Sched L 65432
Sched L 65432
Sched L 65432
exe
===============================================
Default Project..................................................H3/H4 [
CL8]R2
Projects:
H3/H4 [CL8]R2...................................................
.H3 & H4 RACE DAY HOTELS - CROWNE PLAZA & STAYBRIDGE
Scheduling/Leveling Settings:
-----------------------------
General
-------
Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retaine
d Logic
Calculate start-to-start lag from ...............................Early S
tart
Define critical activities as Total Float less than or equal to .50
Compute Total Float As ..........................................Finish
Float
Calculate float based on finish date of .........................Each pr
oject
Calendar for scheduling Relationship Lag ........................Predece
ssor Activity Calendar
Advanced
--------
Calculate multiple float paths...................................No
Statistics:
-----------
# Projects.......................................................1
# Activities.....................................................1690
# Not Started....................................................1690
# In Progress....................................................0
# Completed......................................................0
# Relationships..................................................3260
# Activities with Constraint.....................................76
Project: H3/H4 [CL8]R2 Activity: A1000 Level 3
FOH areas - Design Delivery
Project: H3/H4 [CL8]R2 Activity: A1001 Level 4
FOH areas - Design Delivery
Project: H3/H4 [CL8]R2 Activity: A1002 Executiv
e Lounges - 12th Floor - Design Delivery
Project: H3/H4 [CL8]R2 Activity: C_INFO_M01
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: C_INFO_M02
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: C_INFO_M03
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: C_INFO_M04
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: C_INFO_M05
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: C_INFO_S01
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: C_INFO_S02
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: C_INFO_S03
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: C_INFO_S04
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: C_INFO_S05
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: DES-CEI Fit outs
- Ceilings - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-DOR Fit outs
- Internal Doors & Ironmongery - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-ENV External
Envelope - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-FFE FF&E (BY
CLIENT) - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-FLR Fit ous
- Floors / Walls (Tiles / Stone) - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-FOF Fit outs
- Finishes - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-HRD Hard Lan
dscaping - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-KIT Commerci
al Kitchen & equipment - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-LFT Lifts &
Escalators - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-AHU
Air Handling Units - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-BUS
Bus Bar System - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-CHW
Chilled Water Pumps - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-DBS
MDB / SMDB / DB Panels - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-FCU
Fan Coil Units - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-GEN
Generators - Permanent - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-HEX
Plate Heat Exchangers - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-SWT
H.V / L.V. Switchgear - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-TRF
Transformers - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-MAS Masonry
works - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-MEP MEP Work
s - Finalise Specs
Project: H3/H4 [CL8]R2 Activity: DES-MRF Metal Ro
ofing / Cladding - Plant Rooms - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-MTL Metal wo
rks / Architectural metal works - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-OSE Operator
supplying Equiipment [BY CLIENT] - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-PLS Plasteri
ng works - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-PRT Fit outs
- Dry Wall Partitions - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-SFT Soft Lan
dscaping & Irrigation - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-SUB Woodwork
s / Subframes - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-SWM Water Fe
atures & Pool - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-THR Thermal
Protection / Roof works - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-TRN Transpor
t Systems / BMU - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-WPF Moisture
protection (wet areas) - Design Delivery
Project: H3/H4 [CL8]R2 Activity: KEY-1300
Soft Opening
Project: H3/H4 [CL8]R2 Activity: KEY-1301
Handing over FOH & BOH areas incl 2 F&B outlets
Project: H3/H4 [CL8]R2 Activity: P_INFO_M01
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: P_INFO_M02
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: P_INFO_M03
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: P_INFO_S01
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: P_INFO_S02
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: P_INFO_S03
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: PIL-C1 Handover
from Piling Subcontractor - CP 1
Project: H3/H4 [CL8]R2 Activity: PIL-C2 Handover
from Piling Subcontractor - CP 2
Project: H3/H4 [CL8]R2 Activity: PIL-C3 Handover
from Piling Subcontractor - CP 3
Project: H3/H4 [CL8]R2 Activity: PIL-C4 Handover
from Piling Subcontractor - CP 4
Project: H3/H4 [CL8]R2 Activity: PIL-P1 Handover
from Piling Subcontractor - P1
Project: H3/H4 [CL8]R2 Activity: PIL-P2 Handover
from Piling Subcontractor - P2
Project: H3/H4 [CL8]R2 Activity: PIL-P3 Handover
from Piling Subcontractor - P3
Project: H3/H4 [CL8]R2 Activity: PIL-P4 Handover
from Piling Subcontractor - P4
Project: H3/H4 [CL8]R2 Activity: PIL-P5 Handover
from Piling Subcontractor - P5
Project: H3/H4 [CL8]R2 Activity: PIL-P6 Handover
from Piling Subcontractor - P6
Project: H3/H4 [CL8]R2 Activity: PIL-S1 Handover
from Piling Subcontractor - SB 1
Project: H3/H4 [CL8]R2 Activity: PIL-S2 Handover
from Piling Subcontractor - SB 2
Project: H3/H4 [CL8]R2 Activity: S_INFO_M01
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: S_INFO_M02
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: S_INFO_M03
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: S_INFO_M04
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: S_INFO_M05
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: S_INFO_S01
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: S_INFO_S02
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: S_INFO_S03
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: S_INFO_S04
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: S_INFO_S05
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: UTIL-0010
Power from ADEWA available
Project: H3/H4 [CL8]R2 Activity: UTIL-0090
Civil Defense approval
Errors:
-------
Warnings:
---------
Activities without predecessors..................................28
Project: H3/H4 [CL8]R2 Activity: A1000 Level 3
FOH areas - Design Delivery
Project: H3/H4 [CL8]R2 Activity: A1001 Level 4
FOH areas - Design Delivery
Project: H3/H4 [CL8]R2 Activity: A1002 Executiv
e Lounges - 12th Floor - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-CEI Fit outs
- Ceilings - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-DOR Fit outs
- Internal Doors & Ironmongery - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-ENV External
Envelope - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-FFE FF&E (BY
CLIENT) - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-FLR Fit ous
- Floors / Walls (Tiles / Stone) - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-FOF Fit outs
- Finishes - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-HRD Hard Lan
dscaping - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-KIT Commerci
al Kitchen & equipment - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-LFT Lifts &
Escalators - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-SWT
H.V / L.V. Switchgear - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-TRF
Transformers - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-MAS Masonry
works - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-MEP MEP Work
s - Finalise Specs
Project: H3/H4 [CL8]R2 Activity: DES-MRF Metal Ro
ofing / Cladding - Plant Rooms - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-MTL Metal wo
rks / Architectural metal works - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-OSE Operator
supplying Equiipment [BY CLIENT] - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-PLS Plasteri
ng works - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-PRT Fit outs
- Dry Wall Partitions - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-SFT Soft Lan
dscaping & Irrigation - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-SUB Woodwork
s / Subframes - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-SWM Water Fe
atures & Pool - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-THR Thermal
Protection / Roof works - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-TRN Transpor
