Pakistan Railways Form of Estimate: Capital Replacement

This document is a form estimate for Pakistan Railways containing details of the estimated cost of a work or sub-work, including quantities, rates, and allocations of costs to labor, material, overheads, and capital. It provides fields to record specifications, drawings, funds allocation verification, budget item numbers, estimate numbers, names of framers and references. It also includes sections for total costs, minor heads and sub-heads, cash and capital allocations, movement and receipt logs, and remarks.

Uploaded by

parwaz_kamal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views2 pages

Pakistan Railways Form of Estimate: Capital Replacement

This document is a form estimate for Pakistan Railways containing details of the estimated cost of a work or sub-work, including quantities, rates, and allocations of costs to labor, material, overheads, and capital. It provides fields to record specifications, drawings, funds allocation verification, budget item numbers, estimate numbers, names of framers and references. It also includes sections for total costs, minor heads and sub-heads, cash and capital allocations, movement and receipt logs, and remarks.

Uploaded by

parwaz_kamal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PAKISTAN RAILWAYS

Form of Estimate
Annex A
of 20
Labour Material
Rupees Rupees Rupees
Total
Stores in
stock Overheads
Rupees Rupees
Report and Justification.
Accounts Officer.
Sanction registered as No
Dated of 20

Agent / C.M.E. / Dy C.M.E / S.M.W.


Specification ..
Drawing and annexures ..
Incidence and Allocation verified (subject to
the check note attached). This requires the
sanction of
.....
..
Funds to be provided from budget for . Item No ...
.... directly or by reappropriation.
No Datedof 20
Total
Revenue
Work Nature
Cash
Deposit works
Capital
Replacement
Estimate No. .. .
Framed by
Reference ..
Name of work ..
PAKISTAN RAILWAYS
Form of Estimate
Annex A
Rupees Rupees Rupees
Rupees Rupees Rupees Rupees Rupees Rupees Rupees Rupees
To
Dispatching Clerk's
initials and date
Receiving Clerks initials and date
Total
Minor heads Main and sub-heads
Cash
Movement of Estimate
Allocation Statement
Capital
Revenue ..
Replacement ....
Total .
Total .
Total .
Heads of Account
Stores Total
Remarks
Details of estimated cost of ..(Description of work or sub work)
Allocation Cost
From
Replacement Revenue
Serial
number of
items
Description
of items of
work
Quantity
estimated Rate Labour Material Overheads Capital