0% found this document useful (0 votes)
168 views

Program of Work

The document is a program of work for the rehabilitation of Brgy. Bunga Dam in Tacloban City, Philippines. It outlines a budget of 900,000 Philippine pesos for various activities including clearing and grubbing, installing a cofferdam, excavation, constructing a retaining wall made of concrete and reinforcing steel bars, backfilling with structural material, and administrative/supervision costs. The largest portions of the budget are allocated to constructing the retaining wall (45.44% for concrete and 28.66% for reinforcing steel bars).

Uploaded by

api-19753598
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
168 views

Program of Work

The document is a program of work for the rehabilitation of Brgy. Bunga Dam in Tacloban City, Philippines. It outlines a budget of 900,000 Philippine pesos for various activities including clearing and grubbing, installing a cofferdam, excavation, constructing a retaining wall made of concrete and reinforcing steel bars, backfilling with structural material, and administrative/supervision costs. The largest portions of the budget are allocated to constructing the retaining wall (45.44% for concrete and 28.66% for reinforcing steel bars).

Uploaded by

api-19753598
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Republic of the Philippines

Province of Leyte
Tacloban City

PROVINCIAL AGRICULTURE

PROGRAM OF WORK
Brgy. Bunga Dam Rehabilitation
Brgy. Bunga, Abuyog, Leyte
Jan. 31, 2005

ITEM/ACTIVITY Quantity Unit Unit cost Amount Percent


PhP/unit PhP
I. CLEARING & GRUBBING 185.00 sq.m. 1.10 203.50 0.02
II. COFFERDAM 51.92 m 1,565.00 81,254.80 9.03
a. Water pump 120.00 hrs 336.25 40,350.00 4.48
III. EXCAVATION 740.00 cu.m. 27.78 20,557.20 2.28
IV. RETAINING WALL
a. Concrete Class "A" 82.70 cu.m. 4,945.05 408,967.50 45.44
b. RSB 3/4" dia. 5,983.22 kg 43.11 257,936.61 28.66
b.2 RSB 3/8" dia 1,590.32 kg 45.67 72,629.91 8.07
V. STRUCTURAL BACKFILL 431.42 cu.m. 28.75 12,403.33 1.38
VI. Administrative and supervision cost L.S. 5,697.14 0.63
TOTAL PROJECT COST 900,000.00 100.00

Prepared by: Recommending Approval:

RENATO N. PAYOD
Ag. Eng'g Staff ROGELIO O. PORTULA
Checked by: Acting Provincial Agriculturist

BUENAVENTURA L. PITAO
Ag. Eng'g Div. Chief, OPA WELL V. CAPANGPANGAN
Chief, RAEG, DA-RFU-8

Approved:

LEO P. CANEDA
Regional Executive Director
DA-RFU-8