Annex Ure IV Special Instructions To Tender Ers

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

Engineering

Services
PNC
SPECIAL INSTRUCTIONS TO
TENDERERS
RPNC101660

SHEET NO. 1
ANNEXURE -IV

DATE
August 1, 2014




Engineering Services
PNC

SPECIAL INSTRUCTIONS TO
TENDERERS


SPECIAL
INSTRUCTION

REV



0














SPECIAL INSTRUCTIONS TO TENDERERS
Annexure-IV


























Engineering
Services
PNC
SPECIAL INSTRUCTIONS TO
TENDERERS
RPNC101660

SHEET NO. 2
ANNEXURE -IV

DATE
August 1, 2014




Engineering Services
PNC

SPECIAL INSTRUCTIONS TO
TENDERERS


SPECIAL
INSTRUCTION

REV



0

THIS SHEET SHALL BE SIGNED, STAMPED & SUBMITTED WITH THE TENDER. TENDERS
NOT CONTAINING THIS SHEET SHALL BE REJECTED WITHOUT FURTHER INTIMATION.

1. ALL SAFETY PRECAUTIONS SHALL BE ENSURED WHILE DOING THE JOB AS PER SAFETY
RULES AND REGULATIONS.

2. SUPPLY & INSTALLATION OF ERECTION BOLTS ARE IN VENDORS SCOPE.

3. All MATERIALS INCLUDING CEMENT,REINFORCEMENT & STRUCTURAL STEEL ETC. SHALL
BE SUPPLIED BY THE AGENCY AT HIS OWN COST .

.
4. THE CONTRACTOR SHALL SUBMIT NECESSARY TEST CERTIFICATES/DOCUMENTS FOR
VERIFICATION TO THE ENGINEER-IN-CHARGE FOR THE MATERIALS SUPPLIED BY THEM AS
PER RELEVENT IS CODE.

5. THE CONTRACTOR SHALL SUBMIT IMMEDIATELY THE EXECUTION PLAN TO THE ENGINEER-
IN-CHARGE FOR COMPLETING THE JOB WITHIN THE STIPULATED TIME AS PER LOA IN ALL
RESPECTS.

6. CPWD SPECIFICATIONS AND RELEVANT IS CODES TO BE FOLLOWED FOR ALL CIVIL
WORKS.

7. THE CONTRACTOR TO ENSURE MECHANIZED METHOD OF WORKING FOR THE TOTAL JOB
AND ARRANGE FOR THE EQUIPMENTS REQUIRED TO BE COMPLETE THE JOB I.E. CONCRETE
MIXER, CONCRETE VIBRATOR, WELDING MACHINES ETC.

8. THE CONTRACTOR TO PROVIDE THE BARRICADING, WORK IN PROGRESS SIGN BOARD ON
BOTH THE ENDS OF THE ROAD, NIGHT WATCHMAN ETC. AND ENSURE SMOOTH FLOW OF
TRAFFIC DURING EXECUTION.

9. ALL THE LEVELLING AND SURVEYING WORKS ARE TO BE DONE BY THE PARTY AND TRUE
LINE AND LEVELS TO BE MAINTAINED AS PER SITE CONDITIONS.

10. THE SCHEMATIC DRAWINGP/PLAN HAVE BEEN EVOLVED TENTATIVELY BASED ON
INFORMATION AVAILABLE WITH OWNER BUT THE DIMENSIONS AND DETAILS ETC. ARE
LIABLE TO CHANGE AS PER SITE REQUIREMENTS. THE TENDERERS SHALL NOT BE
ENTITLED TO CLAIM ANY HIGHER RATE OR COMPENSATION ON THIS ACCOUNT. THE
TENDER DRAWINGS ARE INTENDED MAINLY TO GIVE AN INDICATION OF THE PROBABLE
TYPE OF WORK/CONSTRUCTION.

11. OWNER RESERVES THE RIGHT TO CHANGE / MODIFY THE SIZE AND TYPE OF SECTIONS AT
ANY TIME. OWNER DOES NOT GUARANTEE WORK UNDER EACH ITEM OF THE SCHEDULE OF
QUANTITIES.

