Final Major Projection Booklet
Final Major Projection Booklet
Project
Planning and
Production
Name: Henry Vines
Production Title:
Fosters
Date Submission of Production:
21
st
May 2014
Length of production:
1.00 minutes
Crew names/ contact details:
Name Contact
Henry Vines [email protected]
Actors names / contact details:
Name Contact
Sam Stark [email protected]
Adam Galloway [email protected]
Charlie Kerby [email protected]
Chris Hudson [email protected]
Production roles for crew
Name Role Date needed Deadline for work
Henry Vines Cameraman 17
th
May 20
th
May
Henry Vines Editor 19
th
May 21
st
May
Production roles for actors
Name Role Date needed Needed for
Sam Stark Main Actor 13
th
May 2014 Acting
Adam Galloway Main Actor 13th May 2014 Acting
Charlie Kerby Main Actor 13th May 2014 Acting
Chris Hudson Background actor 13th May 2014 Acting
Locations used (please attach recces to this document with photographs of
locations)
Location Address of location
Permission needed
Y/N
Date at location
The Bounty Bourne End- Bucks-
SL85RG
Y 13
th
May 2014
Props required
Props Scene Actor using Date needed
Beer x3 Scene 2 onwards All 13
th
May 2014
Keg 1 Adam Galloway 15
th
May 2014
Sunglasses Scene 2 onwards Adam Galloway 13
th
May
Agreed content / amended brief (please insert a copy)
Risk Assessments
1. Attach photos of risks
2. Attach risk assessment sheets for each location
Team meetings, meetings with actors and crew
Date Attendees Meeting agenda Outcome
12
th
May 2014 All actors Filming the day after All available and
ready for filming
16
th
May 2014 Main Actors Look over footage All happy with
footage
19
th
May Main actors Showing edited
version
People putting their
input in
20
th
Main actors Showing final
uploaded product
Final agreement of
video being good
Contingency / back up plans
Main Actors
Adam Galloway
Joe Jackson
Sam Stark
Charlie Kerby
Chris Hudson
Back up Actors
Ali Cawthorpe
George Ellis
Joe Hayes
Bertie Kerby
1 Lee Lane, Pinkneys Green,
Maidenhead, SL6 6NU
Contact:
E: [email protected]
W: thepinkneysarms.com
91 Heath End Rd Flackwell Heath High Wycombe HP10 9ES
Contact:
P: 01628 521 277
15 - 17th May 2014 18-20TH May 2014
If any of the main actors were to get injured or couldnt be there for a reason that day like
there car had broken down I have the backup actors on call and ready to take their place. If
the pub which I have originally planned to make my production in doesnt grant me
permission I can film in the back up pub. If on the 17th may the weather isnt good I will then
film on my back up day 18th may.
Detail how you solved problems
Problem Solved
Battery on camera ran out Bought a spare battery with me
Actor couldnt make it Called a backup actor and they came
First pub didnt grant me permission Went to my back up pub
Couldnt get shot of keg Used a can and poured into glass
Modifications (Why did you modify your work and what was changed during post-
production)
Modified How Why
Length of shots Shortened So video flows better
No shot of keg Changed the scene Wasnt allowed to film it
Additional information
Mood board
Story board
Original brief
Attach any pre-production a material you may need
Storyboard
Script
Rough drafts of work / designs
Original Brief
Final mood board