0% found this document useful (0 votes)
365 views1 page

Job Description - Technical Assistant

This job description is for a Technical Assistant who reports to the Drilling Engineer and ensures drilling reports meet company standards. The assistant will help procure well equipment, send orders to service companies, record data on drilling, mud, cement and bits for each well section, update costs and summaries, and assist compiling final well reports.

Uploaded by

Yougchu Luan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
365 views1 page

Job Description - Technical Assistant

This job description is for a Technical Assistant who reports to the Drilling Engineer and ensures drilling reports meet company standards. The assistant will help procure well equipment, send orders to service companies, record data on drilling, mud, cement and bits for each well section, update costs and summaries, and assist compiling final well reports.

Uploaded by

Yougchu Luan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Job Description - Technical Assistant

reports to the Drilling Engineer Project. Ensures that the drilling reporting is maintained to Company standards. Works with the Drilling Manager,
Drilling Superintendent and the Drilling Engineer.
1. Assist Drilling Superintendent to provide written specifications to the Material Dept for procurement of well equipment when required.
2. Assist Drilling Superintendent to send Services Orders and issue instructions to service companies.
3. Records drilling and completion time breakdowns for each section of the wells.
4. Records mud data for each section of the wells.
5. Records cement data for each section of the wells.
6. Records bit data for each section of the wells.
7. Update daily drilling and completion costs and prepares cost summaries by hole section.
8. Assist the operations Engineer to compile the "Final Well Drilling Report"

You might also like