12. PAYMENTS ON BILLS SHALL BE MADE ON ACTUAL MEASUREMENTS OF QUANTITIES OF
WORK DONE AS PER APPROVED DRAWINGS. UNLESS OTHERWISE SPECIFIED
MEASUREMENTS OF QUANTITIES SHALL BE TAKEN AS PER INDIAN STANDARDS IS: 1200.


Engineering
Services
PNC
SPECIAL INSTRUCTIONS TO
TENDERERS
RPNC101660

SHEET NO. 3
ANNEXURE -IV

DATE
August 1, 2014




Engineering Services
PNC

SPECIAL INSTRUCTIONS TO
TENDERERS


SPECIAL
INSTRUCTION

REV



0

13. BEFORE COMMENCING THE WORK, THE CONTRACTOR SHALL AT HIS OWN COST AND
INITIATIVE PROVIDE ALL NECESSARY REFERENCES, LEVEL POSTS, PEGS, BAMBOOS, FLAGS,
RANGING RODS, STRINGS AND OTHER MATERIALS FOR PROPER LAYOUT OF THE WORK IN
ACCORDANCE WITH THE SCHEME FOR FIXING BENCH MARKS ACCEPTABLE TO THE
ENGINEER-IN-CHARGE.

14. NO WORK SHALL BE STARTED UNTIL ALL THESE POINTS ARE APPROVED BY THE ENGINEER-
IN-CHARGE IN WRITING. BUT SUCH APPROVAL SHALL NOT RELIEVE THE CONTRACTOR OF
ANY OF HIS RESPONSIBILITIES IN RESPECT OF THE ADEQUACY OR ACCURACY, THEREOF.
THE CONTRACTOR SHALL ALSO PROVIDE ALL LABOUR, MATERIAL AND OTHER FACILITIES
NECESSARY FOR THE PROPER CHECKING OF LAYOUT AND INSPECTION OF THE POINTS
DURING CONSTRUCTION.

15. THE CONTRACTOR SHALL AT ALL TIMES DURING THE PROGRESS AND CONTINUANCE OF
THE WORKS BE RESPONSIBLE FOR AND EFFECTUALLY MAINTAIN AND UPHOLD IN GOOD,
SUBSTANTIAL, SOUND AND PERFECT CONDITION OF ALL / AND EVERY PART OF WORKS AND
SHALL MAKE GOOD FROM TIME TO TIME AND AT ALL TIMES AS OFTEN AS THE ENGINEER-
IN-CHARGE SHALL REQUIRE ANY DAMAGE OR DEFECT THAT MAY DURING THE ABOVE
PERIOD ARISE IN OR BE ANY WAY CONNECTED WITH WORKS.

16. THE CONTRACTOR SHALL MAINTAIN ADEQUATE DRAINAGE FACILITIES AT THE WORK SITE
AT ALL TIMES DURING THE EXECUTION OF THE WORK.

17. NO COMPENSATION SHALL BE MADE BY THE OWNER FOR ANY DAMAGE DONE BY RAIN OR
TRAFFIC DURING THE EXECUTION OF THE WORK.

18. FOR DETAILS OF WORKS, MATERIALS AND WORKMANSHIP, ATTENTION IS INVITED TO THE
SCHEDULE OF RATES, SCOPE DRAWINGS, SPECIAL CONDITIONS OF CONTRACT,
MATERIALS AND JOB SPECIFICATIONS, THIS SECTION, ETC. AND THE TENDERERS MUST
QUOTE THE RATES KEEPING IN FULL VIEW THE REQUIREMENT OF THE SAID DOCUMENTS.

