HP Bypass
HP Bypass
com/
HP BYPASS OPERATION`
RAISING OF STEAM PARAMETER DURING
TURBINE ROLLING
PARALLEL OPERATION WITH TURBINE ON
LOAD REJECTION
PREVENTING SAFETY VALVES OPENING
AT RAISED STEAM PRESSURES.
HPBP OPENING CRITERIA
HPBP DOWN STREAM
TEMPERATURE < 380 Deg C
CRH DRAIN POT LEVEL NOT
HIGH
CONDENSER VACUUM > -0.8 Ksc
FAST OPENING OF HP BYPASS
GENERATOR BREAKER OPENS
TURBINE LOAD SHEDDING RELAY
OPERATED
PR. COTROLLER DEVIATION HIGH
(>10%)
DEPRESSING OF FAST OPEN PUSH
BUTTON FROM UCB
BFP DISCHARGE
BD
BPE-1 BPE-2
BP-1 BP-2
MAIN STEAM LINE
CRH LINE
MAIN STEAM LINE
CRH LINE
BP
BD
BDE
BFP DISCHARGE
Injection water Pr. > 25 Ksc
Exhaust steam Pr. < 19 Ksc
Condenser Wall Temp. < 90 DegC
Condenser Vacuum > -0.8 Ksc
CEP DISCHARGE
TO CONDENSER
TO CONDENSER
HRH LINE
LBP-1 LBP-2
LBPE-2
LBPE-1
LBPE-3
LBPE-4
CEP DISCHARGE
TO CONDENSER
TO CONDENSER
HRH LINE
LBP-1 LBP-2
LBPE-2
LBPE-1
NRV
AUTO SHUT-OFF OF LP BYPASS
CONDENSER VACUUM LOW ( BACK PR. > 220 mm of Hg.)
SPRAY WATER PR. LOW (<10 Ksc)
CONDENSER WALL TEMP. HIGH ( > 90*C )
LPBP DOWN STREAM PR. HIGH ( > 19 Ksc )
ACI
FIXED
SET POINT
1
st
Stage
Throttle Pr.
FUNCTION
GENERATOR
SLIDING
SET POINT
MAX
GATE
HRH PR.
LPBP
EHC
ON / OFF
AUTO / MANUAL
SELECTOR
CONTROL OIL
SIGNAL OIL
HP-LP BYPASS CAPACITY
60% OF FULL
LOAD
CAPACITY
REHEAT PROTECTION
Turbine Trips & HP-LP bypass
does not open. It will trip the
Boiler after 5 Sec of turbine trip.
ARMING ------
200 T/Hr STEAM FLOW THROUGH
REHEATER