From Assistant Divisional Engineer, Maintenance, 220 KV Sub-Station, Renigunta. Lr.NO. ADE /M/220 KV SS / RGT / F.NO. Sir, / D.NO.
Sub:- EHT Sub-Division Renigunta 132 KV Sub-Station- Srikalahasti New 33 KV Bay erection work- M/S Navala Biyan Engineers Pvt Ltd instructions to remove UG Cable at 132 KV SS, Srikalahasti- reg. Ref:- 1. Lr.No.SE/TL&SS/Kdp/ADE-T/AET/F.No 123/D.No 54/14, dt:09-01-2014 2. Lr.No.AE /M/132 KV SS/SKHT/ F.NO. / D.NO.75 /14, dt :20 - 03 -2014
It is to inform that as per reference (1) cited, approval accorded by you from Superintending Engineer/TL&SS/Kadapa, for new 33 KV bay erection to M/S Navala Biyan Engineers Pvt Ltd. In this connection, we allowed you for erection of 33 KV Breaker, CTs and Control panel. But, you did not get approval for laying UG Cable inside the switch yard of 132 KV SS, Srikalahasti. Superintending Engineer/OMC/Tirupathi inspected 132 KV Sub-Station, Srikalahasti on 20-03-2014 and he instructed, to remove the UG cable immediately which was laid down in the switch yard of 132 KV SS, Srikalahasti pertaining to M/S Navala Biyan Engineers Pvt Ltd. Because, you did not get approval from APTRANSCO authorities and also this cable is an Obstruct for erection of narrow based Tower pertaining to new 132 KV feeder. Hence, it is instructed to remove UG cable which was laid down in the switch yard of 132 KV SS, Srikalahasti on or before 24-03-2014. After getting approval from higher authorities, you may lay down the UG cable.
Copy submitted to The Superintending Engineer / OMC /APTRANSCO/Tirupati. Copy submitted to The Divisional Engineer / O&M Division / APTRANSCO /Tirupati. Copy submitted to The Divisional Engineer / MRT/ APTRANSCO /Tirupati. Copy submitted to The Divisional Engineer / Rurals /APSPDCL/Tirupati. Copy communicated to The Assistant Divisional Engineer / Rurals/APSPDCL/Srikalahati. for favour of taking further action please