t Systems / BMU - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-WPF Moisture
protection (wet areas) - Design Delivery
Project: H3/H4 [CL8]R2 Activity: KEY-1000
Receipt / Acceptance of Letter of Award
Activities without successors....................................2
Project: H3/H4 [CL8]R2 Activity: HAND-030
Completion of Snagging
Project: H3/H4 [CL8]R2 Activity: KEY-1400
Final Handing over
Out-of-sequence activities.......................................0
Activities with Actual Dates > Data Date.........................0
Milestone Activities with invalid relationships..................16
Project: H3/H4 [CL8]R2 Activity: DES-MEP MEP Work
s - Finalise Specs
Project: H3/H4 [CL8]R2 Activity: HAND-010
Soft Opening
Project: H3/H4 [CL8]R2 Activity: HAND-020
Final Handing over
Project: H3/H4 [CL8]R2 Activity: KEY-1000
Receipt / Acceptance of Letter of Award
Project: H3/H4 [CL8]R2 Activity: KEY-1200
Completion of Structure
Project: H3/H4 [CL8]R2 Activity: KEY-1300
Soft Opening
Project: H3/H4 [CL8]R2 Activity: KEY-1301
Handing over FOH & BOH areas incl 2 F&B outlets
Project: H3/H4 [CL8]R2 Activity: MOB_DW_015
Termination of Dewatering at site
Project: H3/H4 [CL8]R2 Activity: UTIL-0010
Power from ADEWA available
Project: H3/H4 [CL8]R2 Activity: UTIL-0030
Water from ADEWA available
Project: H3/H4 [CL8]R2 Activity: UTIL-0040
Gas available from network
Project: H3/H4 [CL8]R2 Activity: UTIL-0050
Sewage connection operational
Project: H3/H4 [CL8]R2 Activity: UTIL-0060
Storm water connection operational
Project: H3/H4 [CL8]R2 Activity: UTIL-0070
Etisalat Connection available
Project: H3/H4 [CL8]R2 Activity: UTIL-0080
Civil Defense inspection
Project: H3/H4 [CL8]R2 Activity: UTIL-0090
Civil Defense approval
Scheduling/Leveling Results:
----------------------------
# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................1690
# Relationships with other projects..............................0
Data Date........................................................24-Dec-
07
Earliest Early Start Date........................................24-Dec-
07
Latest Early Finish Date.........................................30-Sep-
09
Exceptions:
-----------
Critical Activities..............................................887
Project: H3/H4 [CL8]R2 Activity: A1000 Level 3
FOH areas - Design Delivery
Project: H3/H4 [CL8]R2 Activity: A1001 Level 4
FOH areas - Design Delivery
Project: H3/H4 [CL8]R2 Activity: A1002 Executiv
e Lounges - 12th Floor - Design Delivery
Project: H3/H4 [CL8]R2 Activity: ACP-TRN Transpor
t Systems / BMU - Contractor's Review & Accpt of Award
Project: H3/H4 [CL8]R2 Activity: ALD-TRN Transpor
t Systems / BMU - Engineers' review & approval
Project: H3/H4 [CL8]R2 Activity: C-EXE-LFT1
Install doors / Alignment in shafts / guide rails - CP
Project: H3/H4 [CL8]R2 Activity: C-EXE-LFT2
Installation of Lifts / Vertical Transportation incl testing - CP
Project: H3/H4 [CL8]R2 Activity: C-EXE-THR
Thermal insulation, waterproofing & works on roof - CP
Project: H3/H4 [CL8]R2 Activity: C01_01B021
Backfilling incl compaction upto bottom of grade slab
Project: H3/H4 [CL8]R2 Activity: C01_01B042
Compaction & blinding for pile caps
Project: H3/H4 [CL8]R2 Activity: C01_01B061
Blockwork shutter for deep pile caps
Project: H3/H4 [CL8]R2 Activity: C01_01C041
Concrete pour for pile caps - 1st STAGE
Project: H3/H4 [CL8]R2 Activity: C01_01C042
Concrete pour for Pile caps - 2nd STAGE
Project: H3/H4 [CL8]R2 Activity: C01_01C061
Concrete for Grade Columns
Project: H3/H4 [CL8]R2 Activity: C01_01E021
General Excavation to pile head platform
Project: H3/H4 [CL8]R2 Activity: C01_01E022
Excavation for pile cap pits
Project: H3/H4 [CL8]R2 Activity: C01_01F041
Support & formwork for Pile Caps
Project: H3/H4 [CL8]R2 Activity: C01_01F061
Formwork for Grade Columns
Project: H3/H4 [CL8]R2 Activity: C01_01P021
Pile head breaking & trimming
Project: H3/H4 [CL8]R2 Activity: C01_01R041
Rebar work for pile caps - 1st STAGE
Project: H3/H4 [CL8]R2 Activity: C01_01R042
Rebar works for Pile caps - 2nd STAGE
Project: H3/H4 [CL8]R2 Activity: C01_01R061
Rebar works for Grade columns
Project: H3/H4 [CL8]R2 Activity: C01_01S021
Setting out
Project: H3/H4 [CL8]R2 Activity: C01_01W021
Preparation for pile caps
Project: H3/H4 [CL8]R2 Activity: C01_03C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_03C091
Concrete for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C01_03C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C01_03C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C01_03F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_03F091
Formwork for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C01_03F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C01_03F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C01_03R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_03R091
Rebar works for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C01_03R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C01_03R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C01_04C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_04C091
Concrete for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C01_04C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C01_04C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C01_04F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_04F091
Formwork for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C01_04F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C01_04F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C01_04R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_04R091
Rebar works for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C01_04R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C01_04R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C01_05C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_05C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C01_05C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C01_05F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_05F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C01_05F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C01_05R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_05R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C01_05R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C01_06C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_06C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C01_06C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C01_06F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_06F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C01_06F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C01_06R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_06R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C01_06R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C01_07C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_07C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C01_07C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C01_07F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_07F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C01_07F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C01_07R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_07R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C01_07R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C01_08C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_08C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C01_08C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C01_08F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_08F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C01_08F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C01_08R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_08R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C01_08R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C01_09C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_09C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C01_09C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C01_09F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_09F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C01_09F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C01_09R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_09R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C01_09R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C01_10C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_10C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C01_10C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C01_10F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_10F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C01_10F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C01_10R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_10R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C01_10R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C01_11C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_11C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C01_11C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C01_11F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_11F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C01_11F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C01_11R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_11R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C01_11R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C01_12B20C
