TESTING: UNIT TESTING / USER MANUAL MODULE : PRODUCTION PLANNING

ENVIRONMENT
SYSTEM : SAP R/3
CLIENT : 200
UNIT TESTING SCENARIO
SCENARIO NUMBER : PP05
DESCRIPTION : Order Confir!"ion
PREPARED BY
NAME : S#ri$!n" In%o&e
TEAM : Prod'("ion P&!nnin%
DATE : )*/))/200+
APPROVED , TESTED BY
NAME : N!n#e B!-' .P/C0
DATE :
TEAM : Prod'("ion P&!nnin%
Page 1 of 11

TESTING: UNIT TESTING / USER MANUAL MODULE : PRODUCTION PLANNING
)1 Tr!n2!("ion Code/ P!"#
Enter the menu path of the transaction code, which is going to be tested by the user.
Men' P!"#
Lo%i2"i(2 3 Prod'("ion 3 S#o4 5&oor (on"ro&3 Confir!"ion 3 En"er3 5or O4er!"ion 3CO))N
Tie Ti($e"
T6Code CO))N
21 In4'" D!"!
1. Enter the Input parameters, which need to be gien by the user during the testing of this
scenario.
!. Input the a"ue for the fie"ds and then if re#uired, copy the screen shot of the input screen
after the tab"e.
Page 2 of 11

TESTING: UNIT TESTING / USER MANUAL MODULE : PRODUCTION PLANNING
21) In4'" S(reen N!e 7 Tie Ti($e" 5or Prod'("ion Order: Ini"i!& S(reen
De2(ri4"ion of "#e 5ie&d N!"'re of "#e 5ie&d V!&'e of "#e 5ie&d
$rder
%andatory En"er 8o'r Order No1 +50000))
$peration %andatory En"er 8o'r O4er!"ion No1 00)0
&ie"d $ptiona"
En"er "#e no1 i"e "#!" one /!n"
"o (onfir
'Po2"in% d!"e9 wi"" be date on which 'onfirmation wi"" be posted
9Re!2on for V!r19:the reason for deiation of 'onfirmed (uantity to P"anned (uantity.
P"ant wise reason codes are proided as )* a"ues.
c"ic+ on
O-2er;e "#e fo&&o/in% Me22!%e
Page 3 of 11

TESTING: UNIT TESTING / USER MANUAL MODULE : PRODUCTION PLANNING
Again go to the '$11, for confirmation of another operation for the same order no
If there is no further operation the system wi"" gie you the fo""owing %essage
Page 4 of 11
See the Message
Click Here

TESTING: UNIT TESTING / USER MANUAL MODULE : PRODUCTION PLANNING
5or order (onfir!"ion "#ere !re "#ree "r!n2!("ion (ode2
'$11,
-ut .'$11,. transaction code wi"" be used.
)or the materia" 3113!3////*0 1co""ector Ring2 there are )our operation.
So we need to confirm the order no 34////1! four time for the four operations for t5code '$11,
6o to CO))N
212 In4'" S(reen N!e 7 Tie Ti($e" 5or Prod'("ion Order: Ini"i!& S(reen
De2(ri4"ion of "#e 5ie&d N!"'re of "#e 5ie&d V!&'e of "#e 5ie&d
$rder %andatory
Enter the order no
34////1!
$peration %andatory Enter the operation //1/
yie"d $ptiona" Enter the no. of Item
See "#e fo&&o/in% 2(reen
Page 5 of 11

TESTING: UNIT TESTING / USER MANUAL MODULE : PRODUCTION PLANNING

Af"er #i""in% "#e en"er in !-o;e 2(reen "#e fo&&o/in% 2(reen !44e!r2
Page 6 of 11

TESTING: UNIT TESTING / USER MANUAL MODULE : PRODUCTION PLANNING
7ust Sae the fi"e 1ctr"8s2
9he fo""owing message appears on the screen
9his is on"y confirmation for the operation one
)o""ow the procedure for remaining operation
Page 7 of 11

TESTING: UNIT TESTING / USER MANUAL MODULE : PRODUCTION PLANNING
O4er!"ion 0020
21< In4'" In4'" S(reen N!e 7 Tie Ti($e" 5or Prod'("ion Order: Ini"i!& S(reen
De2(ri4"ion of "#e 5ie&d N!"'re of "#e 5ie&d V!&'e of "#e 5ie&d
$rder %andatory
Enter the order no
34////1!
$peration %andatory
Enter the operation
//!/
yie"d $ptiona" Enter the no. of Item
5o&&o/ "#e 2!e Pro(ed're for "#e o4er!"ion 00<0 , 00=0 -8 En"erin% T6(ode CO))N
Page 8 of 11

TESTING: UNIT TESTING / USER MANUAL MODULE : PRODUCTION PLANNING
)or :ast operation, p"ease se"ect fo""owing 9ab
If the confirmed order is of )inish 6ood then do the 6oods Receipt for the same product by entering
the 95code %-31 other wise ;ust chec+ the stoc+ by 95code %%-E < you wi"" obsere the #uantity is
increase by the confirmed #uantity at production storage "ocation.
A"so you can change the time < wor+ centre that is proide in the routing whi"e confirming the
order for such process p"ease see the fo""owing screen
After entering the order no. < operation ,o. =e wi"" get a"" the standard data as per the
routing data
>ere we can mention the wor+ center that is actua""y used whi"e going for the machining
process
A"so can be entered the origina" time that has been ta+en for the machining.
Page 9 of 11

TESTING: UNIT TESTING / USER MANUAL MODULE : PRODUCTION PLANNING
Aboe screen shows a"" the standard data, =hi"e fo""owing screen shows the changed data
according to the physica" process

9he actua" time may be ary fro time entered in the routing then we can change this time to
actua" time A"so same for the wor+ centre
?own 9ime is the time for which the =or+ 'entre was down. Shift tab is used to mention, in which
Shift the $rder was confirmed. In '$$IS report, Shift wise production confirmation order can be
seen.
S>I)9 a"ues are .1., .!., .3..
O'"(oe of "#e Te2"in% '2in% "#e T6(ode CO))N
12 $rder confirmation is to be done stage wise
!2 Partia" or )u"" (uantity can be confirmed.
Page 10 of 11

TESTING: UNIT TESTING / USER MANUAL MODULE : PRODUCTION PLANNING
32 9ime for the machining can be maintain as per the actua" tme
*2 Actua" wor+ center can be maintain without hanging the routing or using the production
ersion.
42 'onfirmation ,o. is generate
Page 11 of 11