0% found this document useful (0 votes)
150 views5 pages

F-044-Ata-wcr (Work Completion Report) Rev.02

The document is a work completion report for PT. Artha Teknik Abadi detailing progress on welding, painting, and delivering pile headstock connection plates for PT. BAM Decorient Indonesia. It describes completing 50 connection plates by the reported date, including 39 of Type 1 and 11 of Type 2. The overall project is to produce 251 connection plates, with progress of the work at 35% completed as of August 27, 2013.

Uploaded by

Jhon Andri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
150 views5 pages

F-044-Ata-wcr (Work Completion Report) Rev.02

The document is a work completion report for PT. Artha Teknik Abadi detailing progress on welding, painting, and delivering pile headstock connection plates for PT. BAM Decorient Indonesia. It describes completing 50 connection plates by the reported date, including 39 of Type 1 and 11 of Type 2. The overall project is to produce 251 connection plates, with progress of the work at 35% completed as of August 27, 2013.

Uploaded by

Jhon Andri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

DOC NO :ATA/F/QC/7517

PO NO
PT.ARTHA TEKNIK
ABADI
DATE
WCR NO : 010/WCR/ATA/BAM/III/14
Dept. TECHNICAL ARIEF KAPRAWIRA
Equipment No. DATE 17-Mar-14
Subject
Prepared By
NB : Drawing attached
WORK COMPLETION REPORT
D11092-S1317
Approved By
PT. BAM DECORIENT
INDONESIA
February 28, 2014
Checked By
JON SUSANTO
PT. ARTHA TEKNIK ABADI

PT. BAM DECORIENT
-
BASE PLATE - Additional
ISO Form No : 7.5-17 ; Rev : 2 ; Tgl : 03-07-13
Progress (100 %)
Job Completion Date 17-Mar-14
LEONARDO
PT. ARTHA TEKNIK ABADI
PT . ARTHA TEKNIK ABADI
Engineering & Construction
DOC NO :ATA/F/QC/7517
PO NO
PT.ARTHA TEKNIK
ABADI
DATE
WCR NO : 009/WCR/ATA/BAM/II/14
Dept. TECHNICAL ARIEF KAPRAWIRA
Equipment No. DATE 22-Feb-14
Subject
ID CODE QUANTITY UNIT
01
Welding,Painting & Delivery Pile Headstock Connection
01.01.
Type 1 (1.4 x 1.4 m) 20.11.4 196 UNIT
01.02.
Type 2 (1.62 x 1.52 m) 20.11.4 57 UNIT
Prepared By
NB : Drawing attached
WORK COMPLETION REPORT
D11092-H00049
Approved By
PT. BAM DECORIENT
INDONESIA
April 22, 2013
PILE HEADSTOCK CONNECTION PLATE
Type 1 : 10 EA
Progress (100 %)
-
DESCRIPTION
Job Completion Date 18-Feb-14
LEONARDO
PT. ARTHA TEKNIK ABADI
Checked By
JON SUSANTO
PT. ARTHA TEKNIK ABADI

PT. BAM DECORIENT
ISO Form No : 7.5-17 ; Rev : 2 ; Tgl : 03-07-13
PT . ARTHA TEKNIK ABADI
Engineering & Construction
DOC NO :ATA/F/QC/7517
PO NO
PT.ARTHA TEKNIK
ABADI
DATE
WCR NO : 008/WCR/ATA/BAM/VII/13
Dept. TECHNICAL ARIEF KAPRAWIRA
Equipment No. DATE 7-Dec-13
Subject
ID CODE QUANTITY UNIT
01
Welding,Painting & Delivery Pile Headstock Connection
01.01.
Type 1 (1.4 x 1.4 m) 20.11.4 196 UNIT
01.02.
Type 2 (1.62 x 1.52 m) 20.11.4 57 UNIT
Prepared By
NB : Drawing attached
ISO Form No : 7.5-17 ; Rev : 2 ; Tgl : 03-07-13
PILE HEADSTOCK CONNECTION PLATE
DESCRIPTION
Job Completion Date
LEONARDO
PT. ARTHA TEKNIK ABADI
Checked By
JON SUSANTO
PT. ARTHA TEKNIK ABADI

PT. BAM DECORIENT
Progress (100 %)
Type 2 : 57 EA
Type 1 : 194 EA
Qty : 251 EA
- 7-Dec-13
WORK COMPLETION REPORT
D11092-H00049
Approved By
PT. BAM DECORIENT
INDONESIA
April 22, 2013
PT . ARTHA TEKNIK ABADI
Engineering & Construction
DOC NO :ATA/F/QC/7517
PO NO
PT.ARTHA TEKNIK
ABADI
DATE
WCR NO : 007/WCR/ATA/BAM/VII/13
Dept. TECHNICAL BAMBANG
Equipment No. DATE 27-Aug-13
Subject
ID CODE QUANTITY UNIT
01
Welding,Painting & Delivery Pile Headstock Connection
01.01.
Type 1 (1.4 x 1.4 m) 20.11.4 196 UNIT
01.02.
Type 2 (1.62 x 1.52 m) 20.11.4 57 UNIT
Prepared By
NB : Drawing attached
ISO Form No : 7.5-17 ; Rev : 2 ; Tgl : 03-07-13
PILE HEADSTOCK CONNECTION PLATE
TYPE 1 (QTY 66 EA) TYPE 2 (22 EA) QTY = 88 EA
Job Completion Date 24-Aug-13
LEONARDO
PT. ARTHA TEKNIK ABADI
Checked By
ISMAWAN HARDIANA
PT. ARTHA TEKNIK ABADI
RODRIGO C.ILAGAN
PT. BAM DECORIENT
DESCRIPTION
- 27-Aug-13
Progress (35 %)
WORK COMPLETION REPORT
D11092-H00049
Approved By
PT. BAM DECORIENT
INDONESIA
April 22, 2013
RODRIGO C.ILAGAN
PT . ARTHA TEKNIK ABADI
Engineering & Construction
DOC NO :ATA/F/QC/7517
PO NO PT.ARTHA TEKNIK ABADI
DATE
WCR NO : 004/WCR/ATA/BAM/VII/13
Dept. TECHNICAL BAMBANG
Equipment No. DATE
Subject
Prepared By
NB : Drawing attached
ISO Form No : 7.5-17 ; Rev : 2 ; Tgl : 03-07-13
-
PILE HEADSTOCK CONNECTION PLATE
TYPE 1 (QTY 39 EA) TYPE 2 (11 EA) QTY = 50 EA
LEONARDO
PT. ARTHA TEKNIK ABADI
ISMAWAN HARDIANA
PT. ARTHA TEKNIK ABADI

PT. BAM DECORIENT
Job Completion Date
Checked By
WORK COMPLETION REPORT
D11092-H00049
Approved By
PT. BAM DECORIENT
INDONESIA
April 22, 2013
PT . ARTHA TEKNIK ABADI
Engineering & Construction