Blockwork - corridors / common areas
Project: H3/H4 [CL8]R2 Activity: C01_12B20D
Blockwork - rooms
Project: H3/H4 [CL8]R2 Activity: C01_12C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_12C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C01_12C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C01_12F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_12F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C01_12F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C01_12R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_12R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C01_12R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C01_13B20C
Blockwork - corridors / common areas
Project: H3/H4 [CL8]R2 Activity: C01_13B20D
Blockwork - rooms
Project: H3/H4 [CL8]R2 Activity: C01_13C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_13C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C01_13C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C01_13F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_13F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C01_13F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C01_13R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_13R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C01_13R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C01_14B20C
Blockwork - corridors / common areas
Project: H3/H4 [CL8]R2 Activity: C01_14B20D
Blockwork - rooms
Project: H3/H4 [CL8]R2 Activity: C01_14C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_14C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C01_14C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C01_14C221
Rebar / Formwork & Concrete for parapet walls
Project: H3/H4 [CL8]R2 Activity: C01_14F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_14F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C01_14F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C01_14R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C01_14R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C01_14R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C02_01B021
Backfilling incl compaction upto bottom of grade slab
Project: H3/H4 [CL8]R2 Activity: C02_01B041
Compaction & blinding for pile caps
Project: H3/H4 [CL8]R2 Activity: C02_01B061
Blockwork shutter for deep pile caps
Project: H3/H4 [CL8]R2 Activity: C02_01C041
Concrete pour for pile caps - 1st STAGE
Project: H3/H4 [CL8]R2 Activity: C02_01C042
Concrete pour for Pile caps - 2nd STAGE
Project: H3/H4 [CL8]R2 Activity: C02_01C061
Concrete for Grade Columns
Project: H3/H4 [CL8]R2 Activity: C02_01E021
General Excavation to pile head platform
Project: H3/H4 [CL8]R2 Activity: C02_01E022
Excavation for pile cap pits
Project: H3/H4 [CL8]R2 Activity: C02_01F041
Support & formwork for Pile Caps
Project: H3/H4 [CL8]R2 Activity: C02_01F061
Formwork for Grade Columns
Project: H3/H4 [CL8]R2 Activity: C02_01P021
Pile head breaking & trimming
Project: H3/H4 [CL8]R2 Activity: C02_01R041
Rebar work for pile caps - 1st STAGE
Project: H3/H4 [CL8]R2 Activity: C02_01R042
Rebar works for Pile caps - 2nd STAGE
Project: H3/H4 [CL8]R2 Activity: C02_01R061
Rebar works for Grade columns
Project: H3/H4 [CL8]R2 Activity: C02_01S021
Setting out
Project: H3/H4 [CL8]R2 Activity: C02_01W021
Preparation for pile caps
Project: H3/H4 [CL8]R2 Activity: C02_03C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_03C091
Concrete for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C02_03C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C02_03C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C02_03F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_03F091
Formwork for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C02_03F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C02_03F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C02_03R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_03R091
Rebar works for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C02_03R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C02_03R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C02_04C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_04C091
Concrete for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C02_04C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C02_04C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C02_04F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_04F091
Formwork for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C02_04F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C02_04F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C02_04R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_04R091
Rebar works for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C02_04R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C02_04R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C02_05C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_05C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C02_05C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C02_05F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_05F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C02_05F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C02_05R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_05R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C02_05R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C02_06C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_06C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C02_06C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C02_06F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_06F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C02_06F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C02_06R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_06R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C02_06R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C02_07C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_07C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C02_07C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C02_07F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_07F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C02_07F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C02_07R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_07R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C02_07R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C02_08C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_08C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C02_08C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C02_08F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_08F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C02_08F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C02_08R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_08R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C02_08R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C02_09C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_09C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C02_09C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C02_09F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_09F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C02_09F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C02_09R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_09R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C02_09R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C02_10C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_10C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C02_10C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C02_10F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_10F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C02_10F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C02_10R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_10R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C02_10R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C02_11C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_11C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C02_11C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C02_11F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_11F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C02_11F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C02_11R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_11R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C02_11R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C02_12C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_12C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C02_12C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C02_12F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_12F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C02_12F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C02_12R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_12R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C02_12R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C02_13C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_13C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C02_13C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C02_13F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_13F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C02_13F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C02_13R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_13R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C02_13R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C02_14C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_14C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C02_14C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C02_14C221
