This document discusses the calculation of a heat exchanger used to lower the temperature of methanol from 95C to 40C using coolant. It determines that the required heat transfer area is 271.5925 m2. It selects a split-ring floating head heat exchanger due to its efficiency and ease of cleaning. It calculates parameters such as the overall heat transfer coefficient, pressure drops, and selects a double pipe heat exchanger 48 feet in length to achieve the required heat transfer.

Uploaded by

Hamdan Shd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
247 views30 pages

Hitungan PP

This document discusses the calculation of a heat exchanger used to lower the temperature of methanol from 95C to 40C using coolant. It determines that the required heat transfer area is 271.5925 m2. It selects a split-ring floating head heat exchanger due to its efficiency and ease of cleaning. It calculates parameters such as the overall heat transfer coefficient, pressure drops, and selects a double pipe heat exchanger 48 feet in length to achieve the required heat transfer.

Uploaded by

Hamdan Shd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 30

PERHITUNGAN HEATER

Fungsi : Menurunkan temperatur methanol dari 95C ke 40 C


Gambar :
Fluida dingin : coolant
T1 = 25 C =
T2 = 40 C =
k = 0.59 W/m.C
viscosity = 8.00E-01 mNs/m2
Cp rata2 = 4.2 Kj/kg.C =
density = 995 kg/m3
Fluida panas : metanol
Flowrate, W2 = 100000.0000 Kg/hr =
t1 = 95 C =
t2 = 40 C =
density = 7.50E+02 Kg/m3 =
viscosity metanol = 0.34 Ns/m2
konduktivitas termal = 0.19 W/m.C
Cp rata2 = 2.84 Kj/kg.C =
1. Beban Panas Heater
Q lepas = W.Cp.dT
Q = -15620000.0000 KJ/hr =
flow steam = Q/Cp.dt
= 68.8712522 kg/H
Flowrate, W1 = 68.8713 Kg/hr
2. LMTD
T1
= 25.00
T2
= 40.00
15.00
coolant
Suhu Tinggi
Suhu Rendah
selisih
Return bend Gland
Return Head
Gland
Gland
Tee
) / ( ln
1 2
1 2
t t
t t
D D
D - D
LMTD =
= 30.7862
C
Ft = 0.85
Dt = 26.1683
C
3. T
c
= T
avg coolant
= =
t
c
= t
avg methanol
= =
Trial, Luas Perpindahan Panas
- Asumsi UD = 610.5 W/m2.C
= 2187.1773 kj/H.m2.c
A =
A = 271.5925 m2
digunakan tipe split-ring floating head, karena efisiensinya dan kemudahan dalam
pembersihan. etanol mengalir melalui tube dan steam melalui shell
.
Tubes Sizes
id = 16 mm
od = 20 mm
L = 4.83 m
tubes pass = 2
dipilih triangular pitch, 1,25od 25 mm
pitch diameter = 1.25 in
Number of Tubes
area of one tubes, a" = L x od x 3,14
= 0.303324 m2
no. Of tubes, Nt = A/a"
= 895.3872786
=
tubes passes, n = 2
tubes per passes = Nt/n
= 447.6936393
tube cross sectional area, at = (3,14 x id^2)/4
= 0.00020096 m2
area per pass = Nt/n x at
= 0.089968514 m2
) / ( ln
1 2
1 2
t t
t t
D D
D - D
t U
Q
D
D .
vol. Flow, Vw = W/(area per pass)
= 7.66E+02 kg/s m2
tube velocity, ut = Vw/density
= 9.57E+02 m/s
"laju alir antara 1 - 2 m/s, velocity yang terlalu rendah dapat menyebabkan fouling menurun"
dan membuat pressure drop naik,sehingga nilai koefisien transfer panas
dari perhitungan, didapat jumlah tubes per pass .maka digunakan shell tipe E
Koefisien transfer panas tube, hi (Bell's method)
eq. 12.28
= 1.49E+04
= 5.69E+00
L/id = 301.875
dari fig. 12.23, jh = 3.90E-06
hi = 3.81E+03 W/m2.C
tube row correction factor, Fn
tube vertical pitch, Pt' = 0,87 x 1,25 OD
= 21.75 mm
Baffle Cut Hc = % Baffle Cut x Ds
= 221.2309702 mm
height between buffle tips = Ds-2 x Hc
= 442.4619404 mm