19. EXCEPT OTHERWISE CLEARLY STATED, CPWD SPECIFICATIONS WITH CORRECTION SLIPS
(LATEST) SHALL BE FOLLOWED IN ALL CIVIL, STRUCTURAL AND OTHER ALLIED WORKS
AND IN ABSENCE OF CPWD SPECIFICATIONS FOR ANY WORK, RELEVANT INDIAN STANDARD
CODES OF PRACTICES (LATEST) SHALL BE FOLLOWED. WHERE THERE IS NO SPECIFICATIONS
AVAILABLE FOR ANY WORK EITHER IN CPWD SPECIFICATIONS OR IN IS CODES OF
PRACTICES, THE WORK SHALL BE CARRIED OUT AS PER THE DIRECTION OF ENGINEER-IN-
CHARGE.

20. ANY MATERIALS /ACESSORIES / FITTINGS ETC. WHICH MAY NOT BE SPECIFICALLY
MENTIONED IN THE DESCRIPTION OF ITEMS BUT WHICH ARE NORMALLY USED , NECESSARY
ARE TO BE PROVIDED BY THE CONTRACTOR WITHOUT ANY EXTRA COST TO OWNER /
CONSULTANT AND THE WORK MUST BE COMPLETED IN ALL RESPECTS.

21. THE SUPPLY / PROCUREMENT OF ALL MATERIALS, REQUIRED FOR THE JOB, SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISE STATED IN THE SCHEDULE OF
RATES AND ELSEWHERE IN THE TENDER DOCUMENTS. THE QUALITY OF THE MATERIALS
PROCURED BY THE CONTRACTOR SHALL BE SUBJECT TO THE APPROVAL OF ENGINEER-IN-
CHARGE OR HIS AUTHORISED REPRESENTATIVE BEFORE THE MATERIALS ARE ALLOWED TO
BE USED IN THE WORKS. ALL THE MATERIALS TO BE PROCURED BY THE CONTRACTOR

Engineering
Services
PNC
SPECIAL INSTRUCTIONS TO
TENDERERS
RPNC101660

SHEET NO. 4
ANNEXURE -IV

DATE
August 1, 2014




Engineering Services
PNC

SPECIAL INSTRUCTIONS TO
TENDERERS


SPECIAL
INSTRUCTION

REV



0

SHALL BE IN CONFORMITY WITH THE CPWD SPECIFICATIONS WITH CORRECTION SLIPS
(LATEST) AND IN ABSENCE OF WHICH AS LAID DOWN IN THE RELEVANT INDIAN STANDARD
CODES OF PRACTICES (LATEST).

22. THE ENGINEER-IN-CHARGE SHALL DETERMINE THE SUITABILITY OF MATERIALS TO BE
USED ON THE JOB AND THE CONTRACTOR SHALL GET ALL MATERIALS APPROVED BY
THE ENGINEER-IN-CHARGE. ANY MATERIAL PROCURED AND BROUGHT TO SITE BY THE
CONTRACTOR, FOUND NOT TO CONFORM TO THE SPECIFICATIONS AND DOES NOT MEET
THE APPROVAL OF THE ENGINEER-IN-CHARGE, FOR USE, WILL BE REJECTED AND THE
CONTRACTOR SHALL REMOVE AND DISPOSE OFF THE SAME AT HIS OWN COST AND HE
SHALL NOT HAVE ANY CLAIM FOR COMPENSATION IN THIS REGARD.

23. ACCORDING TO THE NATURE AND IMPORTANCE OF WORKS, OWNER WILL DEMAND THE
CONDUCT OF TESTS ON CONCRETE AND OTHER BUILDING MATERIALS ETC. IN WHICH CASE
THE CONTRACTOR SHALL GET THE SAME DONE AT HIS OWN COST IN A LABORATORY TO BE
APPROVED BY THE OWNER.

24. EARTH WORK

A) THE PRICES FOR ALL EXCAVATIONS SHALL INCLUDE FOR REMOVING AND
CLEARING AWAY ALL SHRUBS, BUSHES, ROOTS ETC.

B) THE PRICES FOR ALL EXCAVATIONS SHALL ALSO INCLUDE FOR ALL LEVELLING
AND RAMMING FOUNDATION BEDS, TRIMMING OF SIDES AND BOTTOM, GRADING
TO PROPER LEVEL AS REQUIRED.

