Date/Timeof SMS Received From Site Incharge S.No. Site - ID Site Name Faulty Item Quantity of Modules

This document contains a log of power plant issues reported between April and July 2014. It lists 21 entries with details of the site ID, site name, faulty item, date and time the issue was reported, and other information. Common issues involved faulty power plant modules or backplanes. Site technicians and technicians from the technical team visited sites to inspect and resolve reported issues.

Uploaded by

cmtssikar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views4 pages

Date/Timeof SMS Received From Site Incharge S.No. Site - ID Site Name Faulty Item Quantity of Modules

This document contains a log of power plant issues reported between April and July 2014. It lists 21 entries with details of the site ID, site name, faulty item, date and time the issue was reported, and other information. Common issues involved faulty power plant modules or backplanes. Site technicians and technicians from the technical team visited sites to inspect and resolve reported issues.

Uploaded by

cmtssikar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

1 JAI115 Nadi Ka Phatak P/P Module 2 4.6.

14
2 JAI168 4-C Macheda P/P Module 2 4.6.14
3 JAI198 Ganesh Vihar P/P Module 2 4.6.14
4 JAI070 Dadi Ka Phatak AC Contractor faulty 7.6.14/ 09:22 pm
5 JAI172 Harmara P/P Backstrip faulty 14.6.14/ 04:48 pm
6 JAI166 VKIA Road No.6 AC Contractor faulty 16.6.14/ 08:36 pm
7 JAI166 VKIA Road No.6 P/P Module 2 19.6.14/ 10:53 am
8 JAI041 Kardhani P/P Modules 3 20.6.14/ 11:00 am
9 JAI044 Khatipura P/P Modules 3 21.6.14/ 01:58 pm
10 JAI063 Tara Nagar P/P Module 1 21.6.14/ 05:04 pm
11 JAI164 Ganesh Colony P/P Module 1 27.6.14/ 01:30 pm
12 JAI172 Harmara
P/P Modules- 50A &
Backplane faulty 2 29.6.14/ 03:10 pm
13 JAI159 Kailash Nagar P/P Module 1 04.07.14/ 08:52 am
14 JAI169
Laxminarayanpur
i P/P Module 1 08.07.14/ 03:35 pm
15 JAI167 Benad Road P/P Module 1 21.5.14/ 09:17 am
16 jai172 Harmara P/P Module 1 24.5.14/ 11:00 am
17 JAI156
Pankha Kalwar
Rd. P/P Backplane Faulty 26 April,14/ 04:50 pm
18 JAI070 Dadi Ka Phatak P/P Backplane Faulty 26 April,14/ 04:50 pm
19 JAI194
New Colony,
Murlipura P/P Backplane Faulty 26 April,14/ 04:50 pm
20 JAI168 Scheme 4-C VKIA P/P Backplane Faulty 26 April,14/ 04:50 pm
Date/Timeof SMS
received from Site
Incharge
S.No. Site_ID Site Name Faulty Item Quantity
of
modules
21 JAI167
Ramesh Ngr,
Benad Road P/P Backplane Faulty 26 April,14/ 04:50 pm
258
256
257
Not Provided by
contractor
Not Provided by
contractor
274
275
278
280
281
286
290
295
300
233
Joint Visit by TTA 3 June,14
made Module is Burnt
237
Joint Visit by TTA 3 June,14
made Module is Burnt
195
Joint Visit by TTA 3 June,14
made Back Plane Burnt
196
Joint Visit by TTA 3 June,14
made 4 Slots of Backplane
faulty/burnt
197
Joint Visit by TTA 3 June,14
made 4 Slots of Backplane
burnt
198
Joint Visit 3 June,14 made 5
Slots of Backplane burnt/faulty
Docket No. Issued Remarks
200 3.6.14 joint visit ok by tta