Rebar / Formwork & Concrete for parapet walls
Project: H3/H4 [CL8]R2 Activity: C02_14F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_14F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C02_14F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C02_14R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C02_14R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C02_14R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C03_01B021
Backfilling incl compaction upto bottom of grade slab
Project: H3/H4 [CL8]R2 Activity: C03_01B041
Compaction & blinding for pile caps
Project: H3/H4 [CL8]R2 Activity: C03_01B061
Blockwork shutter for deep pile caps
Project: H3/H4 [CL8]R2 Activity: C03_01C041
Concrete pour for pile caps - 1st STAGE
Project: H3/H4 [CL8]R2 Activity: C03_01C042
Concrete pour for Pile caps - 2nd STAGE
Project: H3/H4 [CL8]R2 Activity: C03_01C061
Concrete for Grade Columns
Project: H3/H4 [CL8]R2 Activity: C03_01E021
General Excavation to pile head platform
Project: H3/H4 [CL8]R2 Activity: C03_01E022
Excavation for pile cap pits
Project: H3/H4 [CL8]R2 Activity: C03_01F041
Support & formwork for Pile Caps
Project: H3/H4 [CL8]R2 Activity: C03_01F061
Formwork for Grade Columns
Project: H3/H4 [CL8]R2 Activity: C03_01P021
Pile head breaking & trimming
Project: H3/H4 [CL8]R2 Activity: C03_01R041
Rebar work for pile caps - 1st STAGE
Project: H3/H4 [CL8]R2 Activity: C03_01R042
Rebar works for Pile caps - 2nd STAGE
Project: H3/H4 [CL8]R2 Activity: C03_01R061
Rebar works for Grade columns
Project: H3/H4 [CL8]R2 Activity: C03_01S021
Setting out
Project: H3/H4 [CL8]R2 Activity: C03_01W021
Preparation for pile caps
Project: H3/H4 [CL8]R2 Activity: C03_02C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_02C091
Concrete for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C03_02C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C03_02C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C03_02F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_02F091
Formwork for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C03_02F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C03_02F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C03_02R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_02R091
Rebar works for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C03_02R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C03_02R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C03_03C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_03C091
Concrete for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C03_03C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C03_03C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C03_03F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_03F091
Formwork for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C03_03F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C03_03F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C03_03R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_03R091
Rebar works for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C03_03R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C03_03R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C03_05C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_05C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C03_05C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C03_05F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_05F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C03_05F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C03_05R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_05R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C03_05R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C03_06C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_06C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C03_06C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C03_06F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_06F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C03_06F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C03_06R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_06R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C03_06R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C03_07C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_07C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C03_07C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C03_07F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_07F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C03_07F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C03_07R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_07R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C03_07R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C03_08C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_08C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C03_08C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C03_08F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_08F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C03_08F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C03_08R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_08R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C03_08R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C03_09C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_09C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C03_09C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C03_09F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_09F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C03_09F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C03_09R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_09R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C03_09R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C03_10C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_10C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C03_10C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C03_10C221
Rebar / Formwork & Concrete for parapet walls
Project: H3/H4 [CL8]R2 Activity: C03_10F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_10F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C03_10F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C03_10R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C03_10R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C03_10R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C04_01B021
Backfilling incl compaction upto bottom of grade slab
Project: H3/H4 [CL8]R2 Activity: C04_01B041
Compaction & blinding for pile caps
Project: H3/H4 [CL8]R2 Activity: C04_01B061
Blockwork shutter for deep pile caps
Project: H3/H4 [CL8]R2 Activity: C04_01C041
Concrete pour for pile caps - 1st STAGE
Project: H3/H4 [CL8]R2 Activity: C04_01C042
Concrete pour for Pile caps - 2nd STAGE
Project: H3/H4 [CL8]R2 Activity: C04_01C061
Concrete for Grade Columns
Project: H3/H4 [CL8]R2 Activity: C04_01E021
General Excavation to pile head platform
Project: H3/H4 [CL8]R2 Activity: C04_01E022
Excavation for pile cap pits
Project: H3/H4 [CL8]R2 Activity: C04_01F041
Support & formwork for Pile Caps
Project: H3/H4 [CL8]R2 Activity: C04_01F061
Formwork for Grade Columns
Project: H3/H4 [CL8]R2 Activity: C04_01P021
Pile head breaking & trimming
Project: H3/H4 [CL8]R2 Activity: C04_01R041
Rebar work for pile caps - 1st STAGE
Project: H3/H4 [CL8]R2 Activity: C04_01R042
Rebar works for Pile caps - 2nd STAGE
Project: H3/H4 [CL8]R2 Activity: C04_01R061
Rebar works for Grade columns
Project: H3/H4 [CL8]R2 Activity: C04_01S021
Setting out
Project: H3/H4 [CL8]R2 Activity: C04_01W021
Preparation for pile caps
Project: H3/H4 [CL8]R2 Activity: C04_02C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_02C091
Concrete for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C04_02C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C04_02C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C04_02F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_02F091
Formwork for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C04_02F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C04_02F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C04_02R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_02R091
Rebar works for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C04_02R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C04_02R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C04_03C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_03C091
Concrete for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C04_03C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C04_03C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C04_03F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_03F091
Formwork for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C04_03F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C04_03F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C04_03R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_03R091
