Procurement Roof Equipment Schedule: SN# Description Planned Delivery Actual Delivery Hvac - Bader Al Mulla

This document contains a schedule listing various equipment items to be delivered for a construction project including basement package units, ground package units, an ATM package unit, first floor package units, a simplex pump, sand filter, GRP tank, fire booster pump, fire pumps, generator, plumbing and firefighting equipment from Sinnemar Co., and HVAC equipment from Bader Al Mulla. The schedule includes planned and actual delivery dates for each item.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views1 page

Procurement Roof Equipment Schedule: SN# Description Planned Delivery Actual Delivery Hvac - Bader Al Mulla

This document contains a schedule listing various equipment items to be delivered for a construction project including basement package units, ground package units, an ATM package unit, first floor package units, a simplex pump, sand filter, GRP tank, fire booster pump, fire pumps, generator, plumbing and firefighting equipment from Sinnemar Co., and HVAC equipment from Bader Al Mulla. The schedule includes planned and actual delivery dates for each item.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

SN # DESCRIPTION

PLANNED
DELIVERY
ACTUAL
DELIVERY
1 BASEMENT PACKAGE UNIT 1
2 BASEMENT PACKAGE UNIT 2
3 GROUND PACKAGE unit 1
4 ground package unit 2
5 atm package unit
6 first floor package unit 1
7 first floor package unit 2
8 first floor package unit 3
1 simplex pump
2 sand filter
3 g r p tank 06.07.2014
4 fire booster pump 01.07.2014
5 fire pumps
1 generator
pl & ff - sinnemar co.
aub
procurement
ROOF EQUIPMENT SCHEDULE
hvac - bader al mulla