This document is a purchase order from PT. Bumi Indo Prima to PT. Rejeki Logam Jaya for scaffolding materials and equipment for the District 8 Mixed Use Development Project Phase 2 totaling Rp8,651,500. It lists the items, quantities, unit prices, and total amounts. Payment terms require submission of delivery documents and invoices will be paid within 30 days. Health and safety standards must be followed on site.
This document is a purchase order from PT. Bumi Indo Prima to PT. Rejeki Logam Jaya for scaffolding materials and equipment for the District 8 Mixed Use Development Project Phase 2 totaling Rp8,651,500. It lists the items, quantities, unit prices, and total amounts. Payment terms require submission of delivery documents and invoices will be paid within 30 days. Health and safety standards must be followed on site.
This document is a purchase order from PT. Bumi Indo Prima to PT. Rejeki Logam Jaya for scaffolding materials and equipment for the District 8 Mixed Use Development Project Phase 2 totaling Rp8,651,500. It lists the items, quantities, unit prices, and total amounts. Payment terms require submission of delivery documents and invoices will be paid within 30 days. Health and safety standards must be followed on site.
This document is a purchase order from PT. Bumi Indo Prima to PT. Rejeki Logam Jaya for scaffolding materials and equipment for the District 8 Mixed Use Development Project Phase 2 totaling Rp8,651,500. It lists the items, quantities, unit prices, and total amounts. Payment terms require submission of delivery documents and invoices will be paid within 30 days. Health and safety standards must be followed on site.
Download as XLS, PDF, TXT or read online from Scribd
Download as xls, pdf, or txt
You are on page 1of 38
PT.
Bumi Indo Prima
Jl. Jend. Sudirman Pusat Niaga Jakarta PO No. : 1400397 Telp/Fax : 021 - 7452196 Up. Ibu Asih ( 083897723673 ) Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 5000 liter Solar 9,910.00 Empat puluh sembilan juta lima ratus lima puluh ribu rupiah Diskon DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan copy 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306879 ) PT. Bumi Indo Prima KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 13 Mei 2014 13 Mei 2014 Ir. Djati Samodra AMOUNT 49,550,000.00 - - - - 49,550,000.00 PT. Bumi Indo Prima KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, Jln. Pangeran Jaya Karta No. 20 Blok A 22-24 Jakarta Pusat PO No. : 000129 No Telp: 021-6254328 & 6240546 No Fax. : 021-6254329 Up. Bpk. Jeffri Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 30 pcs Main frame 1219 W 7,500.00 2 140 pcs Main frame 1217 W 7,000.00 3 340 pcs Jack base t=60 cm 5,000.00 4 340 pcs U Head jack base t=60 cm 5,000.00 5 60 btg Pipa scaffolding 1" 3mtr 15,000.00 6 105 btg Pipa scaffolding 1" 4mtr 20,000.00 7 10 btg Pipa scaffolding 1" 6mtr 26,000.00 Terbilang : Sub Total Delapan juta enam ratus lima puluh satu ribu lima ratus rupiah Diskon DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan copy 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306879 ) PT. Rejeki Logam Jaya KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 412500 41250 371250 05 April 2014 05 April 2014 Ir. Djati Samodra AMOUNT 225,000.00 980,000.00 1,700,000.00 1,700,000.00 900,000.00 2,100,000.00 260,000.00 7,865,000.00 - 7,865,000.00 786,500.00 - 8,651,500.00 PT. Rejeki Logam Jaya KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, PT. Rejeki Logam Jaya Jln. Pangeran Jaya Karta No. 20 Blok A 22-24 Jakarta Pusat PO No. : 000129 No Telp: 021-6254328 & 6240546 No Fax. : 021-6254329 Up. Bpk. Jeffri Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 50 pcs Cat walk 330,000.00 2 3 4 5 6 7 8 9 10 11 