C) REMOVAL AND CARRYING SHALL INCLUDE FOR ALL LOADING, UNLOADING AND
HANDLING AS MAY BE NECESSARY AND ALSO ALL NECESSARY MEANS OF
TRANSPORT (MECHANICAL OR MANUAL) AS REQUIRED.

D) THE PRICES ARE ALSO TO INCLUDE REMOVAL OF WATER CAUSED BY RAIN,
SEEPAGE, SPRING DUE TO WATER TABLE OR ANY OTHER CAUSE, EITHER BY
PUMPING OR BY BAILING, THAT MAY ACCUMULATE IN THE TRENCHES,
FOUNDATIONS, PITS, ETC. IT IS LIKELY THAT THE SUBSOIL WATER MAY
ENCOUNTER DURING EXCAVATION. THE CONTRACTOR SHALL BE RESPONSIBLE TO
REMOVE ALL WATER ACCUMULATED IN TRENCHES, FOUNDATION, PITS ETC. DUE
TO SUBSOIL SEEPAGE, RAINWATER OR FROM ANY OTHER SOURCES. FOR THE
ABOVE REASONS, IF THE CONTRACTOR IS REQUIRED TO INSTALL SOME SPECIAL
TYPE OF DEWATERING SYSTEM, THE SAME SHALL BE ARRANGED BY THE
CONTRACTOR AT HIS OWN COST AND NOTHING EXTRA SHALL BE PAYABLE. THE
CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR REMOVAL OF ALL WATER FROM
THE WORKING AREA INCLUDING NECESSARY SHORING AND STRUTTING, ETC.,
WHEREVER REQUIRED, IN ORDER TO MAINTAIN SAFE WORKING CONDITION AND
GOOD ENGINEERING PRACTICE AT HIS OWN COST AND NOTHING EXTRA SHALL BE
PAID ON THIS ACCOUNT.

E) WHERE EXCAVATIONS ARE MADE IN EXCESS OF THE DEPTH REQUIRED THE
CONTRACTOR SHALL, AT HIS OWN EXPENSES, FULL UP TO THE DESIRED LEVEL
WITH LEAN CONCRETE OF NOMINAL MIX. 1:5:10 (1 CEMENT : 5 COARSE SAND : 10
GRADED STONE AGGREGATE 40 MM NOMINAL SIZE).

Engineering
Services
PNC
SPECIAL INSTRUCTIONS TO
TENDERERS
RPNC101660

SHEET NO. 5
ANNEXURE -IV

DATE
August 1, 2014




Engineering Services
PNC

SPECIAL INSTRUCTIONS TO
TENDERERS


SPECIAL
INSTRUCTION

REV



0


F) IN CASE OF HARD / DENSE SOIL, THE LAST 150 MM DEPTH OF SUCH DEPTH
SPECIFIED IN THE DRAWING OR DECIDED BY THE OWNER SHALL BE EXCAVATED
JUST PRIOR TO THE LAYING OF PLAIN CEMENT CONCRETE BED.

G) IN CASE SURPLUS EXCAVATED MATERIALS ARE TO BE DESPOSED OFF AT
DIFFERENT LEADS AS PER ITEMS IN THE SCHEDULE OF RATES THE DISTANCE FOR
SUCH DISPOSAL SHALL BE MEASURED OVER THE SHORTEST PRACTICABLE ROUTE
AS DECIDED BY ENGINEER-IN-CHARGE AND NOT NECESSARILY THE ROUTE
ACTUALLY TAKEN BY THE CONTRACTOR FOR DISPOSAL. FOR THE PURPOSE OF
MEASUREMENT OF LEAD, THE AREA EXCAVATED SHALL BE DIVIDED INTO BLOCKS
(MUTUALLY AGREED) AND FOR EACH BLOCK THE DISTANCE FROM CENTER OF THE
BLOCK TO CENTER OF DISPOSED MATERIAL PERTAINING TO THIS BLOCK SHALL BE
TAKEN.

