0% found this document useful (0 votes)
36 views1 page

Cutter Teeth - Cost Brkup

The document is an LC (letter of credit) details for the procurement of cutter teeth and adapters for two dredgers from overseas. It lists the LC number and opening date, value in Euros and equivalent Bangladeshi Taka, and itemized costs including the LC value, fees, commissions, insurance, duties, and other expenses totaling over 830,000 Taka.

Uploaded by

AllOthers
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views1 page

Cutter Teeth - Cost Brkup

The document is an LC (letter of credit) details for the procurement of cutter teeth and adapters for two dredgers from overseas. It lists the LC number and opening date, value in Euros and equivalent Bangladeshi Taka, and itemized costs including the LC value, fees, commissions, insurance, duties, and other expenses totaling over 830,000 Taka.

Uploaded by

AllOthers
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ProcurementofCutterTeeth&Adapter

forDredgerDeltaI&DeltaII
LCDetails
L/CNo.
L/COpenDate:
L/CValue
ExchangeRate
Total:
Sl.
1
2
3
4
5
6
7
8
9
10
11
12
13

Heads

0684120118750
07112012
6,955.00
110.16
766,162.80

Amount(Tk.)
L/C
766,162.80
Swift
3,000.00
SwiftVat
450.00
Stamp
300.00
Stationery
250.00
L/CCommission
2,981.27
L/CCommissionVAT
447.19
Insurance
4,740.50
Duty
24,580.46
TrackRent
13,000.00
C&FCommission
10,000.00
PortBill
2,000.00
ShippingBill
2,300.00
830,212.22
Total:

You might also like