0% found this document useful (0 votes)
79 views2 pages

Example: Fig. 1. Example of Fault Tree

The personnel department of a company was tasked with improving their ineffective employee evaluation system. They used fault tree analysis to identify ways the current system could demotivate employees. This failure analysis helped uncover areas to correct, resulting in a new system that significantly increased employee motivation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views2 pages

Example: Fig. 1. Example of Fault Tree

The personnel department of a company was tasked with improving their ineffective employee evaluation system. They used fault tree analysis to identify ways the current system could demotivate employees. This failure analysis helped uncover areas to correct, resulting in a new system that significantly increased employee motivation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Example

A company president recognized that its personnel evaluation system was not effective at
motivating its employees, and charged the personnel department with improving it. As a
part of the initial analysis of the existing system, they use FTA to identify the different
ways that the evaluation system can fail and lead to demotivation (see the illustration).
Identified failure areas were investigated further, and the new system ased on a
correction of these failures. As a result, motivation increased significantly.


Fig. 1. Example of Fault Tree

Other examples
A hospital team uses FTA to identify how incorrect prescriptions may e given
through cominations of events. They conse!uently design a system to prevent
such a disaster from happening.
An airplane parts manufacturer performs FTA as a standard part of the design
process to identify critical faults which could cause hazardous failure. Any
suse!uent failures are chec"ed against the FTA diagram to help improve the
overall process.
A !uality team in a newspaper press room uses FTA to chec" potential failures of an
improved color registration process.

You might also like