H) FOR PAYMENT OF EARTHWORK IN FOUNDATIONS / PITS / TRENCHES, ETC. THE
EXCAVATION IN EARTHWORK VOLUME SHALL BE CALCULATED BY MULTIPLYING
THE BASE AREA AS PER THE DIMENSIONS OF MAT (LEAN) CONCRETE INDICATED IN
THE DRAWING FOR DIFFERENT FOUNDATIONS BY THE SPECIFIED DEPTH OF
EXCAVATION CONSIDERING VERTICAL CUT UP TO THE BOTTOM OF MAT CONCRETE
LEVEL FROM GROUND LEVEL. EXTRA EXCAVATION CARRIED OUT BY THE
CONTRACTOR WITH SLOPING SIDES OR WITH LARGER BASE AREA OR WITH EXTRA
DEEPENING OF TRENCHES / PITS / FOUNDATIONS, ETC. FOR WORKING
CONVENIENCE SHALL NOT BE MEASURED AND PAID FOR. THE PAYMENT FOR
BACK FILLING AND DISPOSAL OF SURPLUS EXCAVATED MATERIAL SHALL ALSO BE
MADE ON THE SAME BASIS AS THAT FOR EXCAVATION. THEREFORE EXCAVATION ,
BACK FILLING AND DISPOSAL OF SURPLUS EARTH RESULTING FROM THE
EXCAVATION OVER THE MAT CONCRETE DIMENSIONS AND FOR THE DEPTH
BEYOND BOTTOM LEVEL OF MAT CONCRETE AS INDICATED IN THE DRAWING
SHALL NOT BE PAID FOR. HOWEVER, FOR THE CASES WHERE WATERPROOFING /
ACID PROOFING IS INDICATED AS PER DRAWINGS ON OUTER SIDES, THE MODE OF
MEASUREMENT SHALL BE AS PER IS : 1200.

I) NOTHING EXTRA SHALL BE PAID FOR SORTING / SCREENING OF THE EXCAVATED
MATERIALS TO OBTAIN GOOD EARTH FOR FILLING.

J) NOTHING EXTRA SHALL BE PAID ON ACCOUNT OF ANY LIFT FOR DISPOSAL OF
EXCAVATED MATERIALS.

K) PROPER PRECAUTIONS SHALL BE TAKEN DURING THE EXCAVATIONS TO PREVENT
ANY DAMAGE TO THE EXISTING STRUCTURES, PIPES, SEWER LINES ETC. IF SUCH
DAMAGE OCCURS, THE CONTRACTOR AT HIS OWN EXPENSE SHALL RECTIFY IT.


25. PLAIN AND REINFORCED CEMENT CONCRETE WORKS

A) ALL CONCRETE SURFACES SHALL BE FINISHED TO A FAIR FACE TO GIVE SMOOTH
AND EVEN SURFACES AND NOTHING EXTRA SHALL BE PAID ON THIS ACCOUNT.


Engineering
Services
PNC
SPECIAL INSTRUCTIONS TO
TENDERERS
RPNC101660

SHEET NO. 6
ANNEXURE -IV

DATE
August 1, 2014




Engineering Services
PNC

SPECIAL INSTRUCTIONS TO
TENDERERS


SPECIAL
INSTRUCTION

REV



0

B) ALL POCKETS / HOLES ARE TO BE PROPERLY COVERED BY SUITABLE MEANS, SO
THAT DIRT, RAIN WATER ETC., SHOULD NOT ENTER THE POCKETS / HOLES ETC. NO
DEDUCTION IN R.C.C. QUANTITY SHALL BE MADE FOR POCKETS AND NOTHING
EXTRA SHALL BE PAID FOR PROVIDING POCKETS AS MENTIONED IN PARA 5.02 (C)
ABOVE.

a. THE PRICES SHALL INCLUDE FOR WORKING UP OR HACKING OF CONCRETE
SURFACE FOR PROVIDING KEYS FOR FURTHER CONCRETE WORK AND
SHALL ALSO INCLUDE ALL PLANE, REBATED OR GROOVED CONSTRUCTION
AND OTHER JOINTS.