Rebar works for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C04_03R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C04_03R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C04_04C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_04C091
Concrete for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C04_04C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C04_04C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C04_04F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_04F091
Formwork for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C04_04F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C04_04F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C04_04R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_04R091
Rebar works for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: C04_04R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C04_04R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C04_05C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_05C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C04_05C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C04_05F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_05F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C04_05F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C04_05R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_05R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C04_05R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C04_06C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_06C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C04_06C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C04_06F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_06F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C04_06F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C04_06R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_06R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C04_06R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C04_07C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_07C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C04_07C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C04_07F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_07F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C04_07F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C04_07R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_07R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C04_07R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C04_08C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_08C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C04_08C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C04_08F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_08F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C04_08F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C04_08R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_08R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C04_08R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C04_09C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_09C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C04_09C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C04_09F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_09F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C04_09F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C04_09R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_09R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C04_09R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C04_10C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_10C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C04_10C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C04_10F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_10F104
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C04_10F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C04_10R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_10R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C04_10R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C04_11C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_11C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C04_11C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C04_11F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_11F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C04_11F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C04_11R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_11R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C04_11R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C04_12C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_12C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C04_12C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C04_12F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_12F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C04_12F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C04_12R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_12R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C04_12R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C04_13C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_13C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: C04_13C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: C04_13F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_13F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: C04_13F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: C04_13R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: C04_13R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: C04_13R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: C04_14C221
Rebar / Formwork & Concrete for parapet walls
Project: H3/H4 [CL8]R2 Activity: C_INFO_M01
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: C_INFO_M02
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: C_INFO_M03
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: C_INFO_M04
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: C_INFO_M05
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: C_INFO_S01
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: C_INFO_S02
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: C_INFO_S03
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: C_INFO_S04
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: C_INFO_S05
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: COM-160 Loop Flu
shing & Chemical Treatment
Project: H3/H4 [CL8]R2 Activity: COM-170 System F
illing / Trial runs
Project: H3/H4 [CL8]R2 Activity: COM-180 Water Ba
lancing
Project: H3/H4 [CL8]R2 Activity: COM-185 WILD AIR
MILESTONE [WITH CLIENT SUPPLIED PERMANENT POWER]
Project: H3/H4 [CL8]R2 Activity: COM-190 Air Bala
ncing
Project: H3/H4 [CL8]R2 Activity: DES-CEI Fit outs
- Ceilings - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-DOR Fit outs
- Internal Doors & Ironmongery - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-ENV External
Envelope - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-FFE FF&E (BY
CLIENT) - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-FLR Fit ous
- Floors / Walls (Tiles / Stone) - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-FOF Fit outs
- Finishes - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-HRD Hard Lan
dscaping - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-KIT Commerci
al Kitchen & equipment - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-LFT Lifts &
Escalators - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-AHU
Air Handling Units - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-BUS
Bus Bar System - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-CHW
Chilled Water Pumps - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-DBS
MDB / SMDB / DB Panels - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-FCU
Fan Coil Units - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-GEN
Generators - Permanent - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-HEX
Plate Heat Exchangers - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-SWT
H.V / L.V. Switchgear - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-M-TRF
Transformers - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-MAS Masonry
works - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-MEP MEP Work
s - Finalise Specs
Project: H3/H4 [CL8]R2 Activity: DES-MRF Metal Ro
ofing / Cladding - Plant Rooms - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-MTL Metal wo
rks / Architectural metal works - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-OSE Operator
supplying Equiipment [BY CLIENT] - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-PLS Plasteri
ng works - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-PRT Fit outs
- Dry Wall Partitions - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-SFT Soft Lan
dscaping & Irrigation - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-SUB Woodwork
s / Subframes - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-SWM Water Fe
atures & Pool - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-THR Thermal
Protection / Roof works - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-TRN Transpor
t Systems / BMU - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DES-WPF Moisture
protection (wet areas) - Design Delivery
Project: H3/H4 [CL8]R2 Activity: DOC-TRN Transpor
t Systems / BMU - Prepare Tender Docs.
