Defect Origin (j)
Phase Requirement Analysis Design Coding
Requirement 40
Analysis 10 20
Design 40 40 40
Coding 60 10 40 80
Unit testing 60 30 30 60
Integration testing 30 10 30 30
Field 5 0 6 7
Defects/phase 245 110 146 177
Product Size = 50K LOC
1 Calculate the defect removal rate for every phase
Phase Defect removal rate (per KLOC)
Requirement 0.80
Analysis 0.60
Design 2.40
Coding 3.80
Unit testing 4.00
Integration testing 2.20
Field 0.48
2 Calculate the defect injection rate for every phase
Phase Defect injection rate (per KLOC)
Requirement 4.90
Analysis 2.20
Design 2.92
Coding 3.54
Unit testing 0.40
Integration testing 0.20
Field 0.12
3 Calculate the defect escape rate for every phase
Phase Defect escape rate (per KLOC)
Requirement 4.10
Analysis 5.70
Design 6.22
Coding 5.96
Unit testing 2.36
Integration testing 0.36
4 Which phase is the most effective in removing defects?
Phase Defect Removal Effectiveness %
Requirement 16.33
Analysis 9.52
Design 27.84
Coding 38.93
Unit testing 59.88
Integration testing 82.09
Its clear from the above table that defect removal is
most effective the Integration testing phase.
5 Calculate the overall defect removal effectiveness.
96.64
6 Do you think reviews and inspections were effective? Explain.
Yes, the final product that was shipped to the customer lies in the 95%-100
able to meet the 95% bench mark. Hence we can infer that the review
ct Origin (j)
Unit Defects Fixed in
testing Integration testing Field phase
40
30
120
190
20 200
0 10 110
0 0 6 24
20 10 6 714
Formula used
Defects Fixed in phase
50K
Formula used
Defects/phase
50K
Formula used Total Defects escaped = Ti,i
Total Defects escaped Ti,i = ΣNi,j (i = i+1 to K & j = 1 toi)
50K
Formula 1 used for front end phases
Defects removed at each step * 100%
defects on step entry + defects injected in the step
Formula 2 used for back end phases
Defects removed at current phase * 100%
defects removed on current step + subsequest step
Formula used
( 1 - Defects removed at current phase * 100% )*
100
defects removed on current step + subsequest step
mer lies in the 95%-100% comfort zone. Hence the product was
n infer that the reviews and inspections where effective.