0% found this document useful (0 votes)
60 views2 pages

Program DST - Well: Total 71 Total Flow 20

The document outlines a modified isochronal test and pressure build up test plan for the RBT-B well in the Randu Blatung field. The test aims to determine reservoir fluid type, parameters, boundaries and flow capacity. It involves multiple stages of varied choke sizes and durations for gas and oil scenarios, followed by pressure build up analysis with a minimum total shut-in time of twice the total flow time. The objective is to avoid perforation plugging while optimizing choke size selection based on flowing wellhead pressure measurements where possible.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views2 pages

Program DST - Well: Total 71 Total Flow 20

The document outlines a modified isochronal test and pressure build up test plan for the RBT-B well in the Randu Blatung field. The test aims to determine reservoir fluid type, parameters, boundaries and flow capacity. It involves multiple stages of varied choke sizes and durations for gas and oil scenarios, followed by pressure build up analysis with a minimum total shut-in time of twice the total flow time. The objective is to avoid perforation plugging while optimizing choke size selection based on flowing wellhead pressure measurements where possible.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

PROGRAM DST - WELL

Company :
Field :
Well Name :
Formation / Interval : / - m (Top/Middle/Bottom Formation)
Lithology : Lime Stone
Interval :
Test : Modified Isochronal Test + Pressure Build Up
Objective : 1. Fluid Formation (gas / oil / water)
2. Reservoir Parameters (P*, PI, k, kh, kz/kr, skin, dS/dQ)
3. Reservoir Boundary
4. Flow Capacity (AOFP / Qmax)
Gas Scenario
No Choke Sizes Duration
(inch) (hours)
1 Initial Flow 1/4 to 1 2
Clean up
1)
2 Initial Shut-In shut 2 Return to Original Pressure
3 1st Flow 16/64 3 Stabilize flow
4 1st Shut-In shut 3 Shut-in BHP1
5 2nd Flow 24/64 3 Stabilize flow
6 2nd Shut-In shut 3 Shut-in BHP2
7 3rd Flow 32/64 3 Stabilize flow
8 3rd Shut-In shut 3 Shut-in BHP3
9 4th Flow 48/64 3 Stabilize flow
10 Extended Flow 32/64 6 Stabilize flowing pressure
11 Final Shut-In shut 40
Pressure build-up analysis
2)
Total 71
Total Flow 20
Oil Scenario
No.
Choke Sizes
3)
Duration
(inch) (hours)
1 Initial Flow Full 0.5
Clean up
1)
2 Initial Shut In shut 2 Return to Original Pressure
3 1st Flow 48/64" 3 Stabilize Flow
4 1st Shut In shut 3 Shut-in BHP1
5 2nd Flow 32/64" 3 Stabilize Flow
6 2nd Shut In shut 3 Shut-in BHP2
7 3rd Flow 24/64" 3 Stabilize Flow
8 Extended Flow 32/64" 6 Stabilize Flowing Pressure
9 Final Shut In shut 31
Pressure Build-Up Analysis
2)
Total 54.5
Total Flow 15.5
Notes :
1)
2)
Total shut-in time for build-up test is at least twice of total flow time.
3)
Bila laju alir kecil atau intermitten sebaiknya gunakan choke size lebih kecil.
a Bila kondisi lapangan tidak memungkinkan untuk Modified Isochronal Test maka
lakukan jenis test lain asalkan terakhir dilakukan pressure build-up test selama minimum
dua kali total flow time.
Job Sequences Objectives
Objectives Job Sequences
Waktu yang dibutuhkan tergantung kondisi aliran sumur, tujuan utama yaitu agar tidak
terjadi penyumbatan lubang perforasi. Bila memungkinkan catat Pwh untuk optimalisasi
pemilihan choke sizes.
PROGRAM DST - WELL RBT- B
Company : PERTAMINA
Field : Randu Blatung - DOH JBT
Well Name : RBT- B
Formation / Interval : Kujung / - m (Top - Formation)
Lithology : Lime Stone
Interval :
Test : Modified Isochronal Test + Pressure Build Up
Objective : 1. Fluid Formation (gas / oil / water)
2. Reservoir Parameters (P*, PI, k, kh, kz/kr, skin, dS/dQ)
3. Reservoir Boundary
4. Flow Capacity (AOFP / Qmax)
Gas Scenario
No Choke Sizes Duration
(inch) (hours)
1 Initial Flow 1/4 to 1 2
Clean up
1)
2 Initial Shut-In shut 2 Return to Original Pressure
3 1st Flow 16/64 3 Stabilize flow
4 1st Shut-In shut 3 Shut-in BHP1
5 2nd Flow 24/64 3 Stabilize flow
6 2nd Shut-In shut 3 Shut-in BHP2
7 3rd Flow 32/64 3 Stabilize flow
8 3rd Shut-In shut 3 Shut-in BHP3
9 4th Flow 48/64 3 Stabilize flow
10 Extended Flow 32/64 6 Stabilize flowing pressure
11 Final Shut-In shut 40
Pressure build-up analysis
2)
Total 71
Total Flow 20
Oil Scenario
No.
Choke Sizes
3)
Duration
(inch) (hours)
1 Initial Flow Full 0.5
Clean up
1)
2 Initial Shut In shut 2 Return to Original Pressure
3 1st Flow 48/64" 3 Stabilize Flow
4 1st Shut In shut 3 Shut-in BHP1
5 2nd Flow 32/64" 3 Stabilize Flow
6 2nd Shut In shut 3 Shut-in BHP2
7 3rd Flow 24/64" 3 Stabilize Flow
8 Extended Flow 32/64" 6 Stabilize Flowing Pressure
9 Final Shut In shut 31
Pressure Build-Up Analysis
2)
Total 54.5
Total Flow 15.5
Notes :
1)
2)
Total shut-in time for build-up test is at least twice of total flow time.
3)
Bila laju alir kecil atau intermitten sebaiknya gunakan choke size lebih kecil.
a Bila kondisi lapangan tidak memungkinkan untuk Modified Isochronal Test maka
lakukan jenis test lain asalkan terakhir dilakukan pressure build-up test selama minimum
dua kali total flow time.
Job Sequences Objectives
Objectives Job Sequences
Waktu yang dibutuhkan tergantung kondisi aliran sumur, tujuan utama yaitu agar tidak
terjadi penyumbatan lubang perforasi. Bila memungkinkan catat Pwh untuk optimalisasi
pemilihan choke sizes.

You might also like