Project: H3/H4 [CL8]R2 Activity: EXE-CRD Cradle s
ystem installation
Project: H3/H4 [CL8]R2 Activity: HAND-005
Handover Soft opening areas
Project: H3/H4 [CL8]R2 Activity: HAND-010
Soft Opening
Project: H3/H4 [CL8]R2 Activity: HAND-015
Remaining works after Soft Opening / Partial Handing over of Floors
Project: H3/H4 [CL8]R2 Activity: HAND-020
Final Handing over
Project: H3/H4 [CL8]R2 Activity: HAND-030
Completion of Snagging
Project: H3/H4 [CL8]R2 Activity: ISS-TRN Transpor
t Systems / BMU - Issue of Tender bids
Project: H3/H4 [CL8]R2 Activity: KEY-1000
Receipt / Acceptance of Letter of Award
Project: H3/H4 [CL8]R2 Activity: KEY-1100
Commencement of Mobilisation works
Project: H3/H4 [CL8]R2 Activity: KEY-1150
Commencement of Construction works
Project: H3/H4 [CL8]R2 Activity: KEY-1200
Completion of Structure
Project: H3/H4 [CL8]R2 Activity: KEY-1300
Soft Opening
Project: H3/H4 [CL8]R2 Activity: KEY-1301
Handing over FOH & BOH areas incl 2 F&B outlets
Project: H3/H4 [CL8]R2 Activity: KEY-1400
Final Handing over
Project: H3/H4 [CL8]R2 Activity: MAT-TRN Transpor
t Systems / BMU - Material sub
Project: H3/H4 [CL8]R2 Activity: MOB_DW_005
Installation of Dewatering equipment
Project: H3/H4 [CL8]R2 Activity: MOB_DW_010
Commencement of Dewatering at site
Project: H3/H4 [CL8]R2 Activity: MOB_DW_015
Termination of Dewatering at site
Project: H3/H4 [CL8]R2 Activity: MOB_ES_005
Setting up Site Establishments
Project: H3/H4 [CL8]R2 Activity: NOM-TRN Transpor
t Systems / BMU - Award of Package
Project: H3/H4 [CL8]R2 Activity: P_INFO_M01
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: P_INFO_M02
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: P_INFO_M03
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: P_INFO_S01
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: P_INFO_S02
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: P_INFO_S03
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: PIL-C1 Handover
from Piling Subcontractor - CP 1
Project: H3/H4 [CL8]R2 Activity: PIL-C2 Handover
from Piling Subcontractor - CP 2
Project: H3/H4 [CL8]R2 Activity: PIL-C3 Handover
from Piling Subcontractor - CP 3
Project: H3/H4 [CL8]R2 Activity: PIL-C4 Handover
from Piling Subcontractor - CP 4
Project: H3/H4 [CL8]R2 Activity: PIL-P1 Handover
from Piling Subcontractor - P1
Project: H3/H4 [CL8]R2 Activity: PIL-P2 Handover
from Piling Subcontractor - P2
Project: H3/H4 [CL8]R2 Activity: PIL-P3 Handover
from Piling Subcontractor - P3
Project: H3/H4 [CL8]R2 Activity: PIL-P4 Handover
from Piling Subcontractor - P4
Project: H3/H4 [CL8]R2 Activity: PIL-P5 Handover
from Piling Subcontractor - P5
Project: H3/H4 [CL8]R2 Activity: PIL-P6 Handover
from Piling Subcontractor - P6
Project: H3/H4 [CL8]R2 Activity: PIL-S1 Handover
from Piling Subcontractor - SB 1
Project: H3/H4 [CL8]R2 Activity: PIL-S2 Handover
from Piling Subcontractor - SB 2
Project: H3/H4 [CL8]R2 Activity: PRC-TRN Transpor
t Systems / BMU - Procurement
Project: H3/H4 [CL8]R2 Activity: REV-TRN Transpor
t Systems / BMU - Review / Adjudicate Tender
Project: H3/H4 [CL8]R2 Activity: S-EXE-DOR
Installation of Internal Doors & Ironmongeries - SB
Project: H3/H4 [CL8]R2 Activity: S-EXE-EXT
Installation of External Envelope - SB
Project: H3/H4 [CL8]R2 Activity: S-EXE-FOF
Execution of Fit out Finishes - SB
Project: H3/H4 [CL8]R2 Activity: S-EXE-KIT
Installation of Commercial Kitchens - SB
Project: H3/H4 [CL8]R2 Activity: S-EXE-MRF
Structural Steel work / Metal roofing / Cladding - PLANT ROOMS - SB
Project: H3/H4 [CL8]R2 Activity: S-EXE-OSE
Installation of Operator Supplying Equipment - SB
Project: H3/H4 [CL8]R2 Activity: S-EXE-PLS
Internal plastering works - SB
Project: H3/H4 [CL8]R2 Activity: S-EXE-THR
Thermal insulation, waterproofing & works on roof - SB
Project: H3/H4 [CL8]R2 Activity: S00_01B201
Blockwork
Project: H3/H4 [CL8]R2 Activity: S00_02B201
Blockwork
Project: H3/H4 [CL8]R2 Activity: S01_01B021
Backfilling incl compaction upto bottom of grade slab
Project: H3/H4 [CL8]R2 Activity: S01_01B041
Compaction & blinding for pile caps
Project: H3/H4 [CL8]R2 Activity: S01_01B061
Blockwork shutter for deep pile caps
Project: H3/H4 [CL8]R2 Activity: S01_01C041
Concrete pour for pile caps - 1st STAGE
Project: H3/H4 [CL8]R2 Activity: S01_01C042
Concrete pour for Pile caps - 2nd STAGE
Project: H3/H4 [CL8]R2 Activity: S01_01C061
Concrete for Grade Columns
Project: H3/H4 [CL8]R2 Activity: S01_01C241
MEP + Rebar & Concrete for Grade Slab @ S01
Project: H3/H4 [CL8]R2 Activity: S01_01E021
General Excavation to pile head platform
Project: H3/H4 [CL8]R2 Activity: S01_01E022
Excavation for pile cap pits
Project: H3/H4 [CL8]R2 Activity: S01_01F041
Support & formwork for Pile Caps
Project: H3/H4 [CL8]R2 Activity: S01_01F061
Formwork for Grade Columns
Project: H3/H4 [CL8]R2 Activity: S01_01P021
Pile head breaking & trimming
Project: H3/H4 [CL8]R2 Activity: S01_01R041
Rebar work for pile caps - 1st STAGE
Project: H3/H4 [CL8]R2 Activity: S01_01R042
Rebar works for Pile caps - 2nd STAGE
Project: H3/H4 [CL8]R2 Activity: S01_01R061
Rebar works for Grade columns
Project: H3/H4 [CL8]R2 Activity: S01_01S021
Setting out
Project: H3/H4 [CL8]R2 Activity: S01_01W021
Preparation for pile caps
Project: H3/H4 [CL8]R2 Activity: S01_02C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_02C091
Concrete for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S01_02C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S01_02C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S01_02F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_02F091
Formwork for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S01_02F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S01_02F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S01_02R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_02R091
Rebar works for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S01_02R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S01_02R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S01_03C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_03C091
Concrete for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S01_03C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S01_03C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S01_03F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_03F091
Formwork for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S01_03F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S01_03F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S01_03R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_03R091
Rebar works for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S01_03R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S01_03R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S01_04C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_04C091
Concrete for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S01_04C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S01_04C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S01_04F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_04F091
Formwork for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S01_04F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S01_04F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S01_04R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_04R091