b. ALL REINFORCED CEMENT CONCRETE USED SHALL BE OF CONTROLLED
CONCRETE WITH DESIGNED MIX AND WEIGH BATCHED CONFORMING TO
IS:456 UNLESS OTHERWISE SPECIFIED. IN ALL CONCRETE AND R.C.C. WORK,
GRADED COARSE AGGREGATE SHALL BE USED. THE DESIGN MIXES OF
CONCRETE OF DIFFERENT GRADES SHALL BE ESTABLISHED AT THE
BEGINNING OF THE WORK CONSIDERING THE REQUIRED WORKABILITY.
HOWEVER, IF BATCHING PLANT FACILITY IS NOT AVAILABLE, ONLY
NOMINAL MIX CONCRETE IS PERMISSIBLE.

c. CONCRETE ADMIXTURES FOR WORKABILITY, IF NECESSARY, MAY BE USED
IN R.C.C., IF DECIDED BY THE ENGINEER-IN-CHARGE. NO EXTRA PAYMENT
FOR MATERIAL OR MIXING ETC. , SHALL BE MADE ON THIS ACCOUNT.

d. THE PRICES SHALL INCLUDE APPLYING CEMENT SLURRY ON REINFORCED
CEMENT CONCRETE SURFACES, KEYS OF CONSTRUCTION JOINTS ETC. @
2.75 KG/SQ.M SURFACE AREA OF RECEIVING CEMENT CONCRETE
INCLUDING ROUGHENING AND PROPER CLEANING ETC., COMPLETE AS
DIRECTED BY ENGINEER -IN-CHARGE.

e. THE PRICES SHALL INCLUDE FOR PERFORMING WATER TIGHTNESS FOR ALL
WATER RETAINING R.C.C. STRUCTURE AS STIPULATED IN IS: 3370 (PART - I),
WHEREVER SPECIFIED IN THE DRAWING.

f. CEMENT TO BE USED FOR PLAIN & REINFORCED CEMENT CONCRETE AND
OTHER WORKS SHALL BE OF ORDINARY PORTLAND CEMENT CONFORMING
TO IS : 269 UNLESS OTHERWISE STATED IN THE SCHEDULE OF RATES AND
ELSEWHERE IN THIS SECTION NIT.

g. ANY CONCRETE HAVING HONEYCOMB IS NOT ACCEPTABLE AND SHALL BE
REJECTED AND REDONE AT CONTRACTORS COST.

C) REINFORCEMENT AND EMBEDMENTS

a. WASTAGE IN CUTTING WILL NOT BE PAID FOR STEEL ACTUALLY FIXED IN
POSITION ONLY WILL BE PAID BY THE LINEAR MEASUREMENT INCLUDING
HOOKS AND LAPS. LAPPING OF BARS WILL BE ALLOWED ONLY WHERE
THE REQUIRED BAR LENGTH EXCEEDS THE STANDARD LENGTHS
AVAILABLE. ALL OTHER LAPS PROVIDED, UNLESS OTHERWISE SPECIFIED

Engineering
Services
PNC
SPECIAL INSTRUCTIONS TO
TENDERERS
RPNC101660

SHEET NO. 7
ANNEXURE -IV

DATE
August 1, 2014




Engineering Services
PNC

SPECIAL INSTRUCTIONS TO
TENDERERS


SPECIAL
INSTRUCTION

REV



0

IN THE DRAWINGS, SHALL NOT BE MEASURED AND PAID FOR. WEIGHT OF
BINDING WIRE SHALL NOT BE MEASURED FOR PAYMENT.

b. BARS SHALL BE ISSUED IN LENGTHS AND IN FORMS AS AVAILABLE IN
THE STORES. NOTHING EXTRA SHALL BE PAID FOR DECOILING AND
STRAIGHTENING OF THE BARS.

c. REINFORCEMENT ARE TO BE TACK WELDED IN ADDITION TO BINDING BY
18 S.W.G. ANNEALED WIRE WHEREVER NECESSARY TO IMPROVE
EFFICIENCY OF THE JOINT.

