Design Sheet: (Containment Pit)

This document provides specifications for the construction of a containment pit including dimensions, materials required, and reinforcement details. It lists the internal dimensions and wall thicknesses for the pit, the estimated excavation depth and volume, required concrete and rebar quantities, structural steel and grating areas. The total estimated excavation volume is 3,260.49 cubic meters, with 972.90 square meters required for formworks and 2,160 square meters of grating area. Over 118 tons of rebar and no structural steel is required.

Uploaded by

Tu Tu Dar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
181 views3 pages

Design Sheet: (Containment Pit)

This document provides specifications for the construction of a containment pit including dimensions, materials required, and reinforcement details. It lists the internal dimensions and wall thicknesses for the pit, the estimated excavation depth and volume, required concrete and rebar quantities, structural steel and grating areas. The total estimated excavation volume is 3,260.49 cubic meters, with 972.90 square meters required for formworks and 2,160 square meters of grating area. Over 118 tons of rebar and no structural steel is required.

Uploaded by

Tu Tu Dar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.

Page 1 of 3

63-INQ12-XX-DC-01

BQ1125 I BILL OF QUANTITY LOCATION BANYAN (CONTAINMENT PIT)

1) PIT GEOMETRY INTERNAL LENGTH OF PIT INTERNAL WIDTH OF PIT INTERNAL DEPTH OF PIT WALL THICKNESS OF PIT BASE SLAB THICKNESS OF PIT THICKNESS OF LEAN CONCRETE PILING REQUIRED THICKNESS OF PARTITION WALL HEIGHT OF PARTITION WALL LENGTH OF PARTITION WALL NOS. OF PARTITION WALL THICKNESS OF SEPERATOR WALL HEIGHT OF SEPERATOR WALL LENGTH OF SEPERATOR WALL NOS. OF SEPERATOR WALL 2) CONCRETE CONC. VOLUME REQUIRED LEAN CONC. REQUIRED 3) REINFORCEMENT 3.1) PERIMETER WALL REBAR i) VERTICAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) HORIZONTAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR = = = = T 25 = = = = = = T 25 = = 3.10 m 150 mm 1201.00 nos. Bar 3.853 kg/m 14.346 Tons. 180.00 m 150 mm 16.67 nos. Bar 3.853 kg/m 11.560 Tons. = =
3 2756.700 m 3 142.170 m 2 460 N/mm

= = = = = = = = = = = = = = =

60.00 m 30.00 m 2.35 m 0.75 m 1.10 m 0.075 m NO. 0.00 m 2.35 m 0.00 m 0 nos. 0.00 m 0.00 m 30.00 m 0 nos. GRADE- C 35

fy =

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 2 of 3

63-INQ12-XX-DC-01

BQ1125 iii) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR iv) SLAB REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR 3.2) PARTITION WALL REBAR i) VERTICAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) HORIZONTAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR 3.3) SEPERATOR WALL REBAR i) VERTICAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR ii) HORIZONTAL REBAR LENGTH REBAR SPACING QTY. REBAR SIZE UNIT WEIGHT OF REBAR WEIGHT OF REBAR TOTAL REBAR WEIGHT = = = = T 13 = = = = = = T 13 = = = 0.00 m 200 mm 301.00 nos. Bar 1.042 kg/m 0.000 Tons. 30.00 m 200 mm 1.00 nos. Bar 1.042 kg/m 0.000 Tons. 118.734 Tons. = = = = T 13 = = = = = = T 13 = = 2.35 m 200 mm 1.00 nos. Bar 1.042 kg/m 0.000 Tons. 0.00 m 200 mm 24.50 nos. Bar 1.042 kg/m 0.000 Tons. = = = = T 25 = = = = = = T 25 = = 60.00 m 150 mm 201 nos. Bar 3.853 kg/m 46.472 Tons. 30.00 m 150 mm 401 nos. Bar 3.853 kg/m 46.356 Tons. (Z-direction) (X-direction)

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD. DOC. NO. : DESIGN SHEET SHEET NO.
Page 3 of 3

63-INQ12-XX-DC-01

BQ1125 4) EXCAVATION WORK ESTIMATED EXCAVATION DEPTH ESTIMATED EXCAVATION VOLUME 5) FORMWORKS AREA REQUIRED 6) STRUCTURAL STEEL (GRATING SUPPORT) = = = 0.00 kg/m 3000.00 m 0.00 tons. = = 3.53 m 3 3,260.49 m

972.90 m2 GRADE- S 250

UNIT WEIGHT OF MEMBER TOTAL LENGTH REQUIRED TOTAL STEEL WEIGHT REQUIRED 7) GRATING STEEL GRATING

GREATING AREA REQUIRED II BQ SUMMARY (CONTAINMENT PIT)

2 2160.00 m

TOTAL NOS. OF PITS TOTAL CONC. VOLUME REQUIRED LEAN CONC. REQUIRED TOTAL REBAR WEIGHT TOTAL STEEL WEIGHT REQUIRED GREATING AREA REQUIRED TOTAL ESTIM'D EXCAVATION VOL. TOTAL FORMWORKS AREA REQUIRED

= = = = = = = =

1 2756.70 142.17 118.73 0.00 2160.00 3260.49 972.90

nos. m3 m3 Tons. tons. m2 m3 m2

GRADE- C

35

(GRATING SUPPORT) STEEL GRATING