Terbilang : Sub Total Delapan belas juta seratus lima puluh ribu rupiah Diskon DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan copy 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306879 ) PT. Rejeki Logam Jaya KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 412500 82500 330000 05 April 2014 05 April 2014 Ir. Djati Samodra AMOUNT 16,500,000.00 16,500,000.00 - 16,500,000.00 1,650,000.00 - 18,150,000.00 PT. Rejeki Logam Jaya KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, PT. Rejeki Logam Jaya Jln. Pangeran Jaya Karta No. 20 Blok A 22-24 Jakarta Pusat PO No. : 000129 No Telp: 021-6254328 & 6240546 No Fax. : 021-6254329 Up. Bpk. Jeffri Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 30 pcs Main frame 1219 W 7,500.00 2 140 pcs Main frame 1217 W 7,000.00 3 170 pcs Cross brace 220 5,000.00 4 180 pcs Joint pin 2,000.00 5 340 pcs Jack base t=60 cm 5,000.00 6 340 pcs U Head jack base t=60 cm 5,000.00 7 60 btg Pipa scaffolding 1" 3mtr 15,000.00 8 105 btg Pipa scaffolding 1" 4mtr 20,000.00 9 10 btg Pipa scaffolding 1" 6mtr 26,000.00 10 165 pcs Clamp swifel 4,500.00 11 75 pcs Clamp fix 4,500.00 Terbilang : Sub Total Sebelas juta seratus tujuh puluh ribu lima ratus rupiah Diskon DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan copy 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306879 ) PT. Rejeki Logam Jaya KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 412500 41250 371250 05 April 2014 05 April 2014 Ir. Djati Samodra AMOUNT 225,000.00 980,000.00 850,000.00 360,000.00 1,700,000.00 1,700,000.00 900,000.00 2,100,000.00 260,000.00 742,500.00 337,500.00 10,155,000.00 - 10,155,000.00 1,015,500.00 - 11,170,500.00 PT. Rejeki Logam Jaya KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, PT. Potensi Karunia Gemilang Jl. Pangalan I-A Rt/Rw.001/005 Bekasi PO No. : 000123 No Telp/ Fax. : 021-82607652/ 021.82603462 Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 945 pcs Main frame 1219 W 7,000.00 2 500 pcs Cross brace 220 5,000.00 3 500 pcs Jack base t=60 cm 5,000.00 4 500 pcs U head t=60 cm 5,000.00 Terbilang : Sub Total Lima belas juta lima ratus dua puluh enam ribu lima ratus rupiah Diskon DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan copy 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306879 ) PT. Potensi Karunia Gemilang KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 08 April 2014 08 April 2014 Ir. Djati Samodra AMOUNT 6,615,000.00 2,500,000.00 2,500,000.00 2,500,000.00 14,115,000.00 - 14,115,000.00 1,411,500.00 - 15,526,500.00 PT. Potensi Karunia Gemilang KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, Sumber Cahaya, Toko Jl. Letjen Suprapto 55D Jakarta PO No. : 1400290 No Telp/ Fax. : 021-4221105/ 021, 4220419 Up. Ko. Benny Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 4 Roll Kabel NYM 4 x 4 mm 1,080,000.00 2 50 pcs Skun 70 mm 5,000.00 3 50 ltr Skun 95 mm 6,500.00 4 20 unit Lampu HPIT 400 watt 650,000.00 5 3 unit Kontektor 32 Amp, 220 V 240,000.00 6 3 unit Foto sell 65,000.00 Terbilang : Sub Total Delapan belas juta delapan ratus sepuluh ribu rupiah Diskon DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan asli 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306790 ) Sumber Cahaya KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 01 April 2014 02 April 2014 Ir. Djati Samodra AMOUNT 4,320,000 250,000 325,000 13,000,000 720,000 195,000 18,810,000 - 18,810,000 - - 18,810,000 Sumber Cahaya KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, PT. Wijaya Inti Gita Utama Jl. Otista Raya No. 133 Jakarta Timur PO No. : 1400285 No Telp/ Fax. : 021-6516688/ 021, 6519748 Up. Bpk Herman Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 209 ltr Oli Meditran SX 15 - 40 (PTM) 24,108.00 