Additional Electrical Work
Additional Electrical Work
12.001 Trench Excavation for laying one low voltage cable depth not less than 80cm L.M 1,000 -
12.013 Laying cable HV/LV size 70mm2 L.M 1,000 -
12.036 Supply LV 4C 70mm2 XLPE/SWA/PVC Cu.Armoured cable L.M 1,000 -
12.065
Supply, Install, test and commission street lighting pole 18/20m high complete
with 4X400W HpSV/MH laterns and lamps, pile foundation,arms, cut out unit
flag holder, base plater cover, cable terminations to cutout and onward wiring
to the lanterns by flex
No 12 -
12.148
Supply, install, test and commission 4 way ligting control cabinet as per the
latest ADWEA/ADDC specs complete with energy meter and required
ADDC/ADWEA fees, foudantion excavation, backfilling, earthing and cable end
termination if incoming cable
No 1 -
ADDITIONAL ELECTRICAL WORK AT WRM- TAL MOREEB PROJECT
Rate (AED)
Sl No. BOQ Item No. UOM
Total BOQ
Qty.
Amount
AED
Remarks