Rebar works for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S01_04R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S01_04R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S01_05C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_05C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S01_05C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S01_05F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_05F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S01_05F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S01_05R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_05R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S01_05R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S01_06C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_06C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S01_06C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S01_06F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_06F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S01_06F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S01_06R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_06R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S01_06R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S01_07C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_07C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S01_07C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S01_07F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_07F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S01_07F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S01_07R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_07R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S01_07R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S01_08C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_08C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S01_08C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S01_08F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_08F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S01_08F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S01_08R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_08R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S01_08R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S01_09C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_09C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S01_09C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S01_09F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_09F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S01_09F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S01_09R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_09R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S01_09R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S01_10C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_10C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S01_10C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S01_10F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_10F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S01_10F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S01_10R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_10R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S01_10R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S01_11C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_11C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S01_11C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S01_11F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_11F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S01_11F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S01_11R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_11R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S01_11R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S01_12C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_12C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S01_12C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S01_12F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_12F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S01_12F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S01_12R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_12R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S01_12R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S01_13C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_13C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S01_13C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S01_13C221
Rebar / Formwork & Concrete for parapet walls
Project: H3/H4 [CL8]R2 Activity: S01_13F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_13F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S01_13F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S01_13R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S01_13R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S01_13R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S02_01B021
Backfilling incl compaction upto bottom of grade slab
Project: H3/H4 [CL8]R2 Activity: S02_01B041
Compaction & blinding for pile caps
Project: H3/H4 [CL8]R2 Activity: S02_01B061
Blockwork shutter for deep pile caps
Project: H3/H4 [CL8]R2 Activity: S02_01C041
Concrete pour for pile caps - 1st STAGE
Project: H3/H4 [CL8]R2 Activity: S02_01C042
Concrete pour for Pile caps - 2nd STAGE
Project: H3/H4 [CL8]R2 Activity: S02_01C061
Concrete for Grade Columns
Project: H3/H4 [CL8]R2 Activity: S02_01E021
General Excavation to pile head platform
Project: H3/H4 [CL8]R2 Activity: S02_01E022
Excavation for pile cap pits
Project: H3/H4 [CL8]R2 Activity: S02_01F041
Support & formwork for Pile Caps
Project: H3/H4 [CL8]R2 Activity: S02_01F061
Formwork for Grade Columns
Project: H3/H4 [CL8]R2 Activity: S02_01P021
Pile head breaking & trimming
Project: H3/H4 [CL8]R2 Activity: S02_01R041
Rebar work for pile caps - 1st STAGE
Project: H3/H4 [CL8]R2 Activity: S02_01R042
Rebar works for Pile caps - 2nd STAGE
Project: H3/H4 [CL8]R2 Activity: S02_01R061
Rebar works for Grade columns
Project: H3/H4 [CL8]R2 Activity: S02_01S021
Setting out
Project: H3/H4 [CL8]R2 Activity: S02_01W021
Preparation for pile caps
Project: H3/H4 [CL8]R2 Activity: S02_02C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_02C091
Concrete for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S02_02C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S02_02C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S02_02F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_02F091
Formwork for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S02_02F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S02_02F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S02_02R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_02R091
Rebar works for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S02_02R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S02_02R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S02_03C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_03C091
Concrete for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S02_03C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S02_03C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S02_03F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_03F091