26. SHUTTERING

A) THE PRICES FOR SHUTTERING SHALL INCLUDE FOR PROVIDING SPLAYED EDGES,
NOTCHING, CHAMFERING, ALLOWANCES FOR OVERLAPS AND PASSING AT ANGLES,
BATTENS, STRUTTING BOLTING, WEDGING, EASING, STRIKING AND REMOVING.

B) THE CONCRETE WORK SHOULD HAVE PLY WOOD / STEEL SHUTTERING AS NOT TO
REQUIRE ANY PLASTERING, AFTER STRIKING OUT THE SHUTTERING. ANY
CONCRETE HAVING HONEYCOMBED IS NOT ACCEPTABLE AND IS LIABLE TO BE
REJECTED AND REDONE AT CONTRACTORS COST.

C) THE PRICES ARE ALSO TO INCLUDE FOR ALL NECESSARY SUPPORTS, STRUTS,
BRACES, ETC., DRESSING WITH SHUTTERING COMPOUND AND / OR OTHER
APPROVED METHOD TO PREVENT ADHESION BETWEEN CONCRETE AND FORM
WORK AND ALL RAKING FOR CIRCULAR CUTTING AND WASTE.

D) THE PRICES SHALL ALSO INCLUDE FOR ALL LABOUR AND MATERIALS NECESSARY
FOR PROVIDING FORM WORK AT ALL HEIGHTS AND DEPTHS AND INCLUDING
STRIKING, DISMANTLING THE FORM WORK ASSEMBLY ETC. AFTER THE NECESSARY
STRIPPING PERIOD OF CONCRETING IS OVER AND ALSO MAKING ALL THE JOINTS IN
SHUTTERING FULLY LEAK-PROOF PROVIDING LOW DENSITY POLYTHENE SHEETS /
BITUMEN PAPER.

E) THE PRICES SHALL ALSO INCLUDE FOR FORMING DETAILED DESIGN REQUIRED FOR
THE FORM WORK AND / OR ALL OTHER SUNDRY LABOUR.

i. ALL SHUTTERING SHALL BE EITHER PLYWOOD OR STEEL SHUTTERING TO
PRODUCE PLAIN, SMOOTH AND EVEN SURFACES, WHICH WILL THUS
BE INTEGRALLY FINISHED. IF ANY IMPRESSIONS OF THE SHUTTERING
JOINTS ARE NOTICED AFTER THE STRIKING OF THE SHUTTERING, THE SAME
SHOULD BE TREATED BY RUBBING WITH CARBORUNDUM STONES AND
NOTHING EXTRA SHALL BE PAID ON THIS ACCOUNT.

F) IN CASE OF DOWEL BARS PROJECTING OUT FROM R.C.C WORKS SUCH AS COLUMNS,
BEAMS ETC., NOTHING EXTRA SHALL BE PAID FOR ANY SPECIAL PROVISION LIKE
MAKING HOLES THAT MAY BE REQUIRED TO BE LEFT IN THE FORM WORK.

27. MASONRY WORKS


Engineering
Services
PNC
SPECIAL INSTRUCTIONS TO
TENDERERS
RPNC101660

SHEET NO. 8
ANNEXURE -IV

DATE
August 1, 2014




Engineering Services
PNC

SPECIAL INSTRUCTIONS TO
TENDERERS


SPECIAL
INSTRUCTION

REV



0

i. THE PRICES FOR BRICK WORK SHALL INCLUDE THE FOLLOWING :

A) FAIR FACE OF BRICK-WORK WITH SELECTED BRICK WITH CLASS DESIGNATION
75 OR AS SPECIFIED IN THE DESCRIPTION OF RELEVANT ITEMS IN SCHEDULE
OF RATES FROM THE LOT.
B) RAKING OUT JOINTS FOR PLASTERING AND POINTING DONE AS SEPARATE
PROCESS OF FINISHING JOINTS, FLUSH AS THE WORK PROCEEDS.
C) ALL ROUGH AND / OR FAIR CUTTING AND WASTE UNLESS SPECIFICALLY
STATED OTHERWISE.
D) PLUMBING TO ANGLES.
E) PROVIDING HOLES LEFT OR FORMED FOR FIXING PIPES ETC.
F) FORMING REVEALS TO THE JAMBS, WHERE FAIR CUTTING ON EXPOSED FACE IS
NOT INVOLVED.
G) ALL MASONRY WORK SHALL BE DONE USING MORTAR WITH COARS SAND.

