CHECK LIST FOR RECEIVING INSPECTION OF
MANUAL VALVES
QCIC/027
Rev-0
Acceptance Criteria
Minimum material requirements are met as specified
in the Materials standard.
The valves shall be marked in accordance with the
Project Specification / Manufacturer's Standard
Flange dimensions for steel valves shall comply with
the latest standards
Welding requirements:
a) Butt welding ends for all valve sizes shall be
prepared in accordance with ASME B16.25 for use
without a backing ring.
Vendor's standard finish or paint is acceptable for