Team:## Project Title: System Block Diagram

The document outlines a team project including the project title, system block diagram, and individual progress reports from four team members. Each member provides an update on accomplishments since the last presentation, ongoing work, challenges, and plans until the next check-in, alongside a picture or diagram of their subsystem.

Uploaded by

William Huang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views5 pages

Team:## Project Title: System Block Diagram

The document outlines a team project including the project title, system block diagram, and individual progress reports from four team members. Each member provides an update on accomplishments since the last presentation, ongoing work, challenges, and plans until the next check-in, alongside a picture or diagram of their subsystem.

Uploaded by

William Huang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 5

Team:##

Needs Analysis Problem Statement Design Proposal Subsystem Development Prototype

Project Title

System Block Diagram

Team Member1
Accomplishments since the last presentation Ongoing progress/problems and plans until the next presentation

Subsystem Picture, Sketch or Graph (1 per team member)

Team Member2
Accomplishments since the last presentation Ongoing progress/problems and plans until the next presentation

Subsystem Picture, Sketch or Graph (1 per team member)

Team Member3
Accomplishments since the last presentation Ongoing progress/problems and plans until the next presentation

Subsystem Picture, Sketch or Graph (1 per team member)

Team Member4
Accomplishments since the last presentation Ongoing progress/problems and plans until the next presentation

Subsystem Picture, Sketch or Graph (1 per team member)