Formwork for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S02_03F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S02_03F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S02_03R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_03R091
Rebar works for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S02_03R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S02_03R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S02_04C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_04C091
Concrete for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S02_04C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S02_04C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S02_04F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_04F091
Formwork for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S02_04F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S02_04F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S02_04R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_04R091
Rebar works for Retaining Wall
Project: H3/H4 [CL8]R2 Activity: S02_04R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S02_04R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S02_05C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_05C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S02_05C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S02_05F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_05F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S02_05F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S02_05R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_05R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S02_05R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S02_06C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_06C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S02_06C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S02_06F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_06F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S02_06F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S02_06R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_06R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S02_06R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S02_07C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_07C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S02_07C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S02_07F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_07F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S02_07F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S02_07R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_07R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S02_07R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S02_08C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_08C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S02_08C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S02_08F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_08F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S02_08F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S02_08R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_08R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S02_08R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S02_09C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_09C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S02_09C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S02_09F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_09F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S02_09F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S02_09R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_09R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S02_09R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S02_10C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_10C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S02_10C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S02_10F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_10F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S02_10F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S02_10R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_10R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S02_10R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S02_11C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_11C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S02_11C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S02_11F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_11F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S02_11F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S02_11R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_11R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S02_11R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S02_12C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_12C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S02_12C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S02_12F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_12F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S02_12F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S02_12R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_12R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S02_12R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S02_13C081
Concreting of corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_13C101
Concreting of columns
Project: H3/H4 [CL8]R2 Activity: S02_13C151
Slab concreting
Project: H3/H4 [CL8]R2 Activity: S02_13C221
Rebar / Formwork & Concrete for parapet walls
Project: H3/H4 [CL8]R2 Activity: S02_13F081
Formwork for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_13F101
Formwork for columns
Project: H3/H4 [CL8]R2 Activity: S02_13F151
Support and formwork for slab
Project: H3/H4 [CL8]R2 Activity: S02_13R081
Rebar works for corewalls / Shearwalls
Project: H3/H4 [CL8]R2 Activity: S02_13R101
Rebar works for columns
Project: H3/H4 [CL8]R2 Activity: S02_13R151
Rebar works for slab + mep works
Project: H3/H4 [CL8]R2 Activity: S_INFO_M01
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: S_INFO_M02
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: S_INFO_M03
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: S_INFO_M04
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: S_INFO_M05
Issue of "FINAL Construction Drawings" - MEP
Project: H3/H4 [CL8]R2 Activity: S_INFO_S01
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: S_INFO_S02
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: S_INFO_S03
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: S_INFO_S04
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: S_INFO_S05
Issue of "FINAL Construction Drawings" - Structural
Project: H3/H4 [CL8]R2 Activity: SHP-TRN Transpor
t Systems / BMU - Shop drgs sub
Project: H3/H4 [CL8]R2 Activity: SUB-TRN Transpor
t Systems / BMU - Subcont.agreement
Project: H3/H4 [CL8]R2 Activity: TEN-TRN Transpor
t Systems / BMU - Tender Process
Project: H3/H4 [CL8]R2 Activity: UTIL-0010
Power from ADEWA available
Project: H3/H4 [CL8]R2 Activity: UTIL-0020
District Cooling Available
Project: H3/H4 [CL8]R2 Activity: UTIL-0090
Civil Defense approval
Activities with unsatisfied constraints..........................0
Activities with unsatisfied relationships........................0
Activities with external dates...................................0