2 209 ltr Oli Turalik 52 (PTM) 19,270.00 3 209 ltr Oli Rored HD A 90 28,126.00 Terbilang : Sub Total Enam belas juta empat ratus tiga puluh delapan tujuh ratus tujuh puluh Diskon rupiah DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan copy 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306790 ) PT. Wijaya Inti Gita Utama H e r m a n KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 28 Maret 2014 28 Maret 2014 Ir. Djati Samodra AMOUNT 5,038,572 4,027,430 5,878,334 66.66667 26000 8666.667 17333.33 14,944,336 - 14,944,336 1,494,434 - 16,438,770 PT. Wijaya Inti Gita Utama H e r m a n KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, PT. Gilang Gemala Borneo Perkasa Jln. Boulevard Barat RayaBlok LC - VII/99 Kelapa Gading PO No. : 000106 Jakarta Utara No Telp/ Fax. : 021-91111995/ 021, 45853455 Up. Ibu Windi Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 326 pcs Main frame 1219 W 7,500.00 2 652 pcs Main frame 1217 W 7,000.00 3 978 pcs Cross brace 220 5,000.00 4 1,304 pcs Joint pin 2,000.00 5 652 pcs Jack base t=60 cm 5,000.00 6 652 pcs U Head jack base t=60 cm 5,000.00 7 210 btg Pipa scaffolding 1" 3mtr 15,000.00 8 116 btg Pipa scaffolding 1" 4mtr 20,000.00 9 16 btg Pipa scaffolding 1" 6mtr 26,000.00 10 235 pcs Clamp swifel 4,500.00 11 140 pcs Clamp fix 4,500.00 Terbilang : Sub Total Tiga puluh satu juta empat ratus enam puluh ribu lima ratus lima puluh- Diskon rupiah. DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan copy 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306790 ) PT. Gilang Gemala Borneo Perkasa Nicodemus Christopher Division Head KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 25 Maret 2014 25 Maret 2014 Ir. Djati Samodra AMOUNT 2,445,000.00 4,564,000.00 4,890,000.00 2,608,000.00 3,260,000.00 3,260,000.00 3,150,000.00 2,320,000.00 416,000.00 1,057,500.00 630,000.00 28,600,500.00 - 28,600,500.00 2,860,050.00 - 31,460,550.00 PT. Gilang Gemala Borneo Perkasa Nicodemus Christopher Division Head KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, CV. Multi Steelindo Perkasa Jln. Pangeran Jayakarta No. 21C Jakarta Barat PO No. : 1400242 No Telp/ Fax. : 021-6251207/ 021, 6251495 Up. Bpk. Jefri Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 5 lbr Besi Plat 4" x 8" x 10 mm 2,300,000 2 35 btg Besi H Beam 150 x 150 x 7 x 12 m 4,030,000 Terbilang : Sub Total Seratus enam puluh tujuh juta delapan ratus lima ribu rupiah Diskon DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan asli 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306790 ) CV. Multi Steelindo Perkasa KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 20 Maret 2014 22 Maret 2014 Ir. Djati Samodra AMOUNT 11,500,000 141,050,000 152,550,000 - 152,550,000 15,255,000 - 167,805,000 10500 CV. Multi Steelindo Perkasa KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, Roni Jaya Makmur Taman Duta mas No. 19 PO No. : 1400096 Jakarta Barat No Telp/ Fax. : 021-91707765/ 021, 5676939 Up. Bpk. Andre Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 20 pcs Helm putih MSA asli 31,000 2 20 pcs Rompi safety hijau 25,000 Terbilang : Sub Total Satu juta seratus dua puluh ribu rupiah. Diskon DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan asli 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306790 ) Roni Jaya Makmur KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 14 Maret 2014 14 Maret 2014 Ir. Djati Samodra AMOUNT 620,000 500,000 1,120,000 - 1,120,000 - - 1,120,000 Roni Jaya Makmur KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, Roni Jaya Makmur Taman Duta mas No. 19 PO No. : 1400134 Jakarta Barat No Telp/ Fax. : 021-91707765/ 021, 5676939 Up. Bpk. Andre Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 4 unit Lori ( Gerobag