JOB SAFETY ANALYSIS WORKSHEETS
JOB SAFETY ANALYSIS DATE PERMIT NO:
JOB Arc-Welding
WORK TEAM Welder
SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENTS OR HAZARDS RECOMMENDED SAFE JOB PROCEDURES
1. Raise Welding / Burning Work Permit for the
job.
Conflict with others actiities.
!. Weld work "iece using arc-welding unit. #lectric s"arks $burn%. &"atters of molten metal.
$burn% #'e injur' or arc (e'e). #lectric current leak.
&tandb' firewatcher. Wear welding gloes and
wear face shield. #nsure welding cable in good
condition.
*. +ousekee"ing. &li", tri" - fall .aintain good housekee"ing.
WHAT TO CHECK AND NOT LIMITED TO WITH REFERENCE TO APPENDIX 1 & 2 OF THE JOB SAFETY ANALYSIS SECTION OF MOGP MANUAL
EXPERIENCE YES NO YES NO
+ae 'ou done this job before/ /
Are 'ou knowledgeable with the job to be
"erformed/
/
+ae 'ou referred to technical drawing/endor
"rocedure/&&P/
/ 0s su"erision/e1"erienced assistance re2uired/ /
PPE YES NO YES NO
+ard hat/ / Work est/ /
&afet' 3lasses/ / A"ron/ /
&afet' shoes/ / 3oggle/ /
#ar "lugs/ / 4ace shield/ /
Right t'"e of gloes/ / Res"irator' "rotection/ /
&afet' harness/ /
POTENTIAL HAZARDS YES NO YES NO
&li""er' floor/ / 5ra""ed "ressure/ /
Congested area/ / Pressuri6ed e2ui"ment/essel ha6ard/ /
5ri""ing/ / 4ire/e1"losion ha6ards/ /
7erhead work/ / #sca"e route/ /
Working at height/ / &hock/electricit'/static/ /
SHWE PROJECT JSA GENERAL PROCEDURES Rev. 0
Talisman Malaysia Limited
HS&E Section
Job Safety Analysis
Doc. No: PM3-HSE-GEN-PR-F-00!
Re"ision: 0
Date: J#ne $00%
Pa&e: A''en(i) 3
&caffolding/ / Breaker rack out/ /
&ecure ladder/ / 8ale isolation/ /
+ea' load/ / 3uard rotating e2ui"ment/ /
+ammer strikes/ / Power tools ha6ards/ /
Pinch/tra" finger, hand/ / +igh noise area, double ear "rotection/ /
Back injur' ha6ard/ / &"ark/hot slag/ /
&winging object/ / Burn $heat/chemical%/ /
4alling object/ / 9ear radioactie materials/sources/ /
7thers closeb'/ / #nironmental s"ill/ /
&har" object/ / +ose connection/ /
#'e injur'/ / Wind'/ /
3rating/deck o"ening/ / :ust'/ /
Blocked drains/ /
Pre"ared b'; Reiewed b'; <<<<<<<<<<.. Closed out; =========================
SHWE PROJECT JSA GENERAL PROCEDURES Rev. 0