SITE FOLDER
SITE NAME:
NEMAM
SITE ADDRESS:
MR.R.GOPALAKRISHNAN S/O RAMARAJ
NEMAN, TALUKA-THIRUKKATTUPPALLI
THANJAVUR , PH:-9976714935
INDEX
Department: NSN SITE
ENGINEERING
Prepared By: Site
Engineering India
Approved By: K.M.Zeegham
Client: VODAFONE Date : 03/04/07 Page: 1
1 SARF 2
2 SITE ACQUISITION & HANDOVER
DOCUMENTS FOR SITE DEVELOPMENT
3-4
3 CIVIL WORKS 5-1
4 ELECTRICAL RECOMMENDATIONS 11-13
5 INFRA CHECKLIST! RFI" 14-15
# ANTENNA & FEEDER INFORMATION 1#
$ BTS INSTALLATION CHECKS 1$-1%
% POWER S&STEM INFORMATION 1'
' MW INSTALLATION CHECKS 2-21
1 CERTIFICATE ( TI 22
11 INVENTOR& REPORT 23
12 SITE HANDOVER DETAIL 24
13 OUT STANDIN) TASKS 25
Department: NSN SITE
ENGINEERING
Prepared By: Site Engineering
India
Approved By: K.M.Zeegham Client: VODAFONE Date: 03/04/07 Page: 2
1* SEARCH AREA REQUEST FORM !SARF":
)ENERAL DETAILS: DATE:
SITE NAME
NEMAM
SITE ID TN1934
!TS T"PE INDOORD OUTDOOR MI#RO
LATITUDE: LONGITUDE:
LINE O$ SITE %LOS&
#LEAR
NOT
#LEAR
NOT
#HE#KED
NOT RE'UIRED
#ONNI#TIVIT" T"PE M( LEASE LINE
E1 SHARED (ITH OPERATOR AIRTEL IDEA !SNL OTHER)))))
E'UIPMENT INSTALLED !TS !S# SDH ))))))))))))
HT O$ GSM ANTENNA %*& SE#1: 4 SE#+: 4
SE#3: 4
SE#4)))))
GSM ANT. ORIENTATION
%DEG&
SE#1: + SE#+: 13 SE#3: +1 SE#4)))))
M( ANT HEIGHT%*& DIR1: +, DIR+: +, DIR3)))))) OTHER)))))
SI-E O$ M( ANTENNA DIR1: .6 DIR+: .6 DIR3))))))) OTHER)))))
M( ANT ORIENTATION
%DEG&
DIR1: 175.+ DIR+: 355.+ DIR3))))))) OTHER)))))
PROPOSED TO(ER/ POLE TO(ER POLE
HEIGHT O$ TO(ER/ POLE%*&
NEAREST PO(ER $EED
$ROM SITE
%.M/KM&
T"PE O$ PO(ER AVAILA!LE SINGLE PHASE THREE PHASE
PROPOSED SITE LA"OUT
ATTA#HED&
"ES NO
EARTH PITS SHO(N IN
LA"OUT
P1 P+ P3
METER !O/ LO#ATION !1 !+ !3
NAME AND SIGNATURE NAME AND SIGNATURE
O$ SITE A#'UISITION PERSON O$ R$ ENGINEER
.
Department: NSN SITE
ENGINEERING
Prepared By: Site Engineering
India
Approved By: K.M.Zeegham Client: VODAFONE Date: 03/04/07 Page: 3
#* ANTENNA AND FEEDER S&STEM INFORMATION
#*1 DETAILED INFORMATION ABOUT ANTENNAS AND FEEDERS
ITEM SEC-1 SEC-2 SEC-3
DIVERSIT&
MECHANICAL
TILTIN) AN)LE
!D)R"
T//R/
+
2 2
ELECTRICAL
TILTIN) AN)LE
!D)R"
T//R/
2 2 2
+UMPER
CABLES
USED! ,-. 1*5M"
T// R/
E/TERNAL
3*0 + 3*0+ 3*0+
T//R/ INTERNAL
1.5*0+ 1.5*0+ 1.5*0+
EARTHIN) KITS
USED
'T"
4 4 4
FEEDER CABLE
MARKIN) PER
SECTOR
'T"
"12 "12 "12
#*2 ANTENNALINE CHECKS PRIOR TO BTS COMMISSIONIN)
REF* IMPLEMENTATION PHASE COMPLETED
4.3.1. ALL #A!LES ARE RESTORED TO NORMAL POSITION $OR !TS
OPERATION A$TER VS(R/ RL/ DT$ #HE#KS.
4.3.+. ALL #ONNE#TORS ARE PROPERL" TIGHTENED.
4.3.3. ALL E/TERNAL #ONNE#TORS ARE SEALED AND THE" ARE
(EATHERPROO$.
4.3.4 VS(R/ RL/ DT$ #HE#K RESULTS ATTA#HED%SE#TOR(ISE&
A##EPTED !":
%DATE&
%NOKIA3S REPRESENTATIVE& %SIGNATURE&
Department: NSN SITE
ENGINEERING
Prepared By: Site Engineering
India
Approved By: K.M.Zeegham Client: VODAFONE Date: 03/04/07 Page: 4
$* BTS INSTALLATION CHECKS
ITEM DESCRIPTION CHECKED
1 #A!INET $I/ED TO (ALL/$LOOR, SE#URED
AND $EET ADJUSTED 4 LEVELED.
+ INTERNAL #A!LE LADER INSTALED PROPER".
3 #A!LE LADERS % INT. 4 E/T. & EARTHED
PROPERL" 4 #ONNE#TED TO EARTH
#OLLE#TING !ARS % EG! 4 IG! & $OR
E'UIPOTENTIAL !ONDING.
4 (T$ INSTALLED PROPERL" 4 ALL THE HOLES
ARE SEALED.