100% found this document useful (1 vote)
142 views1 page

Cyclone

Uploaded by

EDUARDO
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
142 views1 page

Cyclone

Uploaded by

EDUARDO
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Client: Project: Plant/Area: WO #: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 38 39 40 41 42 43 44 45 46 47 48 49 50 51 REV:

Rev

DATA SHEET
CYCLONE
Equip. No: Equip. Name: ADL Doc. No: DESCRIPTION Quantity required: (mm) Nominal rated capacity GENERAL To operate in series with: Discharging into: PARTICULATE GRADATION mm / MESH filtration IND. WT %

ENG-DAT-000070

Rev: 0

Service: Nomial diameter

(m3/h)

To operate in parallel with: Code: DESIGN DATA/OPERATING CONDITIONS Type of process classification Gas handled Particulate handled (kg/m3) Bulk particulate density Max Op. Min Op. Design (act. m3/h) Capacity Particulate capacity (kg/h) Inlet pressure (kPag) Inlet temperature (C) Relative humidity (%) Cp/Cv Compressibility Corrosive/erosive agent pH: Gas / particulates hazardous flammable explosive Other: Chlorine / H2S / H2SO4 (ppm)

CUM. WT %

SITE AND UTILITY DATA Location: indoor outdoor grade under roof Wind speed (km/h) Electrical class.: CL Gr Div Winterisation required Tropicalization required: Altitude (m) Barometer (kPaa) (C) Ambient temperature min max Cone angle Relative humidity min max MATERIAL OF CONSTRUCTION PERFORMANCE Feed chamber Cone Duty Continuous Intermittent(start/day) Vortex finder Fastners Pressure drop, design (kPa) Overflow launder Apex holder Efficiency (%) Spigot liner Cone liner (actual m3/h) Feed chmbr. liner Minimum continuous flow: Supports Time between cleanings (days) Refactory lining CONSTRUCTION QA INSPECTION AND TEST WEIGHT (kg) THICKNESS (mm) Shop inspection Feed chamber Hardness test for Feed chamber liner Material certs Casing Liner Cone Welding MP DP RT UT Cone liner SURFACE PREPARATION, PAINT and SHIPMENT Vortex finder Manufacturer standard Feed inlet Client standard See specification Total dry weight Other Total operating weight Shipment Domestic Export Export boxing req. Over all dimensions (l/w/h) (mm) Outdoor storage more than 6 mo NOZZLE CONNECTIONS Description No Size (NPS) Rating Facing Position Type External loads (N & Nm) (mm) FX FY FZMX MY MZ Feed inlet Particulate outlet Gas outlet Other NOTES

REVISION LOG DESCRIPTION DATE BY CHK'D APP'D

Source Doc: DS.131.0011M.CAL.R00

1 of 1

You might also like