
230
230
230
230
-----
2300
2200
5040
4320
4476
4476
----22812
10.00
9.57
21.91
18.78
19.46
19.46
-----
1
1
1
1
1
1
-----
PROTECTION
15 AT
15 AT
30 AT
30 AT
30 AT
30 AT
-----
2 # 2.0 mm TW in 13 mm C
2 # 2.0 mm TW in 13 mm C
2 # 3.5 mm TW in 13mm C
2 # 3.5 mm TW in 13mm C
2 # 3.5 mm TW in 13mm C
2 # 3.5 mm TW in 13mm C
-----
USE 2 # 50 mm TW 120 AT
= 83.24 Amp
NO.
OUTLET
12
11
2
1
-----
VOLTS
WATTS
AMPERES
PHASE
230
230
230
230
-----
1200
1100
720
1119
----4139
5.22
4.78
3.13
4.87
-----
1
1
1
1
-----
= 15.37 Amp
PROTECTION
2 # 2.0 mm TW in 13 mm C
2 # 2.0 mm TW in 13 mm C
2 # 3.5 mm TW in 13mm C
2 # 3.5 mm TW in 13mm C
----USE 2 # 8.0 mm TW 30 AT
15 AT
15 AT
20 AT
30 AT
-----