Daily Report Sheet: Location of Work: Date: Weather Conditions

This daily report summarizes work for a project expansion at the Paiton 3 power plant. It lists 8 pieces of equipment used including a truck mixer, generator, and welding machine. The planned work includes lifting generator and oil tank sets and installing a roof and fuel pipes. Safety reporting notes the use of life jackets, helmets, and other safety gear. A total of 11 personnel are listed including managers, engineers, and various workers.

Uploaded by

Harry Bagus S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views4 pages

Daily Report Sheet: Location of Work: Date: Weather Conditions

This daily report summarizes work for a project expansion at the Paiton 3 power plant. It lists 8 pieces of equipment used including a truck mixer, generator, and welding machine. The planned work includes lifting generator and oil tank sets and installing a roof and fuel pipes. Safety reporting notes the use of life jackets, helmets, and other safety gear. A total of 11 personnel are listed including managers, engineers, and various workers.

Uploaded by

Harry Bagus S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

Project : PAITON 3 Expansion Project

Contractor: (fill the name of subcontractor)


Clear Cloud Rain
Location of Work :
Ash Disposal Area Temporary Office Area Unit-3 Area
Temporary Access Road Jetty Area
No. of personal : List of Equipment : Safety Reporting :
Truck Mixer 3
Work Description : Planned Work schedule:
Detail of Delays : Delivery Schedule
N/A
TOTAL(A) 27 TOTAL(B) 8
06-Jan-09 07-Jan-09
Prepared By Description Date
Carpenter
Subtotal(2) 19
General Worker 8 Sheet Piling Machine
Operator/Driver 7 Others(light truck) 1
Skilled Worker 3 Welding Machine 1
Foreman 1 Rebar Machine
2) Labours Generator 2
Surveyor Air Compressor
Mechanician/Electrician 3 Crawler Crane
Subtotal(1) 8 Trailer
1 Dump Truck/Lorry
Engineer 1 Bulldozer/Grader
Safety Officer 1 Mobile Crane
Manager 2 Excavator
Supervisor
Daily Report Sheet
Date : 6-Jan-09 Tue Weather Conditions
1) Management Staff Wheel Loader 1
Project : PAITON 3 Expansion Project
Contractor: PT. Nawata Kurnia Putra
Clear Cloud Rain
Location of Work :
Ash Disposal Area Temporary Office Area Unit-3 Area
Temporary Access Road Jetty Area
No. of personal : List of Equipment : Safety Reporting :
1
Truck Mixer
Work Description : Planned Work schedule:
1 Lifting Diesel Generator set ( 2 units ) 1 Install roofing
2 Lifting oil tank set ( 2 units ) 2 fuel pipe installation
3 Lifting genset house rafter ( 2 units ) 3 Install grounding
Detail of Delays : Delivery Schedule
N/A
Daily Report
Date : 26-Jan-09 Mon Weather Conditions
1) Management Staff Wheel Loader
Manager 1 Excavator Use safety gear : life jacket, safety
helmet, safety harness, safety shoes,
eye glass.
Supervisor 1 Dump Truck/Lorry
Engineer Bulldozer/Grader
Safety Officer 1 Mobile Crane 1
Mechanician/Electrician Crawler Crane
Subtotal(1) 3 Trailer
2) Labours Generator
Surveyor Air Compressor
Skilled Worker 2 Welding Machine 1
Foreman 1 Rebar Machine
Worker 4 Sheet Piling Machine
Operator/Driver 1 Others(light truck)
Carpenter
Subtotal(2) 8
TOTAL(A) 11 TOTAL(B) 2
26-Jan-09 27-Jan-09
Prepared By Description Date