0% found this document useful (0 votes)
199 views8 pages

Process Chart: O - Operation - Transport - Storage D - Delay

This document contains process charts for manufacturing different components. It lists the operations, transport, storage, and delays involved at each step of manufacturing gears, shafts, frameworks, wooden columns, slotted levers, assemblies, and transporter links. For each component, it provides the total time required and breaks down the time spent on individual steps.

Uploaded by

Nishant Chauhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
199 views8 pages

Process Chart: O - Operation - Transport - Storage D - Delay

This document contains process charts for manufacturing different components. It lists the operations, transport, storage, and delays involved at each step of manufacturing gears, shafts, frameworks, wooden columns, slotted levers, assemblies, and transporter links. For each component, it provides the total time required and breaks down the time spent on individual steps.

Uploaded by

Nishant Chauhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

TOTAL TIME (min) : O 355 25 2 0 D 70

Model No:
Title: Spur Gears
Figure No.

CENTRAL WORKSHOPS
PROCESS CHART
Type: Man/Machine
Charted by:
Dated:21-4-2014
O -OPERATION - INSPECTION -TRANSPORT - STORAGE D - DELAY
EVENT PERFORMED ON------IS UPTO SERIAL NO. .. SHEET NO..OF .
S.No. DESCRIPTION O D TIME (m)
1. Collect tool set * 30
2. Collect MS rod * 15
3. Mark length needed * 5
4. Rod to rod cutting machine * 30
5. Cutting of rod * 45
6. Facing * 10
7. Drilling * 40
8. Turning * 120
9. Checking dimension * 5
10. To horizontal milling machine * 2
11. Setting the machine * 10
12. Gear cutting * 120
13. Boring * 20














TOTAL TIME (min) : O 335 25 2 0 D 70



Model No:
Title: Spur Gears
Figure No.

CENTRAL WORKSHOPS
PROCESS CHART
Type: Man/Machine
Charted by:
Dated:21-4-2014
O -OPERATION - INSPECTION -TRANSPORT - STORAGE D DELAY
EVENT PERFORMED ON------IS UPTO SERIAL NO. .. SHEET NO..OF .
S.No. DESCRIPTION O D TIME (m)
1. Collect tool set * 30
2. Collect MS rod * 15
3. Mark length needed * 5
4. Rod to rod cutting machine * 30
5. Cutting of rod * 45
6. Facing * 10
7. Drilling * 40
8. Turning * 120
9. Checking dimension * 5
10. To horizontal milling machine * 2
11. Setting the machine * 10
12. Gear cutting * 120















TOTAL TIME (min) : O 132 12 5 0 D 40



Model No:
Title: Shafts
Figure No.

CENTRAL WORKSHOPS
PROCESS CHART
Type: Man/Machine
Charted by:
Dated: 21-4-2014
O -OPERATION - INSPECTION -TRANSPORT - STORAGE D DELAY
EVENT PERFORMED ON------IS UPTO SERIAL NO. .. SHEET NO..OF .
S.No. DESCRIPTION O D TIME (m)
1 Collect tool set * 30
2 Collect ms rod * 5
3 Mark required dimension * 5
4 to fitting shop * 3
5 Fixing in the benchwise * 2
6 Collect hacksaw * 10
7 Rod cutting * 40
8 To lathe * 2
9 Turning * 90
10 Dimension checking * 2
















TOTAL TIME (min) : O 105 20 65 0 D30




Model No:
Title: Framework
Figure No.

CENTRAL WORKSHOPS
PROCESS CHART
Type: Man/Machine
Charted by:
Dated:21-4-2014
O -OPERATION - INSPECTION -TRANSPORT - STORAGE D DELAY
EVENT PERFORMED ON------IS UPTO SERIAL NO. .. SHEET NO..OF .
S.No. DESCRIPTION O D TIME (m)
1 Collecting plywood and wooden columns * 60
2 Collect tool set * 30
3 Marking required dimension * 15
4 To carpentry * 2
5 Cutting using jigsaw * 30
6 Checking dimension * 5
7 To drilling machine * 3
8 Drilling * 20
9 Filing * 15
10 Fitting bearing * 40














TOTAL TIME (min) : O 125 15 3 0 D30



Model No:
Title: Wooden Columns
Figure No.

CENTRAL WORKSHOPS
PROCESS CHART
Type: Man/Machine
Charted by:
Dated:21-4-14
O -OPERATION - INSPECTION -TRANSPORT - STORAGE D DELAY
EVENT PERFORMED ON------IS UPTO SERIAL NO. .. SHEET NO..OF .
S.No. DESCRIPTION O D TIME (m)
1 Collect tool set * 30
2 Collect wooden planks * 10
3 Plaining of surface * 10
4 Marking of dimension * 5
5 Cutting into desired shapes * 75
6 To drilling machine * 3
7 Drilling * 30
8 Making slot * 10

















TOTAL TIME (min) : O 40 7 8 0 D30









Model No:
Title: Slotted lever
Figure No.

CENTRAL WORKSHOPS
PROCESS CHART
Type: Man/Machine
Charted by:
Dated:21-4-14
O -OPERATION - INSPECTION -TRANSPORT - STORAGE D - DELAY
EVENT PERFORMED ON------IS UPTO SERIAL NO. .. SHEET NO..OF .
S.No. DESCRIPTION O D TIME (m)
1 Collect tool set * 30
2 Collect ms rod * 5
3 Mark dimension * 2
4 To rod cutting maching * 2
5 Cutting * 20
6 To Drilling machine * 2
7 Drilling * 15
8 To fitting * 2
9 To welding centre * 2
10 Welding * 5










TOTAL TIME (min) : O 152 5 30 0 D 0




Model No:
Title:Assembly
Figure No.

CENTRAL WORKSHOPS
PROCESS CHART
Type: Man/Machine
Charted by:
Dated:21-4-14
O -OPERATION - INSPECTION -TRANSPORT - STORAGE D - DELAY
EVENT PERFORMED ON------IS UPTO SERIAL NO. .. SHEET NO..OF .
S.No. DESCRIPTION O D TIME (m)
1 Collect nails and L-clamp * 30
2 Fixing shaft in plywood * 10
3 Welding gear to shaft * 12
4 Mark dimensions * 5
5 Fixing clamps * 20
6 Welding crank to shaft * 15
7 Assembling quick return components * 20
8 Hammering * 10
9 Fixing handle * 5
10 Painting * 60














TOTAL TIME (min) : O 125 15 3 0 D 30




Model No:
Title: Transporter link
Figure No.

CENTRAL WORKSHOPS
PROCESS CHART
Type: Man/Machine
Charted by:
Dated:21-4-14
O -OPERATION - INSPECTION -TRANSPORT - STORAGE D DELAY
EVENT PERFORMED ON------IS UPTO SERIAL NO. .. SHEET NO..OF .
S.No. DESCRIPTION O D TIME (m)
1 Collect tool set * 30
2 Collect wooden planks * 10
3 Plaining of surface * 10
4 Marking of dimension * 5
5 Cutting into desired shapes * 75
6 To drilling machine * 3
7 Drilling * 30
8 Making slot * 10