warna hijau ) 375,000 Terbilang : Sub Total Satu juta lima ratus ribu rupiah. Diskon DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan asli 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306790 ) Roni Jaya Makmur KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 06 Maret 2014 06 Maret 2014 Ir. Djati Samodra AMOUNT 1,500,000 1,500,000 - 1,500,000 - - 1,500,000 Roni Jaya Makmur KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, Roni Jaya Makmur Taman Duta mas No. 19 PO No. : 1300465 Jakarta Barat No Telp/ Fax. : 021-91707765/ 021, 5676939 Up. Bpk. Andre Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 200 bh Rompi hijau 25,000 2 100 bh Rompi orange 18,500 3 100 bh Helm putih 31,000 4 200 bh Helm orange 17,500 Terbilang : Sub Total Tiga belas juta empat ratus lima puluh ribu rupiah. Diskon DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan asli 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306790 ) Roni Jaya Makmur KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 27 Februari 2014 27 Februari 2014 Ir. Djati Samodra AMOUNT 5,000,000 1,850,000 3,100,000 3,500,000 13,450,000 - 13,450,000 - - 13,450,000 Roni Jaya Makmur KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, Roni Jaya Makmur Taman Duta mas No. 19 PO No. : 1300446 Jakarta Barat No Telp/ Fax. : 021-91707765/ 021, 5676939 Up. Bpk. Andre Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 100 pcs Helm pekerja VGS warna orange 17,500 2 100 psg Sepatu boot jeep warna hitam 45,000 Terbilang : Sub Total Enam juta dua ratus lima puluh ribu rupiah. Diskon DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan asli 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306790 ) Roni Jaya Makmur KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 18 Februari 2014 18 Februari 2014 Ir. Djati Samodra AMOUNT 1,750,000 4,500,000 6,250,000 - 6,250,000 - - 6,250,000 Roni Jaya Makmur KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, Roni Jaya Makmur Taman Duta mas No. 19 PO No. : 1400141 Jakarta Barat No Telp/ Fax. : 021-91707765/ 021, 5676939 Up. Bpk. Andre Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 20 lsn Sarung tangan kain 36,000 Terbilang : Sub Total Tujuh ratus dua puluh ribu rupiah. Diskon DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan asli 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306790 ) Roni Jaya Makmur KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 06 Maret 2014 06 Maret 2014 Ir. Djati Samodra AMOUNT 720,000 720,000 - 720,000 - - 720,000 Roni Jaya Makmur KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, Roni Jaya Makmur Taman Duta mas No. 19 PO No. : 1300379 Jakarta Barat No Telp/ Fax. : 021-91707765/ 021, 5676939 Up. Bpk. Andre Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 50 pcs Helm pekerja VGS warna orange 17,500 2 20 pcs Hel MSA warna putih 28,000 3 100 pcs Jas hujan "Dolpin" 60,000 Terbilang : Sub Total Tujuh juta empat ratus tiga puluh lima ribu rupiah. Diskon DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan asli 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306790 ) Roni Jaya Makmur KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 23 Januari 2014 23 Januari 2014 Ir. Djati Samodra AMOUNT 875,000 560,000 6,000,000 7,435,000 - 7,435,000 - - 7,435,000 Roni Jaya Makmur KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, Panca Jaya, CV Jl. Raya Otto Iskandardinata 100 PO No. : 1400240 Jakarta Timur No Telp/ Fax. : 021-8194762/ 021, 8509555 Up. Bpk. Hengky Wandoko Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 30 lbr Gypsum board 9 mm 50,000 2 5 sak Compound gypsum 60,000 3 2 pak Screw 1 1/4" 55,000 Terbilang : Sub Total Enam juta lima ratus empat puluh tujuh ribu dua ratus rupiah Diskon