0% found this document useful (0 votes)
367 views1 page

Process Flow Chart

This document outlines the process flowchart for producing ring spun yarn. It involves several steps: 1) Raw cotton is opened, cleaned, and blended in preparation for carding. 2) The cotton is carded to separate and align the fibers, then drafted and spun into sliver. 3) The sliver is drafted and twisted to produce roving, which is then wound and packaged for shipping to quality assurance.

Uploaded by

situ_tex8594
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
367 views1 page

Process Flow Chart

This document outlines the process flowchart for producing ring spun yarn. It involves several steps: 1) Raw cotton is opened, cleaned, and blended in preparation for carding. 2) The cotton is carded to separate and align the fibers, then drafted and spun into sliver. 3) The sliver is drafted and twisted to produce roving, which is then wound and packaged for shipping to quality assurance.

Uploaded by

situ_tex8594
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

d) Parallelize fibre.

b) Cleaning c) Blending
a) Produce lap by Doubling & Drafting.
b) Cleaning.
b) Parallelize fibre
c) Individualize fibre
d) Sliver formation
a) Produce different type of yarn by Drafting & Twisting
Packing
a) Prepare packing bags by giving net weight of 50 kg
Q.A, Utility, Store
dept.
a) Package formation of yarn.
b) Remove contamination & irregularities from yarn.
Yarn Conditioning
a) Standardize MR
b) Increase strength.
c) Increase lusturous.
Simplex - FL-100, FL - 200
a) Produce roving by Drafting & Twisting
b) Winding
Ring - RX240, K44, BT-702
b) Winding
Winding - Muratec - 21C, Savio-
a) Remove neps & short fibre
Comber - E65
Finisher Drg-RSB-D40
a) Produce uniform sliver by Doubling & Drafting
Postcomb Drg-RSB-D40
b) Cleaning c) Blending
Breaker Drg - SB-D40
a) Produce sliver by Doubling & Drafting
Precomb Drg - SB-D40
Unilap - E32
Maintenance, Q.A,
Utility dept.
c) Remove short fibre.
Karded Process e) Sliver formation Combed Process
Carding - C60
a) Remove neps.
b) Individualize fibre.
Vision Shield - ED35 a) Remove contamination. Vision Shield - ED35
Condensor - A21 a) Dedusting. Condensor - A21
Unimix - B70
a) Homogeneous mixing.
Unimix - B70
b) Storing material.
Uniflex - B60 a) Opening & Cleaning Uniflex - B60
Unifloc - A11
a) Opening & Produce small tuft of cotton.
Line : 1 Line : 2
Uniclean - B11
a) Opening & Cleaning
THE DELTA SPINNING MILLS LTD.
Zarun (South), Kashimpur, Gazipur.
Interacting
Departments
Process Flowchart for Ring Spun Yarn
Store & Q.A dept.
Bale Management (Mixing)

You might also like