Pressure Test Package Review: Job No. SP-2586 Project Name

This document is a report reviewing a pressure test package for Job No. SP-2586. It lists the package number, subcontractor, engineering company, and inspection steps including clearance of documents, welding history, non-destructive examination, and a final punch list. The status of each step is recorded as ready, in service, or complete with signatures and dates.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views1 page

Pressure Test Package Review: Job No. SP-2586 Project Name

This document is a report reviewing a pressure test package for Job No. SP-2586. It lists the package number, subcontractor, engineering company, and inspection steps including clearance of documents, welding history, non-destructive examination, and a final punch list. The status of each step is recorded as ready, in service, or complete with signatures and dates.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

J ob No.

SP-2586
FORM PP-05 SAMSUNG ENGINEERING CO.,LTD.
SUB-C0N :
SAMSUNG:
(SIGNATURE /DATE)
(SIGNATURE /DATE)
SAMSUNG:
PAKAGE NO. :
ACS-CD-025
(QC)
SAMSUNG:
(SIGNATURE /DATE)
OIL
(SIGNATURE /DATE)
INTERGEN :
(SIGNATURE /DATE)
SAMSUNG:
(SIGNATURE /DATE)
(SIGNATURE /DATE)
SECL :
PNEUMATIC
HYDRO
(QC)
PRESSURE TEST PACKAGE REVIEW
REPORT
(2)
(5)
(1) (QC)
LIST OF CONTENTS CLEARANCE
READY FOR TEST
IN SERVICE
VISUAL
(4)
DOCUMENTS WELDING HISTORY SHEET
Project Name :
FINAL PUNCH LIST CLEARANCE
(3)
NDE CLEARANCE
(PIPING)