DPP. PPN Add. Cost Total Checked by, Approved by Ir. Djati Samodra Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan asli 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306790 ) Panca Jaya, CV Hengky Wandoko KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 13 Maret 2014 14 Maret 2014 Ir. Djati Samodra AMOUNT 1,500,000 300,000 110,000 1,910,000 - 1,910,000 191,000 - 2,101,000 Panca Jaya, CV Hengky Wandoko KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, Multi Gas Alam Jl. Pluit Karang Manis Blok D/7 Barat 41 Muara Karang PO No. : 1400179 Jakarta Utara No Telp/ Fax. : 021-56983232/ 021, 56983235 Up. Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 15 tbg Oksigen 50,000 Terbilang : Sub Total Delapan ratus dua puluh lima ribu rupiah Diskon DPP. PPN Add. Cost Total Checked by, Approved by Rajanto Ir. Djati Samodra Site Engineering Manager Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan asli 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306790 ) Multi Gas Alam KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 13 Maret 2014 14 Maret 2014 Ir. Djati Samodra AMOUNT 750,000 750,000 - 750,000 75,000 - 825,000 Multi Gas Alam KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, Panca Jaya, CV Jl. Raya Otto Iskandardinata 100 PO No. : 1400160 Jakarta Timur No Telp/ Fax. : 021-8194762/ 021, 8509555 Up. Bpk. Hengky Wandoko Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 4 roll Kawat Galvanized 2.5 mm 650,000 Terbilang : Sub Total Satu juta empat ratus tiga puluh ribu rupiah Diskon DPP. PPN Add. Cost Total Checked by, Approved by Rajanto Ir. Djati Samodra Site Engineering Manager Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Material A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan asli 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306790 ) Panca Jaya, CV Hengky Wandoko KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER QUANTITY DESCRIPTION Prepared by, Confirmed by, 13 Maret 2014 14 Maret 2014 Ir. Djati Samodra AMOUNT 2,600,000 2,600,000 - 2,600,000 260,000 - 2,860,000 Panca Jaya, CV Hengky Wandoko KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C PURCHASE ORDER Confirmed by, Surya Bahagia Mandiri, PT Jl. Duren Tiga Selatan ( H. Maun ) No. 2C RT.007/ RW. 03 Kel. Duren Tiga Jakarta 12760 PO No. : 1400201 Jakarta Selatan No Telp : 021-7972312, 79198519 No Fax : 021-7996416 UP : Bpk. Bambang. S Delivery Office Date of order District 8 Mixed use Development Project Phase 2 Delivery Date SCBD Lot 13 & 2B Jl. Jend. Sudirman 52 - 53 Jakarta Requition No. Requestor CP. ......................... No. Telp./ Hp : ................................. ITEM UNIT PRICE 1 4 unit Blower 24" 380 V / 3 P 8,100,000 Terbilang : Sub Total Tiga puluh lima juta enam ratus empat puluh ribu rupiah Diskon DPP. PPN Add. Cost Total Checked by, Approved by Rajanto Ir. Djati Samodra Site Engineering Manager Senior Project Manager Note : No. NPWP : 31,821,545,6 - 028,000 Pembelian Equipment A. Syarat-syarat pembayaran harap dilampirkan 1. Surat Jalan asli 2. Faktur Pajak asli 3. Purchase order asli 4. Invoice / kwitansi harus ada nomor tanggal dan nomor purchase order 5. Pembayaran 30 hari setelah invoice diterima B. Mohon mengikuti semua standar dan aturan yang berlaku tentang K3L di PT. Acset Indonusa C. Mohon agar ditanda tangani dan di fax kembali ke PT Acset Indonusa ( 021 29306790 ) Surya Bahagia Mandiri, PT PURCHASE ORDER DESCRIPTION KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C QUANTITY Confirmed by, Prepared by, 13 Maret 2014 14 Maret 2014 Ir. Djati Samodra AMOUNT 32,400,000 32,400,000 - 32,400,000 3,240,000 - 35,640,000 Surya Bahagia Mandiri, PT PURCHASE ORDER KERJA SAMA OPERASI ACSET INDONUSA TBK - DAEWOO E & C Confirmed by,