Ncv = Height Between Buffle Tips /pt'
= 20.34307772
Dari Fig. 12.32 di dapat
Fn = 1.03
Windows Correction Factor, Fw
Hb = 187.2309702 mm Eq. 12.38
Bundle Cut = Hb/Db
= 0.229190228
= 22.91902276 %
Dari Fig. 12.41 pada Bundle Cut di atas
R'a = 0.18
Tube in one window area, Nw = Nt x R'a
= 161.1697102 Eq. 12.41
Tube In Cross Flow Area, Nc = Nt - 2Nw Eq. 12.42
= 573.0478583
Rw = 2 Nw/Nt Eq. 12.43
= 0.36
Dari Fig. 12.33 maka Fw = 1.02
Bypass Correction, Fb
Ab = 0.012034965 m2 Eq. 12.47
Ab/As = 0.384213837
Fb = 0.215056316 eq. 12.30
alpha = 4 karena aliran turbulen
sangat rendah, coba dengan 1 strip utk tiap 5 vertical rows baffle
Ns/Ncv = 1/5
Fb = 0.667547497 eq. 12.30
Leakage correction, Fl
gunakan clearances standar,
tube to baffle 1/32 in = 0.8 mm
baffle to shell 3/16 in = 4.8 mm
Atb = 18443.54532 mm2 eq. 12.45
0.018443545 m2
dari fig. 12.41 , 25%cut ob = 2.1 rads
Asb = 8877.556372 mm2
0.008877556 m2
Al = Atb + Asb
0.027321102
Al/As = 0.872220693
dari fig. 12.35, Bl = 0.52
Fl = 0.311034291 eq. 12.31
Shell Side Coeff.
hs = 6.13E-01 W/m2.C eq. 12.27
Pressure Drop pada Cross - Flow Zone, dPc
density steam = 750 kg/m3
Ideal tube bank pressure drop, dPi
dari fig. 12.36, Re = 3.70E+04
jf = 4.30E-03
koreksi viskositas diabaikan
dPt = 7.34E+02 N/m2 eq. 12.33
= 7.34E-01 kPa
= 7.34E-03 bar
"acceptable, karena dP pada stream etanol harus <0,7 bar"
karena Re > 100, alpha = 4
0.215056316
dari fig. 12.37, Fb' = 0.45
dari fig. 12.38, Bl' = 0.43
Fl' = 0.755212412
dPc = 2.49E+02 N/m2
window Zone
dari fig. 12.41, untuk baffle cut 25%
Ra = 0.19
Aw = 66190.6255 mm2 eq. 12.44
0.066190626 m2
Uw = 0.559551096 m/s
uz = 0.813396094 m/s eq. 12.36
Nwv = 8.608320469 eq. 12.40
dPw = 1342.518497 N/m2 eq. 12.34
end zone
dPe = 530.7237351 N/m2 eq. 12.36
no. Of baffles, Nb = L/pt - 1
= 12.64524143
dPs = 2.09E+04 N/m2 eq. 12.37
= 2.09E+01 kPa
= 2.09E-01 bar
= 3.04E+00 psi
dengan data tabel 12.7, dPs dalam fouled condition
dPs = 2.89E+01 kPa
2.89E-01 bar
4.19E+00 psi
acceptable, karena allowable dari dPs adalah 10 bar
Karena A < 200 ft , maka direncanakan menggunakan Double Pipe Heat Exchanger
dengan klasifikasi sebagai berikut (dari tabel 11, Kern):
IPS = 3 IPS
Sch. No = 40 inch Sch. No.
OD = 3.5 inch OD
ID = 2.953 inch ID
a'' = 0.917 ft
2
a''
ANNULUS : FLUIDA DINGIN AIR
4. Flow area, aa
D2 = 2.9530 inch =
D1 = 2.3800 inch =
aa =
= 0.0167 ft
2
Equivalent diameter, De
De =
= 0.1070 ft
5. Laju Alir Massa, Ga
Outer Pipe Inner Pipe
4 ) (
2
1
2
2
D D - p
1
2
1
2
2
) ( D D D -
Ga = W / aa
= ############## 0.0167
= 13234281.64 lb/hr ft
2
6. Reynold number, Re
pada T
avg
= 67.50
o
F
= 0.7500 cp =
Rea =
Rea = 780174.49
7. JH = 110
8. Pada Tavg = 67.50
o
F
k = 0.3620 Btu/hr ft
o
F
Cp = 1.0302 Btu/lb
o
F
=
= 1.7286
=
9.
=
= 643.3241 Btu/hr ft
2 o
F
INNER PIPE : FLUIDA PANAS PRODUK
Flow area ap
Dp = 1.969 in
ap =
= 0.1640 ft
m
a e
G x D
3 / 1
) ( k x C m
14 , 0
3
1

=
w
H o
k
Cp
D
k
j h
m
m m
4
2
D p
m
= 0.0211 ft
Laju Alir Massa, Gp
Gp = W / ap
= 0.0000 / 0.0211
= 0.0000 lb/hr ft
2
Reynold Number, Rep
Pada tavg = 32.5
o
F
= 0.3666 cp =
Rep = D.Gp /
= 0.0000
JH = 600
Pada tavg = 32.5
o
F
k = 0.67440 Btu/hr ft
o
F
cp = 0.5939 Btu/lb
o
F
= 0.9211
=
= 2272.1028 Btu/jam ft
2 o
F
hio = hi x (ID/OD)
=
= 1879.2581 Btu/jam ft
2 o
F
Clean Overall coefficient, Uc
Uc =
= 479.2597 Btu/jam ft
2 o
F
4
2
D p
3 / 1
) ( k x C m
14 , 0
3
1

=
w
H i
k
Cp
D
k
j h
m
m m
) (
) (
o io
o o i
h h
h x h
+
m
m
Design Overall, UD
1 / UD = 1 / Uc + Rd , Rd =
= 0.0041
UD = 244.7051 Btu/jam ft
2 o
F
Required Surface Area
A =
= #REF! ft
2
External surface / lin ft, a''
a'' = 0.6220 ft
Required length, L = A / a''
L = #REF!
Ambil panjang 1 harpin sepanjang = 12 ft
Banyaknya harpin yang diperlukan,
= #REF! #########
= #REF! buah
2 buah
Actual length = 48 ft
A sebenarnya = L x a''
= 29.8560 ft
2
Actual Design Overall Coeffesient, UD act
UD =
t U
Q
D
D .
t A
Q
D .
= #REF! Btu/hr ft
2 o
F
Dirt Factor, Rd
Rd =
= #REF! hr ft
2 o
F/ Btu
ANNULUS : FLUIDA DINGIN
1. De' = (D2 - D1)
= 0.0478 ft
Rea' = 348174.6272
f =
= 0.0047
= 59.43 lb/ft
3
2. Fa =
PRESSURE DROP
D c
D c
U x U
U U -
42 , 0
) (Re
264 , 0
0035 , 0
a
+
e
D g
L Ga f
. . 2
. . . 4
2
2
r
r
= 1130.9761 ft
3. Va = Ga / (3600 . )
= 61.8575 ft/det
F1 =
= 178.2459 ft
4. Pa =
= 540.3269 psi
INNER PIPE : FLUIDA PANAS
1. Rep = 0
f =
= #DIV/0!
= 42.3000 lb/ft
3
2. Fp =
= #DIV/0!
3. Pp =
( 1)
144
Fa F x r D+D
42 , 0
) (Re
264 , 0
0035 , 0
p
+
D g
L Gp f
. . 2
. . . 4
2
2
r
.
144
Fp r D
r
r
2
3
2
V
x
g



= #DIV/0!
643.3241
Uc =
UD =
RD calculated =
RD required =
540.3269
10.0000
SUMMARY
h outside
P Calculated (psi)
P Allowable (psi)
77.00 F
104.00 F
0.0127637 btu/lb.F
220462.0000 lb/hr
203.00 F
104.00 F
0.008630692 btu/lb.F
4338.888889 kW
Selisih
t
2
= 40.0 15.0
t
1
= 95.0 55.00
-55 40.00
R =
= 3.667
metanol
Return bend Gland
Return Head
Gland
Gland
Tee
1 2
2 1
t t
T T
-
-
S =
= 0.21428571
32.50
oC
67.50
oC
tabel 12.1 Coulson
digunakan tipe split-ring floating head, karena efisiensinya dan kemudahan dalam
Bundle & Shell Diameter
dari tabel 12.4 Coulson untuk tube 2 passes
K1 = 0.249
n1 = 2.207
bundle diameter, Db = 816.9238808 mm eq. 12.3b
= 0.816923881 m
dari fig. 12.10 untuk split-ring floating head
shell bundle C' = 68 mm
Ds = 884.9238808 mm
= 0.884923881 m
baffle space (trial) = Ds/5
= 176.9847762 mm
baffle pitch = 353.9695523 mm
As = 0.031323611 m2 eq. 12.21
Gs, mass flowrate = 886.7999856 kg/s.m2
de = 14.201
us = 1.182399981 m/s
= 3.70E+04
dari fig. 12.31, jh = 3.30E-03
1 1
1 2
t T
t t
-
-
= 5.08E+00
koef. Transfer panas utk cross flow area ideal tube bank
hoc = 2.81E+00 W/m.C
"laju alir antara 1 - 2 m/s, velocity yang terlalu rendah dapat menyebabkan fouling menurun"
koefisien transfer panas shell (Bell's method)
Ideal bank coefficeint, hoc
baffle pitch
Karena A < 200 ft , maka direncanakan menggunakan Double Pipe Heat Exchanger
= 2
= 80 inch
= 2.38 inch
= 1.9685 inch
= 0.622 ft
2

0.2461 ft
0.1983 ft
Inner Pipe
0.345223255 (Fig.4 Kern)
1.8150 lb/hr ft
(Fig.24 Kern)
(Tabel.5 Kern)
0.8872 lb/hr ft
(fig.24 Kern)
0.002
(Tabel.11 Kern)
(Fg. 6.4 Kern.)
100.4
PRESSURE DROP
1879.2581
479.2597
#REF!
#REF!
0.0020
#DIV/0!
10.0000
SUMMARY
h outside
P Calculated (psi)
P Allowable (psi)
Shell Side Coeff.
tanpa koreksi viskositas
koefisien transfer panas shell (Bell's method)
Ideal bank coefficeint, hoc
= 0,8Ds
= 707.9391 mm