28. FINISHING WORKS

A) THE PRICES SHALL INCLUDE FOR WORK AT ANY HEIGHT / DEPTH AND FOR ALL
NECESSARY SCAFFOLDING ETC. AS REQUIRED.
B) THE PRICES SHALL INCLUDE FOR PROVIDING AND LAYING OF MATERIALS FOR
ALL THE ITEMS OF PLASTER AND ALSO RAKING OUT FORM KEY FOR PLASTER AND
FOR ALL WORK IN NARROW WIDTH, FORMED ANGLES, CHAMFERED EXTERNAL
ANGLES AND FOR MAKING GOOD THE FACES.

29. . FLOORS AND BASES

A) THE PRICE FOR HARD CORE SHALL INCLUDE FOR ALL LABOUR IN LAYING TO
FALLS OR CAMBER, HAND PACKING, EDGES OF HAUNCHES FORMING SPLAYED
EDGES, WATERING AND ROLLING WITH POWER DRIVEN ROLLER AND
RAMMING WHEREVER REQUIRED FOR SOLID COMPACTION.

30. NON-SHRINK GROUT

NON-SHRINK TYPE GROUT USING CEMENTITIOUS BASE MATERIAL SHALL BE FROM
APPROVED MANUFACTURER AND SHALL BE FREE FLOW TYPE. THE MINIMUM
COMPRESSIVE STRENGTH OF THE GROUT SHALL NOT BE LESS THAN 650 KG/CM2. THE
GROUT MATERIAL SHALL BE EXPANSIVE TO ENSURE THE FULL CONTACT BETWEEN THE
BASE PLATE AND GROUT. IT SHOULD NOT SHRINK DURING SETTING PROCESS. NECESSARY
FORMWORK SHALL BE USED AROUND THE PORTION TO BE GROUTED. THE WATER CEMENT
RATIO SHALL BE AS PER MANUFACTURERS SPECIFICATION AND IN NO CASE SHALL BE
MORE THAN 0.18. TO ACHIEVE THE WORKABILITY FOR THE MINIMUM HORIZONTAL FLOW
OF 1000MM, WHEN THE GROUT IS POURED FROM ONE END, NECESSARY PLASTICIZERS MAY
BE ADDED AS RECOMMENDED BY THE MANUFACTURER ONLY AND SHALL NOT BE ADDED
BY THE CONTRACTOR AT SITE IN THE READY MIX GROUT.

31. FOUNDATION BOLT

THE PARTY HAS TO SUPPLY AND INSTALL FOUNDATION BOLTS OF REQUIRED LENGTH FOR
FOUDATIONS OF COMPRESSOR, TECHNICAL STRUCTURE ETC. THE THREADING AND

Engineering
Services
PNC
SPECIAL INSTRUCTIONS TO
TENDERERS
RPNC101660

SHEET NO. 9
ANNEXURE -IV

DATE
August 1, 2014




Engineering Services
PNC

SPECIAL INSTRUCTIONS TO
TENDERERS


SPECIAL
INSTRUCTION

REV



0

TURNING OF THE BOLT HAS TO BE SONE BY CONTRATOR AS PER DRAWINGS AND
DOCUMENTS PROVIDED BY IOCL.

32. THE PRICES SHALL INCLUDE ALSO FOR WORKS AT ALL HEIGHTS AND DEPTHS.

I HAVE READ, UNDERSTOOD AND ACCEPTING THE ABOVE STATED CONDITIONS.

SIGNATURE OF